Pipeline
Mécanique
Project Planning
Power plant
Project management

Entreprises

  • Jacobs engineering SA - Mechanical field Engineer

    2014 - maintenant Jorf Phosphate Hub:
    -93 Km of pipe rack
    -1200 T of steel structure.
  • Buzzichelli Maroc - Ingénieur Projet

    Mohammedia 2009 - 2014 -->January 2013 to present day:
    SO.NA.RA refinery (Cameroon), Client Foster Wheeler France
    First phase of the Limbé Refinery upgrade: New power generation 1*15MW ( EPC project )
    February 2012 to December 2012:
    -->GUELBII site at Zouerate (Mauritania), Client MAN Turbo Diesel:
    Extension of the existing power plant GUELB by adding 2 * 10MW diesel engines to upgrade the capacity of the plant to 60MW (Civil Works, steel structure, Equipment installation. metal cladding, Paint and insulation).
    Jun 2010 to December 2011:
    -->OCP’s site at Safi (Morocco), Client LITWIN:
    -Construction of the new thermoelectric plant in the OCP 2*16MW. (Piping, steel structure and installation of equipment)
    - Extension of sulfuric MP1 lines (jacketed piping).
    -->January 2009 to April 2010:
    Tangier-Med’s site, client BENTINI S.A :
    Construction of seven fuel Tanks with a total capacity of 200,000 m³.

Formations

  • ENSEM 'Ecole Nationale Supérieure D' Electricité Et De Mécanique '' (Casablanca)

    Casablanca 2004 - 2008 concéption et fabriquation mécanique