Paris2012 - maintenant• Prepare Project breakdown structures (WBS, PBS, CBS, OBS, etc.), Project Planning Procedure, Physical Progress Measurement Methodology, Project Calendar & Project Co-ordination Procedure.
• Develop the 90days & levels 1,2,3 “Baseline” schedules by co-coordinating with all departments
• Update and monitoring project schedule (broken line, critical path, Actual & Forecast dates, re-baseline etc.)
• Physical progress measurement system implementation and follow up.
• Earned value management: implementation, control and monitoring.
• Daily monitoring and reporting of weekly/monthly progress report with variances as per baseline schedule, progress s-curve and manpower histogram and productivity.
• Control, monitoring and monthly reporting of forecast expenditures against approved budgets.
• Conception of project performance indicators and follow-up for Management.
Physical Progress Measurement tool Administrator at Technip group:
• Intermediary between planning department and IT.
• Users support at group level and animation of admin mailbox.
• Training sessions for users and preparation of training material.
• Prepare functional specifications for new enhancements.
• Prepare and play test scenarios for new enhancements.
• Detection and monitoring of technical and functional Bugs.
Projects
EPSCC - Yamal LNG (Russia) - YAMGAZ
FEED – Coral South Development Project FLNG (Mozambique) - ENI
See4sys Technologie
- Project Quality Engineer- Graduation Internship
Carquefou2012 - 2012Mission: Process improvement based on CMMI best practices.
• Redefine and improve Capitalization and Estimation processes.
• Build a basis for estimation based on valid data projects.
• Provide estimation models for Project Management and Quality department.
• Develop in excel a tool for Capitalization and Estimation and provide the user guide.
• Improve and setup project best practices for Project Management and Quality department.
Skills : CMMI-DEV 1.3, ISO 9001 v 2008, Statistics, Probability.
Tools: PSNext, Excel, VB.
Banque de France
- Ingénieur Pilotage de Projet
Paris2011 - 2012Mission : Mise en place d'une planification avec l'EVM
• Étudier la théorie de l'EVM (Earned Value Management).
• Déterminer les indicateurs projets pertinents et exploitables par l'EVM.
• Étudier la mise en œuvre de l'EVM dans l'outil MSProjet.
• Construire des scénarios de planification.
• Mettre en disposition des chefs de projet des bonnes pratiques de planification.
Marcamax
- Ingénieur Développeur JAVA/JEE
2011 - 2011Mission : Modélisation et développement d’une application de géolocalisation, en utilisant les technologies : JAVA/JEE (Stage de 2 mois).
Amendis
- Ingénieur Développeur PHP/MySQL
Tanger2010 - 2010Mission : Modélisation et Développement d’une application de Gestion des incidents de l’entreprise en utilisant les technologies : PHP/MySQL.
Amendis
- Stagiaire
Tanger2009 - 2009Mission : Stage au sien du service Facturation de la société Amendis sous le thème «Facturation liée aux activités d’Amendis»
JOHANA EMPRESARIAL
- Stagiaire
2008 - 2008Mission : Stage en génie électrique et génie Mécanique.(Stage d'un mois).