Hangars
Solidworks
SolidConcepts
Pro/ENGINEER
Microsoft Word
Microsoft PowerPoint
Microsoft Excel
CATIA
Bug Tracking System
Autocad
Audit
Welding
Roofing
Project Management
Petroleum
Microsoft Office
Supervision of GRP activity and environment adapta
Procurement
Microsoft Windows

Entreprises

  • YAMAL LNG - Structure Superintendant

    2014 - maintenant * Yard's Focal Point - Structure Superintendant FWP4a&b - YAMAL Project
    - Represent the Company with the contractors. ;
    - Following the status of the production, material stock and shipment ;
    - Optimize the activities of construction in dialogue with the operational support. ;
    - Prepare and oversee personally the delicate or risky activities of construction. ;
    - Participate in the technical and operational analyses, the audits and the inspection. ;
    - Check and approve the procedures of construction and the welding book. ;
    - Anticipate the potential problems, plan the degraded situations and the situations of standby. - insure and check the daily reporting of construction.
  • YAMAL LNG - Management mechanical work

    2014 - 2017 * Management mechanical work - FWP4a&b - Yard's Focal Point SOE3.
    Pre-fabrication of 70.000T of pipe rack and secondary structure.
    - Represent the Company with the contractors. ;
    - Following the status of the production (fabrication, blasting and painting), material stock and shipment. ;
    - Optimize the activities of construction in dialogue with the operational support. ;
    - Prepare and oversee personally the delicate or risky activities of construction. ;
    - Participate in the technical and operational analyses, the audits and the inspection. ;
    - Check and approve the procedures of construction. ;
    - Anticipate the potential problems, plan the degraded situations and the situations of standby. - insure and check the daily reporting of construction. ;
    - Coordination between packing activity and fabrication. ;
    - Analyze and valid MFSR.

    * Company's representative - MWP2a - Construction coordinator MSSI.
    Pre-fabrication of modules - deck's parts
    - Represent the Company with the contractors. ;
    - Following the status of the production, material stock and shipment.
    - Daily and weekly report for the main yard at Batanga.
  • Total - Structure / Piping Supervisor

    COURBEVOIE 2013 - 2014 Represent the Company with the contractors. ;
    - Prepare and oversee personally the delicate or risky activities of construction. ;
    - Anticipate the potential problems, plan the degraded situations and the situations of standby. - insure and check the daily reporting of construction.
    - Participate in the technical and operational analyses, the audits and the inspection.
    - Check and approve the procedures of construction and the welding book.
    - Oversee the staff of construction and check the external service providers.
    - Optimize the activities of construction in dialogue with the operational support.
    - Receive the various phases of works. ;
    - Follow the writing and the realization of the final document.
  • Total - Superviseur

    COURBEVOIE 2013 - 2014 * Superviseur Structure / Piping Projet Anguille CTI3
    - Représenter la Compagnie auprès des entrepreneurs de construction. ;
    - Préparer et superviser en personne les activités de construction délicates ou risquées. ;
    - Anticiper les problèmes potentiels, prévoir les situations dégradées et les situations de stand-by. - Assurer et contrôler le reporting quotidien de construction ;
    - Participer aux analyses techniques et opérationnelles, audits et inspection. ;
    - Contrôler et approuver les procédures de construction et le cahier de soudage. ;
    - Superviser le personnel de construction et contrôler les prestataires de services externes. ;
    - Optimiser les activités de construction en concertation avec le support opérationnel. ;
    - Réceptionner les différentes phases de travaux. ;
    - Suivre la rédaction et la constitution du dossier final.
  • Total - Piping/Structure supervisor

    COURBEVOIE 2013 - 2014 * Piping (CS + GRP) / Structure Supervisor Anguille Project CTI3
    Revamping and water treatment on 2 sites ( Anguille & Torpille)
    - Represent the Company with the contractors. ;
    - Prepare and oversee personally the delicate or risky activities of construction.
    - Anticipate the potential problems, plan the degraded situations and the situations of standby. - insure and check the daily reporting of construction.
    - Participate in the technical and operational analyses, the audits and the inspection.
    - Check and approve the procedures of construction and the welding book.
    - Oversee the staff of construction and check the external service providers.
    - Optimize the activities of construction in dialogue with the operational support.
    - Receive the various phases of works. ;
    - Supervision of GRP activity and environment adaptation.
    - Follow the writing and the realization of the final document.
  • TOTAL GABON - Superviseur Structure Piping

    2013 - 2014
  • PONTICELLI - Responsable préparation

    2012 - 2012 Contrôle de l'ingénierie structure DORIS (3 plateformes) - Préparation avec équipe locale - Suivi préfabrication atelier - Rapport journalier d'avancement structure - Suivi avec le service achat pour modifications des MTO
  • PONTICELLI - Lead preparation

    2012 - 2012 * In charge of preparation Piping / Structure OFON2 Project
    - Control of the engineering structures DORIS (3 platforms with structure extension, creation of staircase and pipe racks).
    - Preparation with local team.
    - Followed prefabrication workshop.
    - Daily report of progress structures. ;
    - Followed with the purchasing department for modifications of the MTO.
  • PONTICELLI - Responsable Cellule Méthode et Preparation

    2012 - 2012 * In charge of preparation Piping / Structure OFON2 Project
    - Control of the engineering structures DORIS (3 platforms with structure extension, creation of staircase and pipe racks).
    - Preparation with local team.
    - Followed prefabrication workshop.
    - Daily report of progress structures. ;
    - Followed with the purchasing department for modifications of the MTO.
  • GNCAC - Deputy project manager

    2007 - 2012 Leader engineering (STR, PVV and GC) and coordination with the subcontractor (piping routing and pipe racks supports).
    - Cost control, order of materials/equipment and means of implementation.
    - Follow workshop and daily report of the progress prefabrication.
    - Follow construction on site with daily report of the assembly and the coordination with the subcontractors (SPIE, SOCOFRAN).
    - Design of GRP's ISO, MTO and preparation.

    * Deputy project manager, Moho-Bilondo Integration to DJENO (TOTAL)

    - Lead engineering (pipe racks, shelters, tanks and staircase structure and piping GRP + support).
    - Supervision / coordination of the prefabrication / purchase / welding book for steel structure (1200T) at the subcontractor VILQUIN (specialized company in structure).
    - Preparation of MTO and supervision of GRPs' fabrication inside workshop.
    - Preparation and optimization for the shipping (bolted assembly for the pipe racks).
    - Daily follow-up of advances then weekly for validation of the invoicing
    - Preparation commands with follow-up of the receptions following schedule.
    - Realization of lifting and assembly procedure for the pipe racks.

    * Engineering Manager (6 draftsmen).

    Calculation, feasibility, realization and coordination with the different sectors (QAQC, materials, workshop, site)
    - Rehabilitation (roof and bottom) of petroleum tank 14.000m3 (CORAF).
    - Realizations of plans and lifting procedure for Boat-landings as well as oil equipment (TOTAL).
  • GNCAC - Deputy project manager

    2007 - 2012 Leader engineering (STR, PVV and GC) and coordination with the subcontractor (piping routing and pipe racks supports).
    - Coast control / command of materials/equipments and means of implementation.
    - Followed workshop and daily report of the progress prefabrication.
    - Followed construction site with daily report of the assembly and the coordination with the subcontractors (SPIE, SOCOFRAN).

    * Deputy project manager, Moho-Bilondo Integration to DJENO (TOTAL)

    - Leader engineering (pipe racks, shelters, tanks and staircase structure/piping GRP).
    - Supervision / coordination of the prefabrication / purchase / welding book for steel structure (1200T) at the subcontractor VILQUIN (specialized company in structure).
    - Preparation and optimization for the shipping (bolted assembly for the pipe racks).
    - Daily follow-up of advances then weekly for validation of the invoicing
    - Preparation commands with follow-up of the receptions following schedule.
    - Realization of lifting and assembly procedure for the pipe racks.

    * In charge of engineering office (6 draftmen).

    - Rehabilitation (roof and bottom) of petroleum tank 14.000m3 (CORAF).
    - Realizations of plans and lifting procedure for Boat-landings as well as oil equipments (TOTAL).
    - Replacement of piping sea (TOTAL-ENI). ;
    - Sheds (SOCOFRAN-ENI), system stands (BRASCO-PN). ;
    - Shelters group cold, tank and pipe racks with lifting procedure (PERENCO).
  • GNCAC - Adjoint chef de projet

    2007 - 2012 Responsable ingénierie (STR, PVV et GC) et coordination avec le sous-traitant (data sheet). - Préparation devis/commande de matériels et moyens de mise en œuvre. ;
    - Suivi atelier et rapport journalier des avancements préfabrication. - Suivi chantier avec rapport journalier du montage et coordination avec les sous-traitants (SPIE)

    * Adjoint chef de projet, Moho-Bilondo Integration to DJENO (TOTAL)

    - Responsable études (structure/piping GRP). ;
    - Supervision/coordination de la préfabrication/achat/cahier de soudage (charpente métallique 1200T) chez le sous-traitant (VILQUIN). ;
    - Préparation commande avec suivi des réceptions suivant planning.

    * Responsable bureau d'études par intérim (6 dessinateurs).

    - Réhabilitation (toiture et fonds) de bacs 14.000m3 (CORAF). ;
    - Réalisations et procédure de levage de Boat-landings ainsi que des équipements pétroliers (TOTAL). ;
    - Remplacement de tuyauterie mer (TOTAL-ENI). ;
    - Hangars (SOCOFRAN-ENI), racks (BRASCO-PN). ;
    - Abris groupe froid et ballons (PERENCO).
    - Barge (FORALAC). ;
    - Chiffrage Oléo réseau + PCC Aéroport Brazzaville (SCLOG).

    * Chef de groupe projeteur SIAC, modélisateur 3D, charpente métalliques et tuyauterie (6 dessinateurs).

    - Réalisation de passerelles, bacs et cuves (TOTAL), racks et hangars (BRASCO-BRZ), boat-landing, tuyauterie acier/SVR, extension plate forme (GASMAN-MAERSK) et aménagements atelier/base vie (Weatherford, GNCAC).
    Modélisation 3D de plates-formes (TOTAL).
  • Couserans Construction - Stage de BTS dans

    2006 - 2006 l'entreprise CCM (Couserans Construction Métalliques), spécialisé en charpentes métalliques et serrureries.
    FORMATION SCOLAIRE

Formations

  • Parlym

    Marseille 2008 - 2008 Formation in piping and project management within PARLYM.
  • Parlym

    Marseille 2008 - 2008 Formation en tuyauterie et gestion de projet au sein de PARLYM.
  • Lycée Pierre Paul Riquet

    Saint Orens De Gammeville 2006 - 2007 Certified Product Instructor
  • Lycée Pierre Paul Riquet

    St Orens De Gamevill 2005 - 2007 Certified Product Instructor

    BTS CPI (Conception/ design of industrial products) at High School Pierre-Paul Riquet.
  • Lycée Deodat De Séverac

    Toulouse 2004 - 2006 Baccalaureate Degree

Réseau