Xela Solution (www.xelasolution.com)
- Independent Contractor
2015 - maintenant
Expert drafting and Support services for Oil and Gas companies,
2D / 3D sketches,
Installation / Standard Operation procedures story boards,
Lift / Deck plans,
Rigging arrangement and Fit up checks.
-
Technip
- Offshore Construction Supervisor
Paris
2010 - maintenant
- Supervision for safe and effective execution of the project workscope in accordance with approved operating procedures, including mobilisation, deck and subsea activities,
On pipelay vessel Deep Blue during Rigid Reel-lay, Flex-lay and Umbilical lay operations, Riser pull-in operations, Free Standing Hybrid Riser deployment, Piles and Structures installation,
On 3rd Party vessel TideWater Enabler during subsea Umbilical commissioning and Flying Leads installation,
On 3rd Party vessel Fugro Symphony during Field survey set up, pre and post lay activities, Flex-lay and Umbilical lay operations, Structures installation and Mattresses/Crossings deployment.
- Define and Focus on critical path activities and awareness of parallel works,
- Comply with Management of Change procedures,
- Responsible person for Permit to Work system,
- Maintain an accurate log of all activities conducted during the shift period through interfacing with all departments,
- Conduct and participate in safety activities such as Tool Box Talks, Job Hazard Analysis, Management of Change, Risk Assessments,
- Maintain a close operational communication with Offshore Construction Manager and all operational departments under their control,
- Assist deck supervision where required with supervision of any on deck or quayside operations,
- Lead day pre-shift briefings,
- Give feedback to provide up to date information for procedure, task plans, project Inspection and Test Plan, Standard Operations Procedures and equipment lift plans,
- Be familiar with any special procedures and limitations of equipment to be used for the work
- Attend site to assist project team.
-
Technip
- Operation Engineer
Paris
2008 - 2010
- Barge engineer on pipelay vessel Deep Blue during Reel-lay, Flex-lay and Umbilical lay operations,
Point of contact for vessel/Project interfaces,
Preparation of operation engineer debriefing reports and lessons learnt,
Pipelay equipment settings synthesis,
Development of Standard Operations Procedures, vessel equipment lift plans and Risk Assessment,
Review of Project procedures, operations task plans and pipelay installation analysis tables,
Lead night pre-shift briefings.
- Operational interfaces for Block 31 and Pazflor project,
- Planning and operation review for tenders,
- Mobilisation, operation and demobilisation support for pipelay vessel Deep Blue,
- Development of standard J-lay equipment mobilisation procedure including planning, check lists, commissioning work, set up, and lift plans on pipelay vessel Deep Blue,
- Operation feasibility study on deployment of riser at 3000m water depth.
-
Technip
- Project Engineer
Paris
2008 - 2008
- Installation procedure for 30" gas pipeline contingency repair work on Kvitebjørn project,
- Riser study, configuration, quick disconnection hang off system and installation for arctic spar concept on Shtokman project.
-
Technip
- Operation Engineer
Paris
2006 - 2008
- Barge engineer on pipelay vessel Deep Blue during J-lay and Reel-lay operations,
- Installation procedure for the deployment of 250Te buoyancy can part of Free Standing Hybrid Riser (FSHR) on PDET project,
- Development of standard pipeline cold cutting system for Reel-lay vessel.\
-
Technip
- Geotechnical Engineer
Paris
2006 - 2006
- Analysis of stress in rigid pipeline during trenching operation and development of associated database,
- Trenching risk analysis on Alvheim and Njord project,
- Suction pile, riser hold back clump weight design depending of geotechnical conditions on Alvheim project,
- Riser hold back clump weight design depending of geotechnical conditions on WaGE project.
-
ECAM Lyon
- Engineer in partnership with ECAM
2005 - 2006
- Vibratory study of an anti-rustles system for buses,
- Analysis of the air flow disturbances due to the anti-rustles system.
-
Airbus
- Engineer
Blagnac
2004 - 2004
- Gathering information on the different wings de-icing systems,
- Indexing the criteria of comparison,
- Evaluating their potential for use on A30X and making recommendations for future study
-
Multi Transoports
- Driver
2003 - 2003
- Learning mechanic and electric knowledge regarding trucks.
-
SAGA
- Driver
POMPEY
2002 - 2003
- Filling and maintaining bottles of medical oxygen,
- Testing the different bottles,
- Delivering to the patient.
-
PSA Peugeot Citroën
- Mechanic
Rueil Malmaison
2002 - 2002
- Fixing cars in the mechanical and maitenance departments.
-
Multi Transports
- Workforce
1998 - 1998
- Discovering a company and discharging trucks.