EIFFAGE
- Precom/Com Leader
Vélizy-Villacoublay
2014 - maintenant
Hook up for the Ofon Living Quarter
Precom/Com Site Leader
* Supervising the piping hook-up installation ;
* Leading all supervisors involved during hook up ;
* Organisation and follow up of work in accordance with the client HSE rules ;
* Preparation of the work permit and JSA
* Clearance of the punch list ;
* Follow-up and update the test packs with Icaps ;
* Organisation of the hydro test and Gross Air Leak Test ;
* Performing the Leak test for commissioning ;
* Validation of the RFC dossier with the client
* Daily meeting with the client
-
Total
- Company Site Representative
COURBEVOIE
2012 - 2013
Onshore fabricaton,control and expedition of all modules and material needed for the Anguille CTI3 revamping project
Company Site Representative
* Lead all supervisors involved in fabrication phases. ;
* Check conformity of isos with PID ;
* Check and comment of the PID,procedures and specifications on Prodom ;
* Follow up of Pipe and structure fabrication in Workshop
* Management of load out and sea fastening of the material to be installed offshore
* Weekly meeting with the contractor and subcontractors ;
* Weekly reporting to the project management ;
* Support and implement the Project HSE management system within the team and with the Contractor.
Contact : Irman YUDIANA ,
-
Total
- Piping Superintendent - Construction
COURBEVOIE
2011 - 2011
Piping Superintendent - Construction of the platform on the Eiffage yard in France
* Check conformity of isos with PID ;
* Check and comment of all project documents on Prodom ;
* Follow up of the installation of the carbon steel, stainless steel and GRP pipes. ;
* Follow-up of the test packs ;
* Organisation of the pressure test (Hydro and Pneumatic) in accordance with the safety rules
* Follow up of precomissioning and comissioning with ICAPS Program
* Weekly meeting with subcontractors ;
* Support and implement the Project HSE management system within the team and with the Contractor.
* Training for different discipline (HSE,JSA,Scaffold,Electricity,Bosiet,Icaps)
Contact : Irman YUDIANA ,
-
AIR LIQUIDE
- Company Site Representative & Representative
Paris
2010 - 2010
Representative of ALE for the construction of an Air Separation Unit and liquefaction unit of nitrogen.
* Management of the installation of equipments (cold box, compressors, skids, absorbers, scrubber)
* Management of the assembly of the stainless pipings and the carbon of interconnections.
* Leading all supervisors involved in project ;
* Check conformity of the Isos and PID. ;
* Organistion of the construction in accordance with the HSE rules ;
* Control and follow-up of the test packs
* Realisation of the on-site pneumatic tests ;
* Organisation of the precommissioning and commissioning steps ;
* Weekly Meeting with the client and the subcontractor ;
* Weekly reports to the ALE main office
Contact: Cyril BABINET ,
-
GENERAL ELECTRIC
- Piping Superviseur
Paris
2009 - 2009
* Supervision of the erection of the Off base piping for a gas turbine. ;
* Check conformity of the Isos and PID. ;
* Sending solutions for the nonconformities to the engineering consulting firm. ;
* Punch check lines then raised of punch. ;
* Preparation of As Built before transmission. ;
* Organisation and check of the pressure test.
* Supervision of the precommissioning
* Daily meeting for progress and planning.
-
GENERAL ELECTRIC
- Piping Superintendent
Paris
2009 - 2010
* Supervision of the prefabrication of the pipings off-bases in workshop. ;
* Leading the supervisors of different disciplines ;
* Check conformity of the Isos and PID. ;
* Opening of boxes and inventories of the material (equipment) with packing list.
* Supervision of the erection of the On base and Off base piping for a gas turbine.
* Visual control of the welds and organization of the shootings.
* Organisation and follow up of the pneumatic tests. ;
* Check of the blowing and flushing of the pipe system. ;
* Supervision of the precomissioning and commissioning ;
* Daily meeting for progress and planning with client and subcontractors
Contact: Frank HENNEQUIN
-
AIR LIQUIDE
- Company Site Representative
Paris
2007 - 2007
* Assembly supervision of the structure and the stainless steel pipes for a Cold Box Argon and Oxygen.
* X ray control and check of the pneumatic pressure test.
* Daily meeting with the customer and the subcontractor for progress.
* Precommissioning and commissioning
* Daily report to ALE management
-
AIR LIQUIDE
- Mechanical Superintendent
Paris
2006 - 2007
STEIN HEURTEY. Galvanised Steel Line for Masteel - Maanshan CHINA
Mechanical Superintendent
Assembly of a furnace and cooling tower for flat galvanised steel line.
* Contol and inspection of the construction of the furnace ;
* Leading all supervisors
* Daily meeting with the contractor ;
* Weekly Reporting to Stein Heurtey management ;
* Control of the respect of the HSE rules
-
AIR LIQUIDE
- Piping Supervisor
Paris
2006 - 2006
* Assembly supervision of the pipes HP for steam and hydrogen system.
* Supervision of the erection of the reformer and the convection .
* Control of the pressure tests. ;
* Daily meeting with the customer and subcontractor. ;
* Supervision Precom and com
Contact: Daniel PISANO ,
-
AIR LIQUIDE
- Piping Superintendent
Paris
2004 - 2005
Helium liquefaction unit for EXXON - Ras Laffan
* Prefabrication supervision.
* Control of purchase
* Control conformity of isometrics and PID. ;
* Assembly supervision of stucture and piping. ;
* Organisation of pneumatic test in accordance with HSE rules ;
* Supervision of commissioning. ;
* Supervision of the chemical treatment of the pipes.
-
AIR LIQUIDE
- Instrumentation
Paris
2003 - 2004
* Assembly supervision of the pipes HP and LP. ;
* Monitoring the installation of the equipment. ;
* Checking quality and checking pressure tests. ;
* Instrumentation follow-up.
AIR LIQUIDE Hydrogen production unit JUPITER on site Basf - Anvers BELGIUM.
* Supervision of the erection of the pipes ;
* Monitoring hydrogen, HP vapour and nitrogen pipes. ;
* Quality control.
* Phase of pneumatic and hydraulic testing.
AIR LIQUIDE . Hydrogen production unit based at Yeosu - SOUTH KOREA
* Assembly supervision ;
* Checking the installation of hydrogen pipes. ;
* Follow-up of instrumentation and test pack.
* Pneumatic and hydraulic testing;
-
AIRBUS AEROSPACE Company
- Team leader
2002 - 2002
: Preparation and installation of carbon piping for the heating system at the aeropsace construction workshops.
-
TMI Company
- Pipe fitter
2001 - 2001
LISLE JOURDAIN (Department 32)
: Preparation and fitting of stainless steel feeding pipes.
TISSOT Company ROUEN (Department76) FRANCE
Pipe fitter : Preparation and fitting of stainless steel pipes for a chemical product storage centre.
-
AIR LIQUIDE
- Site foreman
Paris
2000 - 2001
. Neutral Glass factory -
: Manufacture and fitting of oxygen pipes for a neutral glass factory unit.
-
COTUMER Company ENNERY
- Pipe fitter
1997 - 2000
: Preparation of 2 inch to 12 inch pipes in stainless steel, carbon and cromexco.
Workshop foreman : Prefabrication of a HP steam network for cogeneration.
Site foreman : Manufacture and fitting of 2 turbine cromexco and stainless steel pipes for a thermoelectrical power station in Mauritius (the client was Thermodyn-Framatome).
Team leader : Preparation of HP pipes for gas refinery units in Norway (the client was Fabricom-Statoil).
Pipe fitter : Preparation of 4 inch to 10 inch stainless steel pipes, 2 inch to 36 inch cromexco and carbon pipes at the thermoelectric power sation in Guadeloupe. (the client was EDF).
Pipe fitter : Preparation of stainless steel and carbon pipes for a compressed air and hydraulic network at the iron factory of Maubeuge, France.
Reading and controlling isometric blueprints.
-
ECCO Company
- Pipe fitter
1985 - 1997
Stainless steel and carbon pipe fitter, arc solderer for various domestic companies. (Geniclime, Forclum...)
-
Dupouy
- Journeyman
1982 - 1985
Heating engineer-pipe fitter for firms associated with the trade guilds (Dupouy, Tourraine, Thermic)
-
Calliot
- Plombier
1980 - 1982
Apprenticeship