Total
- Site Engineering Coordinator
COURBEVOIE
2011 - maintenant
- Management of contractor site & technical queries, deviation requests: review and consolidation with site specialists (and HQ when required). Ensure they comply with project and Total specifications.
- Insure engineering documentation is reviewed in a timely manner (IFC and ASB)
- Anticipate and correct engineering issues whenever possible
- Attend planning and scheduling. Identify and report to the project planning engineer inconsistencies and potential problems
- Insure all activities are well prepared (safety concerns, risk mitigation measures, logistics, co-activities, etc.) and all required relevant work permits have been applied for and issued
- Follow up of site day to day activities, ease the communication process between all of the different groups (contractor, project & production team)
- Provide daily & weekly reports outlining activities of sites where upgrade activity is in progress (SIMOPS & non SIMOPS)
-
Total
- Field Planner
COURBEVOIE
2010 - 2011
- 6 weeks planning leader: prepare and conduct weekly meeting, assess co-activities and teams coordination, manage POB
- FFSD 2010 offshore coordinator : prepare and consolidate detailed planning with the different entities (project / maintenance / production, etc.), ensure all tasks are well prepared (risk assessment / co-activities / material, etc.) and relevant PTW prepared in advance, issue daily progress activity report
- SIMOPS dossiers preparation and follow up (mainly drilling activities)
- Maintenance planning and UNISUP management
-
Total
- Field Engineer (Total ABK)
COURBEVOIE
2008 - 2010
- Well performance : daily wells follow-up and optimization (more than 60 producing wells), carry out well tests (both separator & MPFM)
- RFM follow-up from preparation up to implementation and start up, punch list follow up.
- Production optimization, MAP identification
- Troubleshooting on-the-spot issues
-
Total
- Junior Process Engineer
COURBEVOIE
2007 - 2008
- Congo / Nkossa – pre-project study: Gas debottlecnecking and optimization of C5+ recovery. Verification of piping and equipments, process packages (Twister, compressors, Drizo®) check with vendors, flare system check, P&IDs and ESD logic diagrams update.
- Congo / Nkossa – Affiliate assistance: determine NKP process production capacity in downgraded mode (one production flexible instead of two, due to the May 2007 accident. Piping and flexible check with vendor and TEC/PLR.
- Congo / Yanga – conceptual study: Flaring reduction and new electricity generation. Design compressor and utility systems.
- SPOT 1 / PTR 1 process leader: Alwyn LLP