Menu

Simon BERGER

TOULOUSE

En résumé

Pas de description

Entreprises

  • TSM3D - AIR DIVER & DMT

    2013 - maintenant LIBYA
    AL-KHALIJ project
    3m*12m fiber pipes installation.
    Supervisor : Dominique BILLON
  • STAPEM Offshore - Air Diver

    2013 - 2013 Cleaning before inspection. Strain gauges replacement and cables installation on mooring chains. FPSO PAZFLOR, DALIA and GIRASSOL and offloading buoys, bloc 17, Angola
    Supervisor : William Mercier
  • TSMC Congo - Air DIver DMT

    2012 - 2012 CONGO
    OCEAN CONFIDENCE (Diamond Offshre) : Cleaning with Water Jet and Sandblaster before inspection. Sea Chest covers installation and removal. Employed as Air Diver and DMT. Supervisor : Antoine CORTEZ
  • STAPEM - Air Diver DMT

    2012 - 2012 ANGOLA
    PORTO AMBOIM : Metal and HDPE pipes removal using cold cutting hydraulic tool. Employed as Air Diver and DMT. Supervisor : Dominique STOLZ
  • STAPEM - Air Diver DMT

    2012 - 2012 ANGOLA
    Cutting and installation of 4 risers on FPSO (GIRASSOL TOTAL, BLOCK17)
    Oxy-arc cutting, installation of new clamps, inspection and cleaning.
    Supervisor : Dominique STOLZ
    DIVER MEDIC TECHNICIAN
  • LD TravOcéan - Air Diver

    2012 - 2012 UNITED ARAB EMIRATES
    Video survey of a futur cable road between Sir Bani Yas island and the coast, Soil and Water sampling.
  • Hydrokarst - Air Diver

    SASSENANGE 2012 - 2012 MOROCCO
    Constrution of the commercial port of Tanger Med 2. Reparation and installation of concrete coffers using all kind of hydraulic tools, concreting, cutting, inspection ...