Mes compétences :
Lean manufacturing
Operations Management
Marketing strategy
Risk Assessment
Financial accounting
Risk Analysis
Six Sigma
Electrical Engineering
Entreprises
SCR
- .RISK ENGINEER PRACTICE LEADER
2011 - maintenant• Conducting site surveys
• Identifying exposures and potential problems with respect to international standards (NFPA & APSAD)
• Formulating recommendations to manage and improving the identified exposure
• Representing SCR and building good relationship with clients and brokers
• Identifying ways of improving SCR systems and processes
• Ensuring training for new risk engineers.
Pyramid Engineering
- Technical Engineer
2009 - 2011Phases PD, DPD(Detailed Preliminary Design),CEI.
• Defining the estimated cost of the project for the Project Owner. Phase PD (Preliminary design).
• Expanding the estimated cost including the project owner demands, preferences, standards with respect to the amount allocated to the project.
• Establishing CEI (Call of Expressing Interest) respecting preferences and demands of the Project Owner.
• Managing the team of technicians working on the project.
• Setting Deadlines, for each phase of the project, with the Project Owner.
• Conducting Price Negotiation Office survey of suppliers.
• Ensuring compliance with the standards both in studies phase and the execution phase.
• Participating in the analysis of the technical bids.
Zurich Financial Services
- Risk Engineer
Zürich2008 - 2009• Conducting site surveys
• Identifying exposures and potential problems
• Formulating recommendations to manage and improve the identified exposure.
• Representing Zurich and building good relationships with clients and brokers
• Identifying ways of improving Zurich’s image and costumer satisfactory.
LUMAFRIC
- Ingénieur chargé d'affaires
Casablanca2006 - 2008• Housing Estates (Public Lighting Networks MV-and LT) and rural electrification
• Preparation of technical and commercial offers to customers;
• Negotiating prices with suppliers
• Planning work achievements.
• Procurement of construction needs in human resources and equipment.
• Electrical studies, design of transformer stations, network dimensioning, choice of equipment, protection, monitoring and control;
• Implementation of projects at the lowest cost and the optimal times.