2013 - 2015Power plant installation site study (Alba Nova 1 in Corsica France, WECSP Jordan). Managed electric grid connexion procedures ; Study and negotiation grid injection policy (power production management) for CSP LFR power plants;
Technology design:
— plant internal electric supply system and data;
— solar tracking system : wrote specification for the solar tracking system (control, motors, power
supply, mechanical transmission) with support from the R&D department;
— writing of P&ID, specifications, data sheets, lists, manuals, descriptions, for electric and instru-
mentation equipments;
— identified and contacted suppliers;
Technological project management:
— project manager for solar field motors, mirror cleaning system, I&C system, plant internal
electric supply system;
— built, wrote and negotiated specification with suppliers (turbine, motors, transformer, electrical,
SCADA, etc); Conducted review meetings with suppliers;
— established and monitored schedule and budget (MS Project);
Study on the electric grid impact of the delocalized and variable non predictable production of energy by renewable sources (PV, wind, micro hydro...).