Entreprises

  • S.A.S. SOLAR EUROMED - Project Manager

    2013 - 2015 Power plant installation site study (Alba Nova 1 in Corsica France, WECSP Jordan). Managed electric grid connexion procedures ; Study and negotiation grid injection policy (power production management) for CSP LFR power plants;
    Technology design:
    — plant internal electric supply system and data;
    — solar tracking system : wrote specification for the solar tracking system (control, motors, power
    supply, mechanical transmission) with support from the R&D department;
    — writing of P&ID, specifications, data sheets, lists, manuals, descriptions, for electric and instru-
    mentation equipments;
    — identified and contacted suppliers;
    Technological project management:
    — project manager for solar field motors, mirror cleaning system, I&C system, plant internal
    electric supply system;
    — built, wrote and negotiated specification with suppliers (turbine, motors, transformer, electrical,
    SCADA, etc); Conducted review meetings with suppliers;
    — established and monitored schedule and budget (MS Project);

Formations

  • University Of Perpignan Via Domicia

    Perpignan 2008 - 2012 Doctor of Philosophy

    Study on the electric grid impact of the delocalized and variable non predictable production of energy by renewable sources (PV, wind, micro hydro...).

Réseau

Pas de contact professionnel

Annuaire des membres :