SAIPEM
- Offshore Structure & Weight Control Engineer
Montigny-le-BretonneuxmaintenantPERIOD : August 2009 - up to date
PROJECT : SHTOKMAN FPU CCFT PROJECT (1st PHASE)
LOCATION: 650km Offshore Russia - Barents Sea
CLIENT : SDAG - SHTOKMAN DEVELOPMENT AG (GAZPROM/TOTAL/STATOIL)
MISSION :
- Topsides (40 000t), Hull & Turret Weight Monitoring & Control during CCFT Phase
- Structural Calculation: In place, Transit, Lifting & Blast analysis of the MEG/TEG Train C Module (>3500t) Primary Structure under Arctic Conditions(NSO/Fastrudl/Isymost)
- Structural Material Take Off (MTO)
PERIOD : May 2010 - April 2011
PROJECT : PETROBRAS FLNG FEED
LOCATION: Brazilian South Atlantic Ocean - Santos Basin
CLIENT : PETROBRAS NETHERLAND BV / BG GROUP / GALP / REPSOL
MISSION :
-Topsides, Hull & Turret Weight Monitoring & Control during front end engineering design (FEED)
-Structural Calculation: In place, Transit, Lifting & Blast analysis of the Debutanization & Depropanization Module Primary Structure(NSO/Fastrudl/Isymost)
PERIOD : October 2008 - July 2009
PROJECT : CLOV FPSO CCFT PROJECT
LOCATION: ANGOLA - BLOCK 17
CLIENT : TOTAL
MISSION :
- Hull and Topsides (20 000t) Weight Monitoring & Control during CCFT Phase - Structural Calculation:
In place, Transit and Lifting analysis of the Gas Compression Module (>1200t)Primary Structure(NSO/Fastrudl/Isymost)
PERIOD : February - March 2009 and August - September 2010
PROJECT : FLNG/FPSO Conceptual Engineering
CLIENT : restricted
MISSION :
Hull and Topsides weight control report of FLNG & FPSO floaters during conceptual engineering and engineering update
PERIOD : March - September 2008
INTERNSHIP : Steel Catenary Riser (SCR) Fatigue Damage Analysis
CLIENT : BUREAU VERITAS
MISSION :
Analysis and comparison of the various fatigue approaches: S/N curves approach(spectral, time stress, rainflow counting) and fracture mechanics/crack propagation approach(ECA)...
Responsible of the calculations (Flexcom, Crackwise…), analysis, spreadsheet developpement and final report