Menu

Sylvain FAGUET

SURESNES

En résumé

Pas de description

Entreprises

  • Subsea 7 - Superintendant

    SURESNES 2014 - 2015 en charge du navire Simar Esperanca (navire de 100m de long, équipage 100 pax, capacité de levage de 100mT à plus de 2000m de profondeur)
  • Subsea 7 - Naval Architect - Project Engineer

    SURESNES 2011 - 2014 Onsite followup of modification done on a jack up vessel recently bought by Subsea 7 in Louisiana, US
  • Acergy - Naval Architect - Project Engineer

    2007 - 2010 2010-11: Design, Engineering & construction follow up of structural modifications for the conversion of the 110m Crane/Accommodation Barge Acergy Antares in a Pipelay Barge (integration of a 120mT SLay system)

    2009: Design & Engineering follow up of an articulated platform installed in the 750mT JLay tower system of the Pipelay Barge Acergy Polaris

    2009: Technical Support of the Crane/Accommodation Barge Acergy Orion

    2008: In charge of Accommodation refit onboard Pipelay Barge Acergy Polaris during its dry dock.
  • Bureau Veritas - Ingénieur Structure

    Puteaux 2007 - 2007
  • Marine Nationale - Chef de quart passerelle

    Paris 2005 - 2006
  • Phare de Chausey - Gardien de phare

    2001 - 2001

Formations

Réseau

Annuaire des membres :