OTV/MPG Veolia Water System
maintenant
-
Bouygues offshore
- MAINTENANCE Supervisor
maintenant
Customer: BOUYGUES-OFFSHORE
Unit: Lay barge BOS 355 – pipeline unit product
Place: ELEFSINA - Greece
Date: 08/2001 to 03/2002
2 Externals missions of MAINTENANCE Supervisor for BOUYGUES-OFFSHORE on the LAY BARGE BOS 355 in Greece. Management of 2 electricians for preventive maintenance, safety materials, upgrade for the materials. Drafting of "maintenance reporting", organization of the operations on great work, Ingeneering, evaluation of the quantities and costs, management of the teams and materials for the execution of the building site, tests and acceptance of work of the service providers and the service of maintenance.
-
Intertek Group
- Inspecteur / Auditeur
London
2016 - maintenant
Réalisations d'inspections et d'audit auprès d'acteurs industriels sur des projets O&G
-
Total
- E&I Superintendent
COURBEVOIE
2015 - 2016
E&I Superintendent for Total Gabon to study and modify 6” gas pipe line modification for Instrumentation and power. Manage works for trench, cable pulling, wiring for ESDV and SDV valve installation, back-up capacity and liner, commissioning and start-up under company safety policies.
-
ExxonMobil
- E&I Auditor
Notre-Dame de Gravenchon
2015 - 2015
MISSION Electrical audit and validation (FAT) for Exxon MCC and LV power distribution panel (TGBT), edit punchlist.
-
TOTAL Angola (TEPA)
- Hook-up Electrical Superintendent
2013 - 2015
MISSION Hook-up Electrical Superintendent to modify FPSO Girassol and Dalia and upgrade material. Electrical for TLM and 11/33kV Transformer, HV cubicle, LV cabinet installation, pulling cable, connections, precom and commissioning...
-
PEMEX - SMS JV
- E&I Superintendent
2012 - 2013
MISSION E&I Superintendent to rebuilt and refurbish 3 drilling rig jack-up (AT1-2-3)
In charge of modification and commissioning for electrical material (power generator, SCR and MCC cubicle), communication, fire and gas, jacking system, and all drilling material (TDS 4H and 4S, MP, DW,…) and instrumentation.
-
TOTAL Congo (TEPC)
- E&I Superintendent
2011 - 2012
Customer: Total E&P Congo
Unit: NORD Sites – Sendji - Yanga
Place: Congo (Offshore)
Date: 01 /2011 to 09/2011
MISSION Electrical Supervisor new works for RTE project (replacement of electrical panel MV-LV) for Sendji and Yanga North Sites (SEF1 to 4, SEFP and YAQ, YAFP, YAF1, 2, 4. Manage contractor team and supervise planning to respect project target date.
Customer: M&P (Caroil drilling)
Unit: onshore Rig #4 - #9 - #11 - #16
Place: Gabon (Port Gentil)
Date: 08 /2010 to 12/2010
MISSION of “E&I Supervisor”. Management of maintenance department operations on the RIG (4 pieces). Follow-up of the construction sites of the RIG, the methods, controls preventive and curative tasks on the various equipments (SCR, ECR, DRAWWORKS, MUD PUMP, ROTARY BANKS, TDS CANRIG, BCS, ELMAGCO BRAKE, CATERPILLAR Engines (3412-3408-398-399), POWER HV, MV, LV cubicles, VFD, accommodations A/C, PLC …) and process of the drilling on the exploitation field. Written "maintenance reporting", organization of the operations on the new works of installations of the new equipments, engineering, evaluation of the quantities and the costs, crews management, budgets " cost control " and materials for the execution of construction sites, the tests, the attempts and the official acceptances of work of the providers of services and the service of maintenance.
GMAO user: MAXIMO - MRO
Customer: OTV (Veolia water)
Unit: sea water desalinisation plant and sewage treatment
Place: Sur (Oman) / Abu-Dhabi (UAE)
Date: 08 /2009 to 07/2010
Mission expatriate for OTV VEOLIA on SUR desalination water plant in Sultan of Oman and water treatment in Abu Dhabi, supervisor for electrical and instrumentation department. Make commissioning and start-up for all material in plant (sea water pump, remote control valves (Bernard, Auma & Rotork actuators), Reverse Osmosis process, booster pump, HP pump 11 Kv, DWEER, Flow meter (Yokogawa, E&H), Instrumentation Rosemount, blowers, beach well submersible pump INDAR, LV, MV, HV supply, VFD…).
Provide specific expertise relevant to the Engineering and QA/QC activities to be carried out for the design, construction completion, commissioning and handover of Projects in compliance with applicable Laws, Codes and Standards, power generation 11 KV SDMO genset for 2 unit 8 and 12 MW.
Monitoring: SCADA - Schneider
-
SHELL
- E&I Superintendant
Paris
2011 - 2012
Customer: SHELL
Unit: Drilling rig
Place: Gabon - Africa
Date: 10 /2011 to now
Mission expatriate for Shell as E&I Superintendent in Gabon. Revamping, Installation, commissioning and start-up for 5 drilling rig in Toucan area. Follow-up of the construction sites of the RIG, the methods, controls preventive and curative tasks on the various equipments after installation and calibration (SCR, DRAWWORKS, MUD PUMP (DC motors Joliet), ROTARY table, TDS TESCo 350 EXI 600 with VDF house, BCS, ELMAGCO BRAKE, CATERPILLAR Engines, LV (600v) cubicles, Compressors, Transformers, VFD, PLC, CCTV, base life, …) and process of the drilling on the exploitation field. Manage also maintenance system on place. Write "maintenance reporting". Drilling monitored by HMI NOV – MD TOTCo with PLC GE Fanuc.
CMMS/GMAO User: RigMS
-
AOS
- PMS
2008 - 2009
Customer: AOS (Atlantic Oilfield Service)
Unit: LAND RIG
Place: Dubaï (EAU) – Karachi (Pakistan) - Iraq
Date: 08 /2008 to 08/2009
MISSION of “PMS”. Management of maintenance department operations on the RIG. Follow-up of the construction sites of the RIG, the methods, controls preventive and curative tasks on the various equipments (SCR, ECR, DRAWWORKS, MUD PUMP, ROTARY BANKS, TOP DRIVE TDS LETOURNEAU, BCS, ELMAGCO BRAKE, CATERPILLAR Engines, DC Motors GE 752, ANCHOR WINCHES, cabins POWER HV, MV, LV, accommodations A/C, PLC GE FANUC 90-30, VFD…) and process of the drilling on the exploitation field. Editorial staff of "maintenance reporting ", organization of the operations on the new works of installations of the new equipments, engineering, evaluation of the quantities and the costs, crews management, budgets " cost control " and materials for the execution of construction sites, the tests, the attempts and the official acceptances of work of the providers of services and the service of maintenance. Manage risk policies for RIG
GMAO user: MAXIMO - MRO
-
SCHLUMBERGER
- Elec/Instrum Supervisor
Paris
2006 - 2006
Customer: SCHLUMBERGER
Unit: RIG 23 – RIG 60
Place: ISLAMABAD - PAKISTAN
Date: 01/2006 to 10/2006
MISSION "EXPATRIATE" of “METHOD ELEC/INSTRUM" SUPERVISOR for SCHLUMBERGER on rig of drilling RIG 23-60. Direction of the maintenance actions in electricity and instrumentation on the "RIG" of drilling of the site onshore in Pakistan. Follow-up of the RIG, methods, control of the preventives and curatives tasks on the various elements and process of drilling on the field of exploitation (SCR Ross Hill & IDM, PCR, DRAWWORKS, MUD PUMP, ROTARY TABLE, TOP DRIVE (TDS 9 & 11S and IDS) VARCO ET NATIONAL, BCS, ELMAGGO BRAKE, CATERPILLAR 398, 393 with generators and DC motors GE 752…). Meeting of "maintenance reporting", organisation of the operations on great work, Engineering, evaluation of the quantities and costs, management of the teams and materials for the execution of the building site, tests and acceptance of work of the service providers and the service of maintenance.
GMAO user: “CAMM” system.
-
TRANSOCEAN
- Electrical supervisor
Courbevoie
2006 - 2008
Customer: TRANSOCEAN
Unit: SEMISUB: RICHARDSON / JACK BATES – JACK-UP H.H WARD
Place: LUANDA – ANGOLA / SINGAPOOR / KOTHA BARU – MALAYSIA / VIETNAM
Date: 11/2006 to 07/2008
MISSION of OFFSHORE ELECTRICAL SUPERVISOR for TRANSOCEAN on RIG (semi-sub offshore and jack-up drilling). Manage the electrical maintenance department operations and electric maintenances on the RIG. Follow-up of the construction sites of the RIG, the methods, controls preventive and curative tasks on the various equipments (SCR General Electric, ECR, DRAWWORKS, MUD PUMP, ROTARY BANKS, TOP DRIVE TDS-4 VARCO with VFD, BCS, ELMAGCO BRAKE, Engines WARTSILA 12V32 and 6R32 with Stromberg generators, DC GE 752, ANCHOR WINCHES, cabins POWER HV, MV, LV, accommodations A/C, PLC GE FANUC 90-30, …) and process of the drilling on the exploitation field. Editorial staff of "maintenance reporting ", organization of the operations on the new works of installations of the new equipments, engineering, evaluation of the quantities and the costs, crews management, budgets " cost control " and materials for the execution of construction sites, the tests, the attempts and the official acceptances of work of the providers of services and the service of maintenance.
MISSION of ELECTRICAL SUPERVISOR on Jake Bates semi-sub rig. Mission to supervise the maintenance on electrical and instrumentation system. MISSION of ELECTRICAL SUPERINTENDENT on H.H Wakes jack-up rig for the revamping and maintenance on electrical system.
GMAO user: “EMPAC” & “GRS RIG V4.2” system.
-
PERENCO
- Elec/Instrum Supervisor
Paris
2005 - 2006
Customer: PERENCO
Unit: FPSO - Conkouati
Place: POINTE-NOIRE - Congo
Date: 09/2005 to 01/2006
MISSION "EXPATRIATE" of SUPERVISOR ELEC/INSTRUM on the FPSO Conkouati for PERENCO in Congo. Person in charge for the maintenance department (20 technicians) on FPSO and platforms of production. Direction of the maintenance actions, commissioning on the new power generation, the transformation and distribution (HV, MV, LV) on offshore oil rig site by PSTG BRUSH and back-up power generating units (CUMMINS and CATERPILLAR). Follow-up of the building sites of "revamping" of the site, methods, control of the preventive and curative tasks on the various elements of the process and the production. Organization of the operations on great work on new equipment, Ingeneering, evaluation of the quantities and costs, management of the teams, budgets and materials for the building sites, tests, and acceptances of work of the service providers and the maintenance department. Supervisor for the work over rig SCR and cubicle (HILL GRAHAM) and production platform pump with VSD REDA and CENTRILIFT. Commissioning and start-up for the new CATERPILLAR power plant 6.6 MWatts.
GMAO user: UNISUP - “SAP” system
-
ADC
- Method Elec/Instrum
SAINT CYR SUR LOIRE
2004 - 2005
Customer: ADC (Arabian Drilling Company)
Unit: RIG AD 21, AD4, AD3, AD35, AD34 drilling unit
Place: Al-khobar – Saudi Arabia
Date: 02/2004 to 08/2005
MISSION "EXPATRIATE" of “METHOD ELEC/INSTRUM" SUPERVISOR for ADC (Arabian Drilling Company). Direction of the maintenance actions in electricity and instrumentation on the "RIG" of drilling of the site onshore of Al-khobar in Saudi Arabia. Follow-up of the building sites of "revamping" and commissioning of the RIG 35, 21, 03, 12, and 23, methods, control of the preventives and curatives tasks on the various elements and process of drilling on the field of exploitation (SCR Ross Hill, PCR, DRAWWORKS, MUD PUMP, ROTARY TABLE, TOP DRIVE (TDS) VARCO ET NATIONAL, BCS, ELMAGGO BRAKE, CATERPILLAR 398 with generator and DC motor GE 752…). Drafting of "maintenance reporting", organization of the operations on great work, Engeneering, evaluation of the quantities and costs, management of the teams and materials for the execution of the building site, tests and acceptance of work of the service providers and the service of maintenance. Commissioning and start-up for ID3 system
GMAO user: “CAMM” system, ID3 (Intelligent Data Drilling Display)
-
CRYOSTAR
- ENGINEER COMMISSIONING and START UP
HESINGUE
2003 - 2003
Customer: CRYOSTAR
Unit: SAMSUNG / DAEWOO LNG Naval Shipyards
Place: OKPO – South Korea
Date: 11/2003 to 12/2003
MISSION "EXPATRIATE" for ENGINEER COMMISSIONING and START UP for CRYOSTAR. Man in charge for the direction of the installations task, assemblies and calibrations of compressors HD and LD on "LNG Carriers" for the shipyards of DAEWOO and SAMSUNG, to OKPO in South Korea. Follow-up of the building sites, methods, control of the preventive and curative tasks on the various processes of the LNG Carriers and the chain of liquefaction, drafting of "maintenance reporting", organization of the operations on great work. Engineering, management of the technicians, under treating and materials for the execution of the building sites, tests, tests and acceptance of work of the people receiving benefits and the service of maintenance.
-
TOTAL
- Method Elec/Instrum
COURBEVOIE
2003 - 2003
Customer: TFEA (TotalFinaElf Angola)
Unit: DEBEERS Tower office and site
Place: LUANDA - Angola
Date: 02/2003 to 10/2003
MISSION "EXPATRIATE" of “Electrical Method and Maintenance”. Management of the maintenance of electrical power by fan and safety group and COMMISSIONING and START UP for new gas lift compressor skid . Follow-up of construction sites, realisations of the technical projects, revamping of all the Bloc 3 site, controls of the preventives and curatives tasks and new works. Make maintenance reports with the technical group inside outside the company.
GMAO user: “Optimis” system, SAP.
-
SMIT International
- ENGINEER COMMISSIONING and START UP
2002 - 2002
Customer: SMIT International Gabon
Unit: OPRAG Base
Place: PORT-GENTIL - Gabon
Date: 06/2002 to 08/2002
MISSION "EXPATRIATE" for ENGINEER COMMISSIONING and START UP at SMIT International Gabon.
Management of a team of 3 local technicians. Follow-up of construction sites, realisations of the technical projects revamping on the tugboat and supplies, controls tasks preventives and curatives and new works. Make maintenance reports with the technical group inside the company.
-
CPTL (Total)
- MAINTENANCE FOREMAN
2002 - 2002
Customer: CPTL (Company Oil Total Libya)
Unit: MABRUK Field
Place: TRIPOLI - Libya
Date: 08/2002 to 12/2002
MISSION "EXPATRIATE" of MAINTENANCE FOREMAN for account of CPTL, COMMISSIONING and START UP, management of several teams of technicians and team leaders, direction of the maintenance actions. (maintenance on the power generation "SACM-Wärtsilä" and "Cummins", export pumps, electrics supplies, air compressor "Kaiser"...), follow-up of the building sites, training of the technicians, controls preventive and curative tasks on the various wells of the field, reading of "maintenance reporting"…
GMAO user: “GMS” system from First, “MP 2” system for workshop and maintenance.
-
FORAID (SPIE)
- SUPELEC
2002 - 2002
Customer: FORAID Gabon
Unit: Base and site
Place: PORT-GENTIL - Gabon
Date: 03/2002 to 05/2002
MISSION "EXPATRIATE" of SUPELEC at FORAID (SPIE). Management of a team of 5 local technicians and ATP. Follow-up of construction sites, realisations of the technical projects revamping, controls tasks preventives and curatives on ELF Gabon’s various oil platforms. (new revamping wharf and work on unity of storage of the “Cap Lopez”, new work in Sogara for the oven "Coger"), control of the preventive and curative tasks on the various oil platforms and satellites of ELF Gabon (maintenance gas turbines, pumps, electrical powers, various new work...)
GMAO user: UNISUP & “Optimis” system
-
STOLTOFFSHORE
- MAINTENANCE Supervisor
2001 - 2001
Customer: STOLTOFFSHORE
Unit: Lay barge (LB 200) - pipeline unit product
Place: MOBILE – ALABAMA United States
Date: 01/2001 to 08/2001
MAINTENANCE Supervisor for the STOLTOFFSHORE at SERIMER DASA, specialist of the automatic pipeline welding (bi-wipes). Management of several technicians team in expatriation (United States, Barge LB 200…), contact with the customers, followed yards, restoration of the materials of weld (Saturne and Saturnax), preventives and curatives controls of contract of the politic of quality from SERIMER…
Responsible for instrumentation maintenance for:
Main equipment:
2 DC Generators for the welding
3 Welding system Saturnax bugs and boxes
4 Gas 50 / 50 Material (analyser, flow meter)
5 Welding system Saturn boxes
GMAO user: “MP 5” system