Follow up of operationnal GPD phases : Prebuild (New Tractor Cab)
Change Review Board Meeting & Engineering Change follow up.
Design Reviews with Engineering to facilitate Manufacturing.
Implementation of new manuel welding fixtures & jigs.
RFQ for new welding robotic cells for tractor body sides. Project follow up from design to Start of production.
Kaizen Coordinator (Standard Kaizens).
Responsible for Early Equipment Managment & Early Product Managment Pillars in World Class Manufacturing program.
2015 :
Follow up of operationnal GPD phases : Prebuild (New Combine Cab)
Follow up of GPD phases for Tractor cab upgrade.
Change Review Board Meeting & Engineering Change follow up.
Design Reviews with Engineering to facilitate Manufacturing.
Implementation of a Dragchain (Tom conveyor) on a Combine Cab Assembly Line.
Implementation of an ANDON system on a Combine Cab Assembly Line.
Kaizen Coordinator (Standard Kaizens).
Responsible for Early Equipment Managment & Early Product Managment Pillars in World Class Manufacturing program.
2014 :
Follow up of operationnal GPD phases : Prebuild, 4P, Job 1 (New Combine Cab)
Tracking parts availability, Issue log list, Standard Operation Procedure.
Change Review Board Meeting & Engineering Change follow up.
Relayout of the Combine Cab Assembly in another building to increase the capacity & the efficiency (material flow) 14 workstations.
Implementation of a separate line for Roofs sub assemblies.
2013 :
Follow up of operationnal GPD phases : Prebuild, 4P & Job 1
Trancking parts availability, Issue log list, Standard Operation Procedure.
Industrialization of the New Assembly line of 9 workstations for Combine Cabs (Manipulators, Glueing pumps, Hoist, EOL test, Power supply).
2012 :
Definition of the Assembly Sequence with Central Mfg Eng for Combine Cabs.
Layout of a New Assembly Line for Combine Cabs.
Definition of New Equipment for the New Line (Manipulators for Roofs, Seats, Windshield, Doors, Glueing Pumps, Hoist, Electrical End of Line Tester).
Definition of Assembly Tooling & Torque Equipment for Combine Cabs.
Design of Sling for paint conveyor for Combine Cabs.
Design of Transport pallet for Combine Cabs.
Follow up of operationnal GPD phases : Pilot Build
2011 :
Layout of a New Welding Line for Combine Cabs.
Definition of New Welding Fixtures (Automatic & Manual Fixtures)
Industrialization of a New Welding Line (Hoist, Slings, Lifting table, Power supply..)