Menu

Bastien BRUN

Rueil-Malmaison Cedex

En résumé

I am an engineer experienced in various stages of major infrastructure projects: prequalification, pricing, planning and methods of work definition during the tender stage and management on site during the construction execution. The sound knowledge I gathered allows me to envisage new challenges that I am looking for abroad.

My key expertise includes:
• Strong communication skills
• Ability to work within multi-disciplinary and multi-cultural teams
• Rigorous
• Proactive
• Dynamic
• Able to work on own initiative

Entreprises

  • Vinci - Civil Works Manager

    Rueil-Malmaison Cedex 2014 - maintenant Responsible for the civil works of a Design and Build project of a Waste Water Treatment Plant in Phnom Penh International Airport - 4M$.
    -Development of the design for both civil and architectural works
    -Horizontal Directional Drilling below the Runway/Taxiway of the airport - 2 x 400m
    -Pipeworks Inside the Airport for collection of the waste water - 5Km of HDPE (63 to 200mm), PVC (160 to 300mm) and corrugated pipes (63 to 160mm) and associated precast manholes
    -Site management of these works
  • Vinci - Methods engineer

    Rueil-Malmaison Cedex 2011 - 2014 Currently working in the Technical Department which is assisting in all phases and aspects of projects tenders (pricing, planning, engineering, design) and also serves as technical support for all VINCI projects around the world.

    Project Engineer working on various tasks such as:
    -Pre-qualifications (cable stayed bridges);
    -Planning (RCC and rockfill dams, cable stayed bridges);
    -Pre-tender pricing estimates;
    -Construction methods for projects such as cable stayed bridges and precast segmental viaducts in coordination with the designers for the pricing;
    -Definition of concept design for project in execution phase (pre-tying of reinforcement cages);
    -Missions for end of site reports.
  • Vinci - Site engineer

    Rueil-Malmaison Cedex 2009 - 2011 Installation of 3xPhi1600mm Ductile Iron pipes (45Km in total) from the Pumping Station to a Treatment Plant. The pipes were laid in a trench of important size (7m depth – 9m width), connected to valve chambers at regular intervals and then backfilled.

    Site Engineer responsible of the:

    -Supervision and follow up of sub-contracted activities: trench excavation (750 000m3), crushing of stones for backfill, civil works of valve chambers (6 000m3 of concrete), road reinstatement (asphalt);

    -Management of own teams for backfilling of the trench and finishing works inside the valve chambers (1 site engineer, 2 supervisors and 70 workers);

    -Interface with consultant on all matters related to site activity (Quality control, HSE).
  • Fluor - Junior Project Egineer

    Irving 2008 - 2009 Eager to develop my career abroad and improve my use of technical English, I joined Fluor, an american EPCM company, to be involved in the international joint venture Cathró, bidding for the DBFOM (Design, Build, Finance, Operate and Maintain) of the first metro line in Dublin (Ireland). As junior project engineer, I have been involved in a multidisciplinary and multicultural environment and assisted several senior project managers to manage the design consultants and partners in order to ensure the on-time delivery of quality bid deliverables (design and documentation). In detail, I mostly assisted the Design Manager for the infrastructure elements of the bid by being involved in the review of technical design submission for cut and cover tunnels, bored tunnels, below grade structures, bridges, roads and drainage. Proficient team worker, I steadily improved my responsabilities in the team to eventually become the lead author of one document included in the final submission
  • Foruminvest France - Junior Project Manager

    2008 - 2008 I assisted two senior project managers responsible for developing a shopping centre project. I led a feasibility study about the implementation of solar panels on the roof of the shopping centre. I was responsible for bringing to the management team outcomes and proposals for a solar power station sustainable both technically and financially. I also helped my managers on other duties such as interface with design and electrical consultants.

Formations

Réseau

Annuaire des membres :