Menu

Zine Elabidine GUENDOUZ

PUITS HASSI BERKUNE

En résumé

Projet : Raccordement des nouveaux puits hassi berkune (GTP/groupement berkune).
Missions : Responsable du corps d’états Instrumentation/Electricité.

Projet : RKF UPGRADE (GTP/sonatrach-cepsa).
Mission : Responsable du corps d’états Instrumentation.

Plan &suivi
Matériel client
Atelier prefab.
Calibration et étalonnage

Entreprises

  • JGCAlgeria (Japan Gas Corporation)/Groupement Berkine (Sonatrach ,Anadarko ) - Engineer Instrumentation Method

    2012 - maintenant Project: GB Maintenance division (GJC/Groupment Berkune).
    My role:
     Standardizing materials, spares, equipment and tools required for maintenance work.
     Initiating procurement of supplies and ensuring availability of economical stock level. (Material Purchase requisition tracking). Liaison with department achat.
     Directing and participating in the compilation of competent plant and equipment maintenance data
     Review and analysis Data to establish reliability, to ensure availability of equipment.
     Prepares scope of work for service contracts or service order.
     Initiating request to establish Service contract or order.
     Prepare CDM strategy and single source justification ( SSJ) if required.
     Prepare NOP for eventual amendment or regularisation SC or SO
     Analyze and evaluate vendor’s qualifications and submitted bids in respect of company's work and recommend acceptance or rejection of the same
     Ensures that the Company and statutory safety requirements are adhered to in all maintenance activities undertaken by Company personnel and external Contractors
     Check and validation of the time sheet with in T&C of the SC or SO.
     Compiling and send vendor reports as required at the job accomplishment to document list
     Compiling and submitting reports as required and at the relevant frequency to manager.
     Raises & reviews plant modifications (FCP) and liaises with and engineering personnel to ensure acceptance and timely implementation of related projects.
     Contributing to the development and updating of a formal maintenance system for production facilities.
     Participate in General overhaul maintenance, elaboration schedules and a resource for maintenance in field. Long term( 5 Years ) plan and short term maintenance plan (1 year)

     Prepare and review maintenance Procedures of all systems and equipment, and practices in the plant.
     Cataloguing spare parts ensuring availability of economical stock level.
     Develop list of materials and spare parts and associate spare part list to parent equipment.
     Ensure equipment repair and refurbishment for safety critical items meets acceptable standards.
     Ensure availability of equipment and tools required for effective maintenance work.
     Prepare material and spare part for the maintenance work order.
     Material identification, technique reception and provide feed back to material coordinators.
     Perform technical evaluation of the material and spare part. Liaison with A&C coordinators.
     Work pack preparation for all planned inspection and major maintenance operations.( statutory equipments and rotating machines)
     Close completed work order, with in requested information.
     Data collection for musis update.
     Compiling and submitting reports as required and at the relevant frequency to manager CDS


    Other knowledge's
     Perfect Control of Word, Pascal, matlab, symbole2000, 20sim, Excel, Windows and tool Internet.
     Mastering of a wide range of computer software packages, platforms, programming languages and software's.
     Driving licence and JGC/KBR driving licence.
  • Engtp - Ingénieur Instrumentation

    2007 - 2012 Poste : Ingénieur Instrumentation
    Projet : Raccordement des nouveaux puits hassi berkune (GTP/groupement berkune).
    Missions : Responsable du corps d’états Instrumentation/Electricité.

    Projet : RKF UPGRADE (GTP/sonatrach-cepsa).
    Mission : Responsable du corps d’états Instrumentation.

    Plan &suivi
    Matériel client
    Atelier prefab.
    Calibration et étalonnage.
  • Sonatrach/bp/statoil - Superviseur MTN calorifuge

    2007 - 2007 superviseur MTN calorifuge AIN AMENAS Gaz Project(tikantourine) EMIPS sonatrach/bp/statoil.
  • JGC/KBR - Superviseur isolation industriel

    2006 - 2007 superviseur isolation industriel IN AMENAS Gaz Project (tikantourine) JGC/KBR. Using PERMIT: Hot and cold work permit, insulation permit, and excavation permit, permit to work, confined space.
     Being through all training required:
    TSTI, fall protection, Confined space, PTW, Ringing, LOCK OUT /TAG OUT, Fire watcher, Scaffolding.

Formations

Pas de formation renseignée

Réseau

Annuaire des membres :