Menu

Daniel GASPAR

RÉGION PARISIENNE

En résumé

Pas de description

Entreprises

  • Orege SA

    maintenant
  • PONTICELLI Frères - Overseas Department Manager

    2016 - maintenant
  • PONTICELLI Frères - Country Manager

    2014 - 2016
  • PONTICELLI Frères - Project Director

    2012 - 2014
  • OREGE - Directeur de l'Ingénierie et de la Construction

    Jouy-en-Josas 2010 - 2012 In charge of Team Management for Projects dedicated to EPC contracts for the installation of water treatment unit.
    Main projects:
    - Management of Engineering & Construction phases for the installation of water treatment plant in an Oil&Gas site (storage of hydrocarbon).
    - Execution of a EPC project for the construction of industrial effluent treatment unit on the client site (industrial subsidiary of the world's largest cosmetics and beauty company).
  • VEOLIA WATER OIL&GAS - Directeur de projets

    2009 - 2010 2009 - 2010 Project Director :
    Assigned to Operation Department as Project Director for assisting Tender department in order to finalise & negotiate technical, commercial and contractual proposal.

    2009 Construction Site Manager :
    Six months mission in Indonesia (Batam Island) to supervise skid fabrication and construction activities (steel work, piping, welding, painting, load out) in a sub-contractor Yard for Pluto Project.

  • ACERGY - Project manager

    2003 - 2008 2008-2009 Project Manager
    Assigned to an internal project consisting of a up-grade for a Dynamically Positioned Derrick Lay Barge (Acergy Polaris)

    2007-2008 Package Manager
    Package Manager responsible for project management of Work Package 2 (WP2) from Mexilhao Project in delivering project performance (quality, schedule and cost), project based in Rio de Janeiro, Brazil.

    2005-2007 Ship Operation Manager
    Ship Operation Manager responsible for production management of derrick laying pipe barge ACERGY ORION in delivering project performance by planning, executing, measuring and improving a range of issue associated with maximizing efficiency of the barge's construction activities
    Nigeria).

    2004-2005 Installation Manager
    Installation Manager responsible for installation engineering in the preparation of the technical-commercial offer for MOHO BILONDO project: analyze technical feasibility, carry out figuring, ensure the technical-commercial follow-up of the suppliers and take part in the negotiations with the Customer.

    2003-2004 Lead Installation Engineer
    Lead Engineer in responsibility of coordinating the technical team which elaborates installation procedures on the Bonga Project in order to prepare offshore operations (team of 10 Engineers and 5 draftsmen), and supervising Engineers mobilized on site during onshore and offshore work.

Formations

Réseau

Annuaire des membres :