Menu

Selcuk OZDEMIR

OSMANGAZI, BURSA

En résumé

Specialties: Creative thinking, analytical problem solving, strategic thinking, logical analysis, passion to win, goal oriented, honesty, willing to cooperate, excellent management and communication skills.

Keep moving on with challenges, never and ever give up.

Mes compétences :
FMEA
Transaction Processing Monitor
Manage the production team stability
APQP
Welding
Statistical Process Control
Sheet metal
SMP
SAP
Powertrain
Microsoft Word
Microsoft Windows
Microsoft PowerPoint
Microsoft Outlook
Microsoft Office
Manage project development
Manage profitability
Lotus Notes/Domino
Kaizen
ISO 14001 Standard
Headlights
Extrusion
Cash Flows
CATIA
BPCS
Autocad

Entreprises

  • BELKA Rubber / Coşkunöz Holding - Marketing Supervisor

    2015 - maintenant Web page: www.belka.com.tr/en/

     Business development of a regional / global strategy to identify growth areas and targets.
     To establish new business relationships with potential customers in order to achieve business volume target for sealing elements, brake system components, rubber hoses, dampers, metal-rubber and plastic-rubber technical parts.
     Manage the commercial topics with the customer related to quality, delivery, pricing during the RFQ phase.
  • COŞKUNÖZ HOLDING - Project Leader

    2011 - 2015 Project Leader, COŞKUNÖZ HOLDING, Bursa, Turkey
    Present * Sales and Projects Department

     Lead quotation of new business, present and negotiate with key customer contacts in order to win new business.
     Lead all commercial aspects of launched business throughout the product lifecycle (design and process change quotation/negotiation as well as other customer/internal requests).
     Manage profitability, cash flow and debt payments are made on a timely basis (€7M endorsement in 2014).
     Manage project development from initiation to closure (OEM:Renault,Dacia,Mercedes,Opel,Ford).
     Start up sheet forming dyes, assembly&measurement control fixtures, montage&welding equipments for mass production and realize serial stamped&assembly parts production of sheet metal&plastic materials in the dyes produced in-house or out-house.
     Achieve with project teams and stakeholders to complete the project charter outlining, scope, goals, deliverables, required resources, budget, quality and timing.
     Motivate and supervise project team members and others contracted to work on the projects.
     Provide a project schedule to identify when each task will be performed.
     Resolve any issues and solve problems throughout the project life cycle.
  • FICOSA INTERNATIONAL - Project Quality Engineer

    2008 - 2011  Pilot and perform project activities related to quality since offer until the complete execution of the affair (SOP + 6 months) by using risk management tools (FMEA), problem solving methods (8D, QRQC) and quality documents (APQP, PSW, MSA, SPC, Cp/Cpk, PPAP) for parts of Automatic and Manual Shifters, Parking Brakes Systems and Washing Systems. (OEM: Renault, PSA, Ford).
     Pilot, implement and set up of methods Kaizen, 5S, TPM, Kanban, Just in Time, Poka-Yoke, Auto-Quality, QRQC, Standardization, MQA, Lean Manufacturing Systems, The standards of ISO/TS 14001 and ISO/TS 16949.
     Manage the team of project and quality of 5-10 persons.
     Take immediate corrective actions (sorting, inventory, isolation, reinforced control, visual aids, …) & implement the best permanent corrective actions (change systems and documents) to solve the problem of the internal or external customers.
     Review/approve qualification plan with team (design validation, process validation) in order to ensure product reliability and compliance with internal and external requirements
  • Renault - Chef d'UET (UET: Special Production Team in Vehicle Montage Department)

    Boulogne-Billancourt 2004 - 2008 From 08.2007 to 07.2008 * UET Assembly of Wheels, Powertrain, Engine, Sub Casing, Exhaust and other…
    From 02.2006 to 08.2007 * UET Assembly of Headlights, Seat Belt, Door Panel, Bumpers, Battery and other…
    From 07.2004 to 02.2006 * UET Assembly of Group Brake System, Door, Seat, Inner Panel Equipments ext…

     Manage the production team stability and efficiency according to daily vehicle production goals by ensuring the quality, cost and deadline.(60 vehicles/hour)
     Pilot, implement and set up of methods Kaizen, 5S, TPM, Kanban, Just in Time, Poka-Yoke, Auto-Quality, QRQC, Production Indicators, Ergonomic of the Teams, Polyvalence, Standardization, MQA, SMP, QC Story, The standards of ISO/TS 14001 and ISO/TS 16949.
     Achieve the audits objectives of Performance System of Renault, Process, Machines and Operators.
     Manage and supervise the teams of production 20 - 50 operators.
     Define, improve conditions of work and the commitment of the operators.
     Participate in the integration and the development of new projects and collaborate in order to start up with methods, industrialization as well as the engineering department.
  • MIMAS A.S. - Production Manager

    2002 - 2004  Manage the production team stability and efficiency according to firm strategic goals by ensuring quality, cost and deadline with 50-80 operators.
     Install and assemble the extrusion machines. IÇDAŞ (Çanakkale 2004)
     Install and assemble the oil pipelines, oil tanks and steel construction. Petrol Ofisi (Antalya 2003)

Formations

  • BAC+4 Dumlupinar University - Technical Education Faculty (Kütahya)

    Kütahya 1998 - 2002 Diploma of Machining Teaching
  • Technique Lycee Of Kocaeli, (Kocaeli)

    Kocaeli 1993 - 1997 Diploma of Mechanical Department
Annuaire des membres :