  • Gea France - Project Director

    2015 - maintenant Gestion d'une équipe de 20 collaborateurs pour la fourniture d'une ligne industrielle complète de production de lait en poudre. En étroite collaboration avec le maître d'œuvre et les autres entreprises intervenantes.
  • GEA Process Engineering France - Project Manager

    Saint-Quentin 2005 - 2015 Project Management in Dairy, Chemical evaporation/cristallization from engineering/key equipment to turn-key projects of amount from 500k€ to 10M€ worldwide present (China/India/ Israel/Ireland/Poland/Brazil etc).
    Team leader of 5 to 10 team members (designer, process engineer, E&I engineer, purchaser, logistic, site supervisor, commissioning engineer) and responsible for following up external companies as a sub-contractor (design office, fabrication, expediting/quality control
    Contract execution in respect with customer specifications, EPC contractor (Technip, Hatch, Bechtel) and local regulation.
    Skills developped in contractual conditions, claim management, suspension costs.
    Using tools for following the project cost/quality delivery: Budget, MSP, team meetings, procedures from Kick-off, design, manufacturing, delivery, construction, commissioning the plant.