-
TSM3D
- AIR DIVER & DMT
2013 - maintenant
LIBYA
AL-KHALIJ project
3m*12m fiber pipes installation.
Supervisor : Dominique BILLON
-
STAPEM Offshore
- Air Diver
2013 - 2013
Cleaning before inspection. Strain gauges replacement and cables installation on mooring chains. FPSO PAZFLOR, DALIA and GIRASSOL and offloading buoys, bloc 17, Angola
Supervisor : William Mercier
-
TSMC Congo
- Air DIver DMT
2012 - 2012
CONGO
OCEAN CONFIDENCE (Diamond Offshre) : Cleaning with Water Jet and Sandblaster before inspection. Sea Chest covers installation and removal. Employed as Air Diver and DMT. Supervisor : Antoine CORTEZ
-
STAPEM
- Air Diver DMT
2012 - 2012
ANGOLA
PORTO AMBOIM : Metal and HDPE pipes removal using cold cutting hydraulic tool. Employed as Air Diver and DMT. Supervisor : Dominique STOLZ
-
STAPEM
- Air Diver DMT
2012 - 2012
ANGOLA
Cutting and installation of 4 risers on FPSO (GIRASSOL TOTAL, BLOCK17)
Oxy-arc cutting, installation of new clamps, inspection and cleaning.
Supervisor : Dominique STOLZ
DIVER MEDIC TECHNICIAN
-
LD TravOcéan
- Air Diver
2012 - 2012
UNITED ARAB EMIRATES
Video survey of a futur cable road between Sir Bani Yas island and the coast, Soil and Water sampling.
-
Hydrokarst
- Air Diver
SASSENANGE
2012 - 2012
MOROCCO
Constrution of the commercial port of Tanger Med 2. Reparation and installation of concrete coffers using all kind of hydraulic tools, concreting, cutting, inspection ...
Nitrox 45/55