CPECC/ China Petroleum Engineering & Construction Corporation
- QA/QC Mechanical Equipment Engineer
2017 - maintenant
PETROFAC International (UAE) LLC/ LEAD Contraction & Trading ltd.
- QA/QC Mechanical Equipment Engineer
2015 - 2017REGGANE NORD DEVELOPMENT PROJECT SURFACE PROCESSING &FACILITIES
GroupementRegganeNord (GRN): Comprising Sonatrach, Repsol , RWE Dea AG and Edison International.
• Develop a quality monitoring mechanical equipment.
• Prepare the QCP(Quality Control Procedure) & ITP (Inspection & Test Plan) , also the necessary ITR (Inspection & Test Record) for the equipment of the project.
• Inspection and maintain the preservation of the equipment’s.
• Inspection and quality control of each step of erection.
TECHNIP France
- QC Equipement Inspector, rotating & Static
2014 - 2015ALGIERS REFINERY REHABILITATION AND ADAPTATION PROJECT & REALIZATION OF NEW UNITS OF REFORMING, OF CRACKING OF FUEL OIL, OF ISOMÉRISATION OF NAPHTAL AND DESULFURIZATION OF DIESEL.
• Monitoring of the work of pre- assembly of welded equipment’s on site(large columns. Flare & drums.
• Verification the conformity of the installation of equipment according to the project documents.(drawings, norm & standard.)
• Verification the conformity of de preservation of equipment’s according to the vendor recommendations and project specifications.
• Ensure to the application of the quality manual project
• inspection and control quality of each step of erection responding to standards and requirements of the project
• Support and assist the construction teams to overcome the difficulties of construction.
Company of Industrial Maintenance Engineering & Testing CIMET
- Mechanical Engineer (QA/QC)
2013 - 2014• Development of QCPs for mechanical equipment,piping and tank.
• Development and approval of welding procedures WPS et PQR) for piping and tank conjunction with the controller NDT.
• Control of technical folder and the quality of rotating and static mechanical equipment, material of piping.
• Elaboration and Check List of mechanical equipment’s.
• Preparation of the hydrostatic tests (TEST PACK), Limits and execution of the hydrostatic tests for pipe tanks.
• Assure the correspondence with ARH.
SNC- Lavalin International
- Material Control Senior
2011 - 2013
Installing the factory CPF (Central Production Facility) gas processing fields RhourdeNouss (ILLIZI) Algeria.
• Control Material for the Rotary and static equipments, Material of industrial insulation and bolts.
• Control Material for Paping (flange.reccords.pipe and valves.)
• Organization and follow-up of the task material control.
• Control, follow-up, recording of the receptions, the storing and the distribution (casting) of the on-site acquired material
• Establishment, broadcast and follow-up of the reports(relationships) of over , short and Damage(OS&D) and Non Conformities Report NCR On the material while contributing with the Engineering the QA/QC,The construction and the customer to solve the anomalies
• Listen to the client and look for the best solutions which guarantee the common interests.
Entreprise Nationale de Canalisations ENAC/SPA, filial branch of the SONATRACH group
- Mechanical Engineer
2010 - 2011Projet Pipeline DP16’’ Touggourt /El-oued.
• Monitoring equipment and construction operations
• Lead mechanical installations on the line
• Monitoring pipeline work