Menu

Christophe DE MASCUREAU

COURBEVOIE

En résumé

Company Coordinator within TECHNIP premises (Paris) to follow a competitive Concept Definition study during 1 year (October 2012 - October 2013), KBR being the competitor. Purpose of the study was to develop an FLNG concept for the production of Bonaparte gas fields (Petrel, Tern, Fregate) and select one of the 2 competitors for the next phase of the project (FEED + option for EPCIC). My responsibilities consisted in managing all contractual matters with Technip (Progress, costs, change orders, management meetings, reporting,…) and in being Company focal point with Technip.
We are now in the tendering phase, objective being selecting one of the competitor to perform the FEED and EPCIC.

Mes compétences :
Bidding
Contrôle de projet
Engineering
Fiabilité
FLNG
FPSO
GNL
Ingénierie
LNG
Management
Management de projet
Microsoft Project
Microsoft Project Management
Production
PROJECT CONTROL
Project Management Management
tendering

Entreprises

  • GDF SUEZ - Company coordinator / GDF SUEZ BONAPARTE

    COURBEVOIE 2012 - maintenant  Bonaparte LNG project: Company Coordinator within TECHNIP premises (Paris) to follow a competitive Concept Definition study (around 8 months duration and 80,000 manhours spent), KBR being the competitor. Purpose of the study is to develop an FLNG concept for the production of Bonaparte gas fields (Petrel, Tern, Fregate) and select one of the 2 competitors for the next phase of the project (FEED + option for EPCIC). Responsibilities consist in managing all contractual matters with Technip (Progress, costs, change orders, management meetings, reporting,…) and in being Company focal point with Technip.
  • GDF SUEZ - Project coordination engineer / GDF SUEZ BONAPARTE

    COURBEVOIE 2010 - 2012  Bonaparte LNG project: involved on the Perth based GDF SUEZ project (60% GDF SUEZ, 40 % Santos) started beginning of 2010, in the engineering department as project coordination engineer (in Paris, numerous trips to Perth). Participation to the concept selection phase: mainly involved in the pre FEED of the midstream part of the project (FLNG) with DORIS ENGINEERING (as coordination engineer); Metocean studies (RPS Metocean); R.A.M. study (DNV); Shipping studies; Safety studies (Arcadis Vectra); AiP/Validation/Classification process;…(establishment of some Scope of Work, tendering phases, evaluation of bidders, follow-up of engineering activities)
  • GDF SUEZ - LNG project engineer / GDF SUEZ

    COURBEVOIE 2005 - 2009
     Asset Management department (within LNG division) (since January 2009):

    Tendering phase and development phase, as engineering coordinator, of an independent pre FEED for a Generic LNG FPSO concept, with DORIS ENGINEERING (and subcontractors, COSTAIN and PROSERNAT)
    In parallel to an equipment qualification process of our LNG FPSO concept with Bureau Veritas.

     E & P operations department (since September 2007): Gaz de France’s liquefaction assets follow-up and liquefaction plants development projects.
    Participation to due diligence (including building an economic model to compare LNG FPSO versus (Pipeline + Onshore LNG plant configuration) for the development of stranded gas fields) on LNG FPSO concept through partnership with OSAKA GAS.

     LNG Production : LNG liquefaction plant (from October 2005 to August 2007) in Egypt. A 2 years mission, as secondee, in Idku, near Alexandria, in a 2 x 3.6 mtpa liquefaction plant (Egyptian LNG), shared by Petronas, BG, EGPC, EGAS and Gaz de France. The mission was done in the Engineering department (Reliability and Technical services):

    • Follow-up of warranty periods (18 months) for both trains (Take-over, respectively, in July 2005 and October 2005). More than 400 notices of defects have been issued by the operator (Egyptian LNG) to the contractor (BECHTEL).
    • Follow-up of MOCs (Management Of Changes), modifications done in the plant, in order to solve operating issues or improve performances. Much more than 100 modifications done or ongoing in the plant at the end of the mission.
  • SAIPEM S.A. - Project control engineer / SAIPEM S.A.

    Montigny-le-Bretonneux 2002 - 2005  Project : Gas processing plant (addition of a gas treatment train to increase by 2 the outflow) in Nigeria (SHELL), in the project management team (since June 04 / a contract of, about, 160 M$) :

    • Set-up and follow-up of progress measurement tools for all project phases (engineering, procurement, construction).
    • Responsible for client reporting (weekly and monthly) and internally.
    • Variations follow-up, project control procedures.
    • Cost control (spent hours /suppliers’ invoices/client’s invoices follow-up).

     Project : LNG Terminal (including 2 tanks 9% Ni “Full containment” (160000 m3 each), an unloading jetty and a plant) in China (BP/CNOOC), in the project management team (during 9 months / a contract of, about, 250 M$) :

    • Set-up and follow-up of the project schedule.
    • Set-up and follow-up of the progress measurement and reporting to the client (all phases: engineering, procurement, construction).


     Bid phases : Responsible for the development of the level 1 and level 2 schedules covering all phases of the projects, forecasted overall S-curves, histograms and project control procedures on :

    • Oil & gas Pipelines / SHELL (awarded)
    • Compression platform / EXXONMOBIL (awarded)
    • "Floating Production Unit ” / TOTALFINAELF

  • Total - Jacket weight estimating study

    COURBEVOIE 2002 - 2002 TOTALFINAELF: A 6 months internship in the Facilities design department (Exploration-Production), studies about jackets : draw up of a worksheet on EXCEL for weight estimating of steel structure jackets.

Formations

Réseau

Annuaire des membres :