Within Total since 2008, I have been involved on various oil and gas projects.
Currently working as Production Engineer in Yemen LNG plant, interesting challenge of operational experience in an international environment.

Mes compétences :
Root cause analysis - leader
Risk assessment - leader
Olga - Multiphase and transient flow software
ProII - Thermodynamic software
Pinch method for Heat Integration

Entreprises

  • Total Exploration et Production - Production engineer on a LNG plant

    COURBEVOIE 2012 - maintenant Secondee in Yemen LNG Company for Total Shareholder.
    Production and performance engineer on Yemen LNG plant (6.7 MTPA)

    - Responsible for the consolidation of the production figures and operational data

    - Leader for the optimization of the plant performance (process and utilities): operational tests and implementation of new practices or settings.

    - Involvement in the Management of Change process: propose new modifications, demonstrate gain and feasibility and develop scope of work

    - Coordination of troubleshooting activities with maintenance and inspection teams

    - Participation and leadership for plant safety and integrity audits (HAZID, Risk assessments...)

    - Management of two people in International environment
  • Total Exploration & Production - Process engineer for LNG plants

    COURBEVOIE 2011 - 2012 Process engineer for LNG and cryogenic projects

    1/ Follow-up of the FEED stage of Yamal LNG project (Russia, 11 MTPA) done by CBI in London
    - Review and comment of several types of documents: philosophies, basis of design, process descriptions, PFDs, PIDs and datasheets.
    - Review and challenge the heat and mass balances
    - Development of a thermodynamic model of the plant (ProII software)
    - Process studies to optimize fractionation unit and compression architecture

    2/ Study for acid gas removal by Sprex CO2 (cryogenic process)
    Application to a gas field project. Validation and recommendation for adequate thermodynamic model.
  • Total Exploration &Production - Process engineer

    COURBEVOIE 2010 - 2011 Process engineer for oil and gas production plants:

    - Participation to conceptual and pre project studies

    - Design of surface process facilities and pipelines

    - Development of Heat and Mass Balance, equipment lists and PFD (Process flow diagrams)

    - Flow assurance study of multiphase pipeline with Olga software

    - Participation to an EOR (Enhanced Oil Recovery) study
    Evaluation of the impact of CO2 breakthrough on the surface facilities (hydraulic bottlenecks, plant’s specifications and equipments’ performance) and proposition of adequate CO2 separation technologies.

    - Study on FPSOs (Floating production storage and offloading) energy efficiency.
    Focal point for the collaboration with IFP (French Petroleum Institute).
    Development of the Pinch study applied to Pazflor FPSO.
    Recommandations for heat exchanges optimization and utilities consumption reduction.

    - Participation to safety and technical audits
  • Total Gabon - Project engineer (VIE)

    2008 - 2009 Project engineer in the development and planning department.

    1/ Responsible for the coordination for pre projects and conceptual studies

    New offshore electrical group (3.5 M$), new onshore water injection pump (5 M$), capacity increase of an onshore water treatment unit (1 M$).

    - Coordination with reservoir, maintenance, process and construction departments.
    - Site surveys for new equipment implementation
    - Development of SOR (Scope of Requirements)

    2/ Participation to the re-development project of Anguille offshore field (2 Billion $):

    - Optimization study of the production and maintenance. Offshore survey during 10 days.
    - Development of production scenarios for Total Gabon new export pipelines project

    3/ Involvement in the relationships with partners: follow up of the non-operated activities (Rabi field), coordination of technical committees for the activities operated by Total.
  • IOSIS - Project manager deputy (Internship)

    2007 - 2007 1/ Villeneuve Saint Georges Hospital - Rehabilitation of existing building and construction of a new building (80 M€).
    Coordination of the studies. To ensure the interfaces between the technical specialities (electricity, plumbing…) and the architect. Planification study for the rehabilitation phase.

    2/ Jean Bouin Stadium. Architectural competition for a new rugby stadium (75 M€)
    Coordination of the technical specialties (acoustics, civil engineering, lighting, landscape…) and focal point for the architects.