• Experienced Professional with more than 40 years of experience participating or supervising construction projects including conception and implementation sites procedures.
• Promote the live interaction with Production, Engineering and Cost Control departments that involve Civil, Architectural and Electromechanical works.
• Excellent skills as a forward planner, ability to present ideas and solution finder , good communication and negotiation skills , able to manage changes and related factors.
• Strongly oriented to the timely achievement of set objective. Problem solver.



Mes compétences :
Negotiation skills
Mechanical and electrical Installation
Language skills
Able to manage changes and related factors.
Problem Solver
Site Coordinator
Civil and architectural works

Entreprises

  • Danieli - Construction Manager

    Buttrio 2015 - 2016 AQS Project - New Steel Plant located in Bellara – Algeria
    Value of the project estimated: 700 Million US$
    Responsibility and performance description: Civil and MEP works – Construction sites and procedures, managing technical and operational working environments concern:
     Set up Base Camp (able to receive 1.800 guests), SW and PW system - WTP,
     Set up 10 electrical substation MV/LV and 3 Batching Plant,
     Soil improvement, drainage system and utilities in laydown areas concern around 250.000 m2 able to receive facilities, workshops and off shore materials to be storage,
     Soil improvement Steel Plant involved around 1.500 bored piles and more than 10.000 CFA piles, footing, technological foundation and steel structure erection

  • Astaldi - Site Coordinator

    2014 - 2015 Site Coordinator: Hydro Electric Power 96 MW – UP Contract (S. Teresa-Cusco, Peru)
    Value of the project estimated: 85 Million US$
    Responsibility and performance description: Preliminary activities concern LNTC phase – Logistic and Construction sites managing technical and operational working environments

  • Astaldi - Deputy Proposal Manager

    2013 - 2014 Metro Lima – UTO System – EPCM Contract (Lima, Peru)
    Value of the Electromechanical Project estimated: 850 Million USD
  • Astaldi - Site Coordinator

    2011 - 2013 Project Coordinator: Hydro Electric Power - EPC Contract (Peru)
    Value of the project: 680 Million USD
    Responsibility for Geologic/Geophysics activities - Set up of Camps on site - Coordination of Civil and Electromechanical works - HV line - Conception and implementation of Construction sites procedures
  • Maire Tecnimont - Site Coordinator

    2006 - 2011 * Deputy Construction Manager: Power Plant - EPC Contract (Puerto Coronel, Chile)
    Value of the project: 530 Million USD
    * Deputy Construction Manager: 350.000 tpy LDPE, Polyetilene Plant (Stenungsund,
    Sweden)
    Value of the project: 350 Million EUR
    * Buildings Project Manager: LNG Plant, realisation of 22 buildings fully integrated, Turnkey
    contract (Fos Cavaou France)
    Value of the building project: 80 Million EUR
    Responsibility and performance description: Civil and Architectural Works - Construction sites and
    procedures, managing technical and operational working environments (Chile/Sweden)
  • Transfima (Maire Tecnimont Group) - Site Coordinator

    2004 - 2006 EPC Contract, 9.5 km metro driverless system including the architectural finishes
    and external areas concern n.5 subway stations
    Value of the project: 150 Million EUR
    Responsibility and performance description: construction sites and procedures, managing technical
    and operational working environments: electrical system, platform screen doors, backbone network
    TLS, track, control maintenance centre.
  • Torno International SpA - Procurement Manager - EPC Turnkey

    2002 - 2004 Value of the project: 185 Million US$
    Responsibility and performance description: Responsible for coordinating the overall activities
    according to the contractual requirements, cost, time and quality of the supplies. Post - PO activity
    management reporting to Project Director.
  • CEGELEC - Deputy Proposal Manager - Costanera Norte -Santiago - Chile

    Saint-Denis 2002 - 2002 Value of the project: 160 M $
  • GEMMO IMPIANTI SpA - Site Manager

    1983 - 2002 * Site Manager, International Airport in Ezeiza and Aeroparque city airport in Buenos Aires
    (Argentina) - Value of the project: 65 Million US$
    * Site manager / Electrical and mechanical installation in textile factory, electrical and
    electronical highway systems, airport, industry plant and civil construction (Egypt, Italy,
    Tunisia, Turkey, France)
    Approximate value of the projects: from 5 to 40 Million US$
  • REDI Electric SpA - Electrical Superintendent

    1975 - 1983 Electrical Superintendent / Al Hada Hospital TAIF (Saudi Arabia)
    MACH-IM-TES SpA
    Electrical and Mechanical Superintendent, Cotton Factory (Lybia, Morocco)
    ELETTROROSA' Snc
    Electrical and Mechanical Supervisor, Industry Plant and facility construction (Italy)

Formations