2015 - 20161. Data and Performance Analysis of Windmills
2. Periodical and Breakdown Maintenance of Windmills on site
3. Preparation of Power Generation reports and reviewing of the performance in monthly meetings
2014 - 20151. Installation and assembly of Drives, pulleys and integrator to paper and pulp machines
2.Maintenance and attending breakdowns of machines occured during the running of the pulp and paper machines
3. Review and analyse the performance and durability of the parts installed in various machines and the reason for the failure of parts.
4. Implementation of lean concepts to reduce wastage and increase revenue.