I’m benefiting of a mix office, workshop & site based project, manufacturing, construction and quality control management experience. I have worked in the construction of off shore oil &gas platform construction, car-ferry building; Chemical, petrochemical & Power plant, Water pumping & sewerage station installation. I have worked also in the manufacturing, welding &quality control of carbon steel and stainless steel pressure vessels, filters, mounted skids, process equipment, special fitting, tanks, piping and wind towers.
In the companies I worked for, I have been always involved in the continuous improvement and development projects concerning either technical or organizational targets.
In this stage of my career, and with my personality traits and soft skills especially in term of communication and leadership, I’m actually looking for challenging mission at the top management of organizations to define & implement strategies, plan business development, and institute good governance practices and ethics.
Areas of expertise

1. Project Management:
2. Operations management (Fabrication of Steel structure, wind towers, tanks, vessels & piping…)
3. Survey of construction work
4. Quality control management
5. Internal Audit ISO 9001
6. QA/QC and welding engineering
7. Nondestructive testing (Ultrasonic testing, Magnetic testing)
8. Manufacturing, inspection and internal assembly of wind towers
9. Manufacture and inspection of pressure vessels according to ASMEVIII, EN13445…
10. Manufacturing, erection and inspection of storage tank according to API650
11. Manufacture and inspection of steel structures according to EUROCODE

Entreprises

  • Bureau Veritas - Office Manager Al Khobar - Saudi Arabia

    Puteaux 2015 - maintenant
  • MARS Industral Contracting - DIRECTEUR GENERAL

    2015 - 2015 - Director, member of MARS Contracting Board
    - In charge of developing MARS Industrial Contracting a subsidiary of PTG group specialist in the manufacturing and the construction of industrial equipment and plants.
  • SCOMENIN - Directeur de production

    2004 - 2015 Responsibilities:

    - In charge of managing many manufacturing workshops (with more than 30000 m² covered area, 20000 Tons production capacity, 600 workers, 120 Tons crane lifting capacity..)
    - budgeting, scheduling work, leading and coaching various production departments (cutting, fitting, welding & surface treatment) and coordinating with the other intervenient such as maintenance, QC and engineering departments to ensure that all aspects of the production are completed within budget, on time and according to the design, standards and customers’ requirements.
    -Developing Manufacturing facilities, tools and processing method statements and piloting the continuous improvement and the optimization of production line within the respect of QHSE conditions and rules.

    Key Successful accomplishment:

    1. ASME STAMPED, Process equipment for ASDRUBAL- SFAX ( BG/PETROFAC and SNC-Lavalin2007-2008)
    2. Oil storage Tanks for TANKMED – SKHIRA ( TANKMED- 2008)
    3. Wind Towers for GAMESA,LEITWIND, MADE (2007- 2008)
    4. 40 nacelles for Wind towers ( LEITWIND 2009/2010)
    5. Filter and surge vessels (GEIDA/ABB/PEERLESS/TIFERT 2009/2010…)
    6. Special fitting for pump stations ( ALNAHR, TEKFEN 2008-2010)
    7. Process equipment for chemical plant (GCT – 2011-2012)
    8. Process equipment and offshore subsea and topside for platform (AQUATERA- 2013-2014)
    9. Flagpole tower 170 m for Jedda/ SAOUDI ARABIA (Elbabtine – 2013/2014)
    10. Process equipment for chemical plants (Furnace Fabrica / ICF – Tunisia – 2013/2014)
    11. Air treatment unit for Power stations (Boldrocchi – ANSALDO Sousse D – 2013/2014)
    12. Facilities structure for Sousse D Power station ( ANSALDO – 2013/2014)
    13. Air treatment unit for Power stations (AAF- GE – 2014/2015)
    14. 10 rubber lined filters for desalination station (OVIVO-2014/2015)
    15. 3 separators, 1 air pressed vessel, piping and 3 complete Mounted skids (TPS- 2014)
    16. Prefabricated production tanks (EXPRO-2014/2015)
    17. Offshore plate form (TOPIC- 2014/2015)
  • SCIN - Site coordinator/QC MANAGER

    Sfax 1993 - 2004 Responsibilities:

    - In charge of managing project in execution including budget and time scheduling, coordinating with customers, end users, suppliers and subcontractors, conducting & supervising steel construction works, controlling progress and cost.
    - Managing Quality control activities from the establishment of QA/QC project documents (quality plan, Inspection test plan, QC procedure inspection..) to the implementation of Quality Control programs including the coordination, performance and execution of manufacturing and construction inspection & testing to ensure meeting standard and contractual project requirements.
    - Constituting the manufacturing record book including all material and welding traceability and inspection reports giving the proof of the compliance of all executed works to the pertinent project specifications, codes and standards.
    - Preparing projects welding engineering documents (WPS, PQR, WPQ..) and assuring monitoring of welding activities to be in compliance with the prepared documents.

    Key Successful accomplishment:

    1. Construction of 5 car-ferries for Jerba and the goulette, equipment ministry 1999-2000
    2. Inlet duct and exhaust for power station Rades B ( General electric/CPC: 2000)
    3. Construction of car-ferry “KERKENNAH” ( Elloud Sfax-Kerkennah): SONOTRAC 2002
    4. Construction of 6 oil tanks: Tankmed 2002
    5. Repair of 4 oil Diameter 52 m tanks bottom: TRAPSA, 2003/2004
    6. Manufacturing 17 Facilities oil processes for ENNAGA-LIBYA, (CONSAD 2001/2002)
    7. Manufacture of miscellaneous steel structure and equipment for cement factory ENNFIDHA and Djebel- Ouest (Polysius 2002-2003).
    8. Repair bottom and heat coil of fuel tank of Power station Sousse A (STEG, 2003)
    9. Chimney 30m- Power station Thyna and Feriana, (GENERAL ELECTRIC- 2003).
    10. Manufacturing 15 piping skids and vessels for lehib gas lift station, Libya, (INTERBETON 2003).
    Responsibilities:

    - In charge of managing construction works on site, including review of contractual specifications, drawings, procedures and QHSE documents, scheduling, preparing all erection &handling equipment & tools, selecting and mobilization of workers, providing logistic assistance and assuring materiel arrival timing, conducting erection works, preparing and supervising handling and lifting operations, ensuring respect of HSE rules, controlling progress and coordinating on site with customers, end users, and subcontractors.

    Key Successful accomplishment:
    1. Construction of offshore platform ASPF3: SEREPT/ELF 1994-1995
    2. Construction of Oleum unity: Chemical Industry: ICF Gabes: 1995
    3. Repair phosphoric and sulfuric acid storage Tanks:GCT 1996
    4. Construction of phosphoric acid storage tank: 1996
    5. Repair oil tanks (STIR 1996).
    6. Sewerage treatment station Menzel Bourguiba: ONAS 1997
    7. Gas turbine Power Station Bir Mcherga: GENERAL ELECTRIC/STEG 1997
    8. Pump station OUED BARBARA, Agriculture ministry 1997-1998
    9. Gas turbine Power Station Bouchemma: GENERAL ELECTRIC/STEG 1998
    10. Oil tank ( Capacity:5500m3), Shell- Tunis,1999
    11. Repair of 4 oil tanks bottom: TRAPSA, 1999-2000