Menu

Salim HAMMI

NANCY

En résumé

14 years of experience in telecommunication industry, with project management experience on wireless Networks Rollout and swap projects .and 3 years of experience in data processing management.
I worked in multi-cultural environment for various worldwide operators and vendors with multiples technologies: GSM, UMTS , LTE with all site typologies (Indoor BTS, Outdoor BTS, Greenfields sites, rooftop sites, Micro BTS and others including IBS: In Building Solution).
managed many steps of projects lifecycles: LAUNCH, DEPLOYEMENT (ROLLOUT), and SWAP.

Mes compétences :
Télécommunications
Management
Voix sur IP
Développement commercial
GSM
LTE / 4G
UMTS/WCDMA
SWAP /ROLLOUT
Alcatel
3G Networks
2G Networks
contractors management
Budget management
BSS (Business Support Systems)
TECHNICAL TROUBLESHOOTING SUPPORT
Civil works management
negotiators management
manage all installations
contractors coordination
UML/OMT
Top Management
Team Management
TROUBLESHOOTING SUPPORT
Siemens Hardware
Radio optimization management
Purchase Orders
Project Validation Management
Project Management
Procurement assistance
PROJECT PLANNING
Operating Systems
OSS (Operating Support Systems)
Network planning
NETWORK DEPLOYMENT
Motorola Hardware
Microsoft Windows
Microsoft Project
Microsoft Office
MOBILIS NETWORK DEPLOYMENT
Logistic management
Irritable Bowel Syndrome
Implementation Management
INTERNAL TEAMS MANAGEMENT
HR Management
HLR
FUNCTIONAL SKILLS
Electronic maintenance
EM-1
Computer maintenance
Civil works Planning
Bug Tracking System
Autocad
Antennas
Adobe Photoshop

Entreprises

  • DAVIDSON FRANCE - ROLLOUT MANAGER

    2016 - maintenant CROZON PROJECT (SFR / BOUYGUES TELECOM NETWORKS POOLING & RAN SHARING)

    * CIVIL WORKS/SITE PREPARATION CONCEPTION
    * SURVEY/SWAP SENARIO VALIDATION
    * EQUIPMENT PURSHASE
    * PO VALIDATION
    * SUBCONTRACTORS / INTERNAL TEAMS MANAGEMENT
    * PROJECT PLANNING
    * CLIENT MEETINGS
    * KPI's SATISFACTION FOLLOW UP
    * FREQUENCIES SWITHING PLANNINGS
    * CATCHING-UP WORKS QUALITY ON THE FIELD
  • ALCATEL LUCENT - ATI

    Paris 2015 - 2016 SWAP ET DEPLOIMENT DU RESEAUX ORANGE REUNION/MAYOTTE 2G/3G (900/1800/2100) et LTE 4G (1800)
  • ERICSSON - LTE ENGINEER

    MASSY 2014 - 2014 ORANGE FRANCE LTE CARRIER AGGREGATION PROJECT

    LTE Digital Units Swap: replace DUL units by DUS units to activate CARRIER AGGREGATION.
  • ERICSSON FRANCE for ORANGE France - REGIONAL FIELD TIGER TEAM & technical referent (TROUBLESHOOTING)

    2011 - 2015 SWAP ET DEPLOIMENT DU RESEAUX ORANGE FRANCE 2G/3G (900/1800/2100) et LTE (4G/800/2600)
  • AFD TECHNOLOGIES - LTE ROLL-OUT PROJECT SUPERVISOR

    PARIS 2011 - 2014 Job title: Field Tiger Team & TECHNICAL REFERENT.

    ( 2G/3G/LTE ROLL-OUT PROJECT SUPERVISOR & TROUBLESHOOTING SUPPORT)

    ORANGE FRANCE 2G/3G MASS SWAP & ROLL-OUT (More than 14000 sites)
    * CIVIL WORKS VALIDATION
    * SURVEY/SWAP SENARIO VALIDATION
    * COMMISSIONNING OF RBS
    * INSTALLATION VALIDATION ;
    * TECHNICAL TROUBLESHOOTING SUPPORT: COMMISSIONNING & INTEGRATION ;
    * KPI's Analyzing & optimization. ;
    * QoS Incidents resolving (remotely & locally)
    Technical Environment:
    * 2G/3G ERICSSON RBS 6000 :INDOOR ,OUTDOOR.software Tools : OSS,EM,OMT,BS Management .... ;
    * ALU EQUIPMENT
    * NSN EQUIPMENT
  • ALYOTECH - TELECOM ROLL-OUT PROJECT AUDITOR

    Antony Cedex. 2010 - 2011 3G PROJECT ORANGE TUNISIA : project controls and acceptances consultant:
    * Civil Works.
    * Electrical installation.
    * As-Builts & costs validation.
    Technical Environment:
    * 2G/3G HUAWEI EQUIPMENTS.

    Project: SFR FRANCE :
    * Site Preventive visits.
    Technical Environment:
    * ALCATEL/LUCENT -NEC-NSN.
  • ALYOTECH INGINEERING pour ORANGE TUISIE - AUDIT DU RESEAU 3G ORANGE TUNISIE

    2010 - 2011 AUDITS
  • NETWORKERS MSB - TURNKEY PROJECT MANAGER & CONSULTANT

    2009 - 2009 Project: BINTEL USAN GABON (NETWORK LAUNCH)

    * Finalize the first phase of the network. ;
    * Integration of all sites construction , installation and integration.
    * Finalizing Switch room and validation of VSAT installation.
    * Starting phase 2 (backbone deployment from capital to south of Gabon
    * Deployment of 40 sites in Libreville;
    * Construction of 1 Switch Room.
    Technical Environment:
    * HUAWEI Equipments: BSS-HLR-IN/NSS.
    Project: GABON TELECOM LIBERTIS (NETWORK DEPLOYMENT PHASE 3).

    * Network planning.
    * Budget management.
    * Equipment ordering.
    * Custom cleaning.
    * Logistic management.
    * Sub-contractors management. ;
    * Deployment - including Site acquisition, designs, installation
    & Integration, Quality, Final acceptances test and installations control.
    * Validation of As-built documents.
    * Migration from Alcatel Platform to HUAWEI
    * Swap BTS's from Motorola and ALCATEL to HUAWEI ;
    * Deployment of 65 sites in all areas in Gabon within the capital Libreville (outdoors and indoors). ;
    * Deployment of 27 solar system sites. ;
    * Realization of backbone line from north to south of GABON. ;
    * 1 new Switch Room.
    Technical Environment:
    * HUAWEI BSS Equipments.
    * HUAWEI and ALCATEL HLR.
    * HUAWEI and ALCATEL IN/NSS.
  • E-VODAFONE - Installation auditor

    2008 - 2008 SITE VALIDATION COSULTANT. (site Acceptances )

    * HUAWEI equipments .
  • HUAWEI TECHNOLOGIES LIBREVILLE GABON - Rollout Project manager (Gabon telecom project & Bintel Azur Gabon=

    2008 - 2010 Project Management : BSS Rollout methodologies.
    Site acquisition : survey, TSSR validation, negotiators management and Kick-off meetings.
    Engineering and designs. Validation of detailed site designs.
    Strong implementation management: civil works and installation subcontractors management under HSEQ(health, safety, environmental and quality) requirements.
    Project validation management: validation of PAT , PAC and AS-BUILT.
    Partner consultant and coordinator: support for integration and Radio optimization management.
    Reporting to high management.
  • British Petroleum - DATA PROCESSING DEPARTMENT MANAGER

    Cergy 2001 - 2003 Project :Construction of general headquarter.
    * Purchasing IT equipments and manage all installations.
    (Computers, printers, hubs, cables...)
    Technical Environment:
    * All computers' manufacturers.
    *

Formations

Pas de formation renseignée

Réseau

Annuaire des membres :