Mes compétences :
SCADA
Logic implementation
curative maintenance
Programmable Logic Controller
Offshore Oil & Gas
Digital Cross-Connect
Entreprises
ENI
- ICCS Engineer
Lyon2013 - maintenantICSS Engineer Integration Objects maintenance contractor for ENI
Contractor ICSS engineer for Groupement ENI-SHFCP in MLE Project Algeria:
Commissioning, Start-up:
- Plan and Conduct the pre-commissioning, commissioning and start-up activities
of the control system.
- Perform Loop and functional tests.
- Logic checks and validation. ;
- Plan and execute the start-up activities of the MLE gas field Integrated Control
and Safety System.
Maintenance:
- Preventive and curative maintenance of the different control system
components which includes:
- DCS Yokogawa Centum VP
- ESD/F&G Prosafe RS ;
- HOTOIL, Regeneration, Air supply, dryers, Water Treatment and HVAC
Systems (Siemens PLCs: S7-400/S7-300/S7-200)
- Turbo Expander, Off gas, Nitrogen Systems (Allen bradley PLC:Control logix
5561/CompactLogix )
- Wells, Manifolds and BVSs (Foxboro RTU: SCD2200) ;
- SCADA system Invensys A2
- Turbo Compressor (HIMA F35)
- DCS Emerson DeltaV for metering system.
- Triconex PLC for HIPPS system. ;
- Assistance to operation team during process failures, abnormal situations and
start-up/shut down operations,
- Carrying out investigations in case of system faults or process anomalies,
- Management of the control systems spare parts and programs back-ups
- Periodical reporting of the control system status and maintenance activities
(daily, weekly, monthly, yearly),
- Provision of incident reports to managerial staff after unexpected shutdowns
New Wells Integration (17 CAFC Wells):
- Plan and Conduct the pre-commissioning, commissioning and start-up activities
of the control system.
- Cause & Effect conception.
- Perform Loop and functional tests.
- Logic checks and validation. ;
- Logic implementation in the DCS YOKOGAWA CentumVP, RTU Foxboro and
SCADA Invensys (Intouch, OPC link ...)
- Logic implementation in Prosafe-RS system for the F&G and ESD.
- Configure communication between the SCADA and the new wells RTUs (DNP3
protocol).
- OPC Communication configuration between the SCADA Invensys and the DCS
Yokogawa.
New Wells Integration:
- Integrate 2 new wells, logic implementation, and Modbus configuration between
Control PLC (Allen Bradley), F&G, ESD (HIMA F35) PLCs and DeltaV DCS
system.
- Prepare as built drawing for the 2 new wells (loops drawing, electrical drawings,
instruments drawings, P&ID ...).
- Coordinate work with clients and related client-departments.
- Conduct Factory Acceptance Test (FAT)
- Conduct Site Acceptance Test (SAT)
Formations
National Institute Of Applied Sciences And Technologies (Tunis)
Tunis2007 - 2012Automation Engineer
Degree in Industrial Computer and Automation. Passed with honors.