Total EP
- Superintendent
maintenant
-
Total EP
- Superintendent
maintenant
-
TOTAL E&P Nigeria
- Construction Base supervisor
2014 - maintenant
OFON2 Project EPCI5 Offshore
Construction Base supervisor, Offshore Platforms: Orchestrated installation of Gas Lift modules and piping. Prepared test packages and hydro tests, and ensured hook-up, revamping work (SIMOPS) and Shut down.
Manage / maintain the field activities on site, specifications, field requisition, as built drawing, etc..
Provide Tie In/Shutdown expertise to field construction for permanent and temporary works, ensuring that the work is completed safety, efficiently and quality in accordance with the applicable specification and in line with accepted engineering practices.- Provide constructability input to design and execution processes; Provide input to the construction execution strategy, contracting strategy and milestones planning.
-
TOTAL E&P Nigeria
- Construction Base supervisor
2014 - maintenant
OFON2 Project EPCI5 Offshore
Construction Base supervisor, Offshore Platforms: Orchestrated installation of Gas Lift modules and piping. Prepared test packages and hydro tests, and ensured hook-up, revamping work (SIMOPS) and Shut down.
Manage / maintain the field activities on site, specifications, field requisition, as built drawing, etc..
Provide Tie In/Shutdown expertise to field construction for permanent and temporary works, ensuring that the work is completed safety, efficiently and quality in accordance with the applicable specification and in line with accepted engineering practices.- Provide constructability input to design and execution processes; Provide input to the construction execution strategy, contracting strategy and milestones planning.
-
TOTAL E&P
- Construction Superintendent
2012 - 2014
Anguille Project CTI3 Offshore
Piping & Structures supervision, Offshore Platforms: Orchestrated installation of Electric Transformers, compressor, and piping. Prepared test packages and hydro tests, and ensured hook-up, revamping work (SIMOPS) and Shut down.
Provide constructability input to design and execution processes; Provide input to the construction execution strategy, contracting strategy and milestones planning.Manage / maintain the field activities on site, specifications, field requisition, as built drawing, etc..
-
TOTAL E&P
- Construction Superintendent
2012 - 2014
Anguille Project CTI3 Offshore
Piping & Structures supervision, Offshore Platforms: Orchestrated installation of Electric Transformers, compressor, and piping. Prepared test packages and hydro tests, and ensured hook-up, revamping work (SIMOPS) and Shut down.
Provide constructability input to design and execution processes; Provide input to the construction execution strategy, contracting strategy and milestones planning.Manage / maintain the field activities on site, specifications, field requisition, as built drawing, etc..
-
PERENCO OIL &GAS
- Piping Superintendent
2011 - 2012
PERENCO OIL &GAS, Cameroon, Africa 2011 - 2012 (With Ticam International Ilc, USA, Dallas.)
Construction Tripod BAF3 / Pipelines spools of subsea & substation for pipeline end connection
Demonstrated exceptional leadership of the following projects:
Piping & Construction Superintendent, Offshore Platform: Oversaw fabrication of pipelines spools of subsea/substation for pipeline end connection. Prepared test packages and hydro tests, coordinated prefabrication of piping spools and preparation of risers, supervised isometrics and connection of risers, Pigs trap, oversaw hook-up and revamping work.
-
PERENCO OIL &GAS
- Piping Superintendent
2011 - 2012
PERENCO OIL &GAS, Cameroon, Africa 2011 - 2012 (With Ticam International Ilc, USA, Dallas.)
Construction Tripod BAF3 / Pipelines spools of subsea & substation for pipeline end connection
Demonstrated exceptional leadership of the following projects:
Piping & Construction Superintendent, Offshore Platform: Oversaw fabrication of pipelines spools of subsea/substation for pipeline end connection. Prepared test packages and hydro tests, coordinated prefabrication of piping spools and preparation of risers, supervised isometrics and connection of risers, Pigs trap, oversaw hook-up and revamping work.
-
Total EP
- Construction Superintendent
2010 - 2011
Center Compression Unit Extension (CCU)
Fire Water Tank Construction Leader: Headed Center Compression Unit Extension (CCU). Through follow- up
Tank foundation, shell and roof construction & facilities, follow-up tank control and inspection (UT, Vacuum, Paint), and Cathodic protection. Pre commissioning / commissioning.
-
Total EP
- Construction Superintendent
2010 - 2011
Center Compression Unit Extension (CCU)
Fire Water Tank Construction Leader: Headed Center Compression Unit Extension (CCU). Through follow- up
Tank foundation, shell and roof construction & facilities, follow-up tank control and inspection (UT, Vacuum, Paint), and Cathodic protection. Pre commissioning / commissioning.
-
Total EP
- Construction Superintendent
2009 - 2010
Project Modules Gas Lift Etindi & Nyangassa (02 platforms ITF1 & NNF1)
Construction Superintendent: Guided modules gas lift in Cameroon, Africa through review of construction procedures, Fabrication Piping & Structure, erection of 02 Modules gas Lift , preparation of test packages and hydro tests, oversight of gas lift compressors installation, and coordination of hook-up; revamping work working in SIMOPS and Shut Down for 02 platforms NNF1 & ITF1 Pre commissioning/commissioning.
-
Total EP
- Construction Superintendent
2009 - 2010
Project Modules Gas Lift Etindi & Nyangassa (02 platforms ITF1 & NNF1)
Construction Superintendent: Guided modules gas lift in Cameroon, Africa through review of construction procedures, Fabrication Piping & Structure, erection of 02 Modules gas Lift , preparation of test packages and hydro tests, oversight of gas lift compressors installation, and coordination of hook-up; revamping work working in SIMOPS and Shut Down for 02 platforms NNF1 & ITF1 Pre commissioning/commissioning.
-
TICAM LTD.
- Head of Construction & Project Development
2006 - 2009
Head of Construction & Project Development: Oversaw Technical Department to include offshore and onshore operations in Camaroon, Africa. Provided work review for technical dossiers, provided project scoping and bid processing, reviewed drawings, and organized and assessed production. Engaged in follow-up maintenance team contract for platforms and FPSO (EBOME, MOUDI).
-
TICAM LTD.
- Head of Construction & Project Development
2006 - 2009
Head of Construction & Project Development: Oversaw Technical Department to include offshore and onshore operations in Camaroon, Africa. Provided work review for technical dossiers, provided project scoping and bid processing, reviewed drawings, and organized and assessed production. Engaged in follow-up maintenance team contract for platforms and FPSO (EBOME, MOUDI).
-
Static Equipment Works
- Head of Maintenance Department & Leader
2003 - 2005
Head of Maintenance Department & Leader of Static Equipment Works: Optimized construction of new tanks for national refinery company in Cameroon. Supervised facility shutdown, provided bid review, scheduled vessel clean-up, implemented new equipment, ensured maintenance of static equipment, and facilitated revamping work.
TOTAL (R-N) 2002 Shut-Down Project Manager: Supervised facilities shut-down at oil refinery in Normandy, France to include oversight of staff of 280. Established, controlled, and reviewed procedures for reactors, exchangers, columns, pipes, storage tanks, air-cooled exchangers, compressors, and pumps. Provided general shut-down of oil units.
-
Static Equipment Works
- Head of Maintenance Department & Leader
2003 - 2005
Head of Maintenance Department & Leader of Static Equipment Works: Optimized construction of new tanks for national refinery company in Cameroon. Supervised facility shutdown, provided bid review, scheduled vessel clean-up, implemented new equipment, ensured maintenance of static equipment, and facilitated revamping work.
TOTAL (R-N) 2002 Shut-Down Project Manager: Supervised facilities shut-down at oil refinery in Normandy, France to include oversight of staff of 280. Established, controlled, and reviewed procedures for reactors, exchangers, columns, pipes, storage tanks, air-cooled exchangers, compressors, and pumps. Provided general shut-down of oil units.
-
SONARA
- Site Project Leader
2001 - 2003
Site Project Leader: Organized and drove project focused on piping and structure for oil and water storage tanks in Camaroon, Africa. Performed follow-up for 2002 shut-down to include staff of 200.
TOTAL(SARA) 2000 Shut-Down Project Manager: Provided facilities shutdown in oil refinery in Martinique, France to include oversight of staff of 180. Ensured general shut-down of oil units. Established, oversaw, and evaluated procedures for reactors, exchangers, columns, pipes, storage tanks, air-cooled exchangers, compressors, and pumps.
-
SONARA
- Site Project Leader
2001 - 2003
Site Project Leader: Organized and drove project focused on piping and structure for oil and water storage tanks in Camaroon, Africa. Performed follow-up for 2002 shut-down to include staff of 200.
TOTAL(SARA) 2000 Shut-Down Project Manager: Provided facilities shutdown in oil refinery in Martinique, France to include oversight of staff of 180. Ensured general shut-down of oil units. Established, oversaw, and evaluated procedures for reactors, exchangers, columns, pipes, storage tanks, air-cooled exchangers, compressors, and pumps.
-
SONARA
- Superintendent
1992 - 2001
Site Construction Leader: Facilitated upgrade of tanks and piping to include oversight of staff of 150 in Camaroon, Africa. Ensured hook-up and revamping, and reviewed work.
-
SONARA
- Superintendent
1992 - 2001
Site Construction Leader: Facilitated upgrade of tanks and piping to include oversight of staff of 150 in Camaroon, Africa. Ensured hook-up and revamping, and reviewed work.
-
Bouygues Offshore
- Contremaitre construction
1981 - 1992
Responsible of Piping & Structures:: Supervised several constructions in the Yard. Such as CP; Piles, 04 legs Jackets 04; 06 legs jackets and 08 legs Jackets; many Decks; walkways and gangways; Tripods; Torches; Modules. Pig tracks with facilities.
-
Bouygues Offshore
- Contremaitre construction
1981 - 1992
Responsible of Piping & Structures:: Supervised several constructions in the Yard. Such as CP; Piles, 04 legs Jackets 04; 06 legs jackets and 08 legs Jackets; many Decks; walkways and gangways; Tripods; Torches; Modules. Pig tracks with facilities.