Menu

Stéphane VAILLAND

LE MANS

En résumé

Please consult my updated profile on linkedin :
Mon profil : http://www.linkedin.com/in/svailland

Entreprises

  • ST-Ericsson

    maintenant
  • STMicroelectronics - Senior Project leader

    2012 - maintenant Projects Management:
    - 2012: System and SW project leader for 1st ModApp smartphone using STE internal Modem based on Android/Linux (220 p on several sites Le Mans, Bangalore, Lund, Grimstad, Bejiing). All SW activities prepared before engineering samples available using Virtual SoC approach in order to speed-up the system maturation once DB chip available.
    o Achievements: Android system boot in 1 week, All APE use cases in 2 weeks, Modem use cases in 3 weeks, 600 boards deployed in 10 weeks

    Team Management:
    - System Integration group manager including SW cycle, System investigation, transversal tests (stability, performances, …) skills

    Engineering:
    - From Dec 2012: Integration in ST projects & teams. Methods & Tools group leader with ST people in order to ensure best convergence on engineering domains as Defect & Change management, Configuration Management, Tests Management, Requirements Management, Developper environment, SW cycle, Architecture & Design tools, Documents Management, Planning Management, …
  • ST-Ericsson - Senior project leader

    2009 - 2012 Projects Management:
    - 2012: System and SW project leader for 1st ModApp smartphone using STE internal Modem based on Android/Linux (220 p on several sites Le Mans, Bangalore, Lund, Grimstad, Bejiing). All SW activities prepared before engineering samples available using Virtual SoC approach in order to speed-up the system maturation once DB chip available.
    o Achievements: Android system boot in 1 week, All APE use cases in 2 weeks, Modem use cases in 3 weeks, 600 boards deployed in 10 weeks
    - 2011 : SW project leader for 1st STE Application engine based on Android/Linux (30 p on several sites Le Mans, Bangalore, Lund, Grimstad)
    - 2010 : SW project leader for the 1st NXP Android/Linux smartphone system solution project (60 p on several sites Le Mans, Bangalore)
    - 2009 : SW project leader for 2G mobile phone system solution project (60 p on several sites Le Mans, Bangalore, Nuremberg)

    Team Management:
    - System Integration group manager (up to 60p) including SW cycle, System investigation, transversal tests (stability, performances, …) skills

    Engineering:
    - 2010 to 2011 : Methods & Tools convergence with LUND System Integration team around SW cycle, Continuous integration and Automatic tests framework with all tools & WoW operational by Dec 2011 in LMS site
  • NXP Semiconductors - SW Project leader

    Colombelles 2006 - 2009 Projects Management:
    - 2008 : SW project leader for 2G/3G mobile phone system solution project (100 p on several sites Le Mans, Bungalore, Nuremberg)
    - 2007 : SW project leader for 2G mobile phone system solution project (60 p on several sites Le Mans, Bungalore, Nuremberg)
    - 2006 : System integration project leader for 2G mobile phone system solution projects (12 p in Le Mans)

    Team Management:
    - 2007 to 2008: System Integration group manager (40p) including SW cycle, System investigation, transversal tests (stability, performances, …) skills
    - 2006: System Integration group responsible (12p)
  • Philips SemiConductors - System Integration Project leader

    2004 - 2005 Projects Management:
    - 2004 to 2005 : System integration project leader for 2G mobile phone system solution projects (12 p in Le Mans)
  • Skyworks - Customer project leader

    2003 - 2004 Customer project leader for several customers (asian & european) to put in mass production wireless phones based on Skyworks chipsets.
  • Philips - System Integration Project leader

    Suresnes 1998 - 2003 System Integration leader for different wireless phones from 2G to UMTS ones.
    - Telecom and System tests plan definition and coordination for these products up to mass production.
    - Leading a 5 people team to specify and perform the tests and to investigate and qualify failed tests before assignement to development teams for failure fixing
    - Delivering the product reference SW to all involved teams.
  • SerdB - Software and acoustics development engineer

    1995 - 1998 - Software Development engineer for PC vibration and acoustics analysis tools and measurement tests benches (Visual C++, Visual Basic)
    - Acoustic engineer to reduce vibrations and noises in industries
  • 01dB - Software Development engineer

    1992 - 1995 - Software development engineer for vibrations and acoustics measurements and real or offline processing softwares
    - Window driver development for a signal acquisition board
    - Signal acquisition board specification with a german sub-contractor

Formations

Réseau

Annuaire des membres :