Menu

Flaubert HONANG

COURBEVOIE

En résumé

Mes compétences :
Offshore Oil & Gas
Quality Assurance
Quality Control
Microsoft Excel
Gas Lift
Onshore Oil & Gas
Oil Refineries
Offshore Platform
FPSO
relationship management
business management
Welding
System Strategy
SIMOPS
Process Improvement
Microsoft Project
Microsoft Office
Construction Site Management

Entreprises

  • Total EP - Superintendent

    maintenant
  • Total EP - Superintendent

    maintenant
  • TOTAL E&P Nigeria - Construction Base supervisor

    2014 - maintenant OFON2 Project EPCI5 Offshore
    Construction Base supervisor, Offshore Platforms: Orchestrated installation of Gas Lift modules and piping. Prepared test packages and hydro tests, and ensured hook-up, revamping work (SIMOPS) and Shut down.
    Manage / maintain the field activities on site, specifications, field requisition, as built drawing, etc..
    Provide Tie In/Shutdown expertise to field construction for permanent and temporary works, ensuring that the work is completed safety, efficiently and quality in accordance with the applicable specification and in line with accepted engineering practices.- Provide constructability input to design and execution processes; Provide input to the construction execution strategy, contracting strategy and milestones planning.
  • TOTAL E&P Nigeria - Construction Base supervisor

    2014 - maintenant OFON2 Project EPCI5 Offshore
    Construction Base supervisor, Offshore Platforms: Orchestrated installation of Gas Lift modules and piping. Prepared test packages and hydro tests, and ensured hook-up, revamping work (SIMOPS) and Shut down.
    Manage / maintain the field activities on site, specifications, field requisition, as built drawing, etc..
    Provide Tie In/Shutdown expertise to field construction for permanent and temporary works, ensuring that the work is completed safety, efficiently and quality in accordance with the applicable specification and in line with accepted engineering practices.- Provide constructability input to design and execution processes; Provide input to the construction execution strategy, contracting strategy and milestones planning.
  • TOTAL E&P - Construction Superintendent

    2012 - 2014 Anguille Project CTI3 Offshore
    Piping & Structures supervision, Offshore Platforms: Orchestrated installation of Electric Transformers, compressor, and piping. Prepared test packages and hydro tests, and ensured hook-up, revamping work (SIMOPS) and Shut down.
    Provide constructability input to design and execution processes; Provide input to the construction execution strategy, contracting strategy and milestones planning.Manage / maintain the field activities on site, specifications, field requisition, as built drawing, etc..
  • TOTAL E&P - Construction Superintendent

    2012 - 2014 Anguille Project CTI3 Offshore
    Piping & Structures supervision, Offshore Platforms: Orchestrated installation of Electric Transformers, compressor, and piping. Prepared test packages and hydro tests, and ensured hook-up, revamping work (SIMOPS) and Shut down.
    Provide constructability input to design and execution processes; Provide input to the construction execution strategy, contracting strategy and milestones planning.Manage / maintain the field activities on site, specifications, field requisition, as built drawing, etc..
  • PERENCO OIL &GAS - Piping Superintendent

    2011 - 2012 PERENCO OIL &GAS, Cameroon, Africa 2011 - 2012 (With Ticam International Ilc, USA, Dallas.)
    Construction Tripod BAF3 / Pipelines spools of subsea & substation for pipeline end connection
    Demonstrated exceptional leadership of the following projects:
    Piping & Construction Superintendent, Offshore Platform: Oversaw fabrication of pipelines spools of subsea/substation for pipeline end connection. Prepared test packages and hydro tests, coordinated prefabrication of piping spools and preparation of risers, supervised isometrics and connection of risers, Pigs trap, oversaw hook-up and revamping work.
  • PERENCO OIL &GAS - Piping Superintendent

    2011 - 2012 PERENCO OIL &GAS, Cameroon, Africa 2011 - 2012 (With Ticam International Ilc, USA, Dallas.)
    Construction Tripod BAF3 / Pipelines spools of subsea & substation for pipeline end connection
    Demonstrated exceptional leadership of the following projects:
    Piping & Construction Superintendent, Offshore Platform: Oversaw fabrication of pipelines spools of subsea/substation for pipeline end connection. Prepared test packages and hydro tests, coordinated prefabrication of piping spools and preparation of risers, supervised isometrics and connection of risers, Pigs trap, oversaw hook-up and revamping work.
  • Total EP - Construction Superintendent

    2010 - 2011 Center Compression Unit Extension (CCU)
    Fire Water Tank Construction Leader: Headed Center Compression Unit Extension (CCU). Through follow- up
    Tank foundation, shell and roof construction & facilities, follow-up tank control and inspection (UT, Vacuum, Paint), and Cathodic protection. Pre commissioning / commissioning.
  • Total EP - Construction Superintendent

    2010 - 2011 Center Compression Unit Extension (CCU)
    Fire Water Tank Construction Leader: Headed Center Compression Unit Extension (CCU). Through follow- up
    Tank foundation, shell and roof construction & facilities, follow-up tank control and inspection (UT, Vacuum, Paint), and Cathodic protection. Pre commissioning / commissioning.
  • Total EP - Construction Superintendent

    2009 - 2010 Project Modules Gas Lift Etindi & Nyangassa (02 platforms ITF1 & NNF1)
    Construction Superintendent: Guided modules gas lift in Cameroon, Africa through review of construction procedures, Fabrication Piping & Structure, erection of 02 Modules gas Lift , preparation of test packages and hydro tests, oversight of gas lift compressors installation, and coordination of hook-up; revamping work working in SIMOPS and Shut Down for 02 platforms NNF1 & ITF1 Pre commissioning/commissioning.
  • Total EP - Construction Superintendent

    2009 - 2010 Project Modules Gas Lift Etindi & Nyangassa (02 platforms ITF1 & NNF1)
    Construction Superintendent: Guided modules gas lift in Cameroon, Africa through review of construction procedures, Fabrication Piping & Structure, erection of 02 Modules gas Lift , preparation of test packages and hydro tests, oversight of gas lift compressors installation, and coordination of hook-up; revamping work working in SIMOPS and Shut Down for 02 platforms NNF1 & ITF1 Pre commissioning/commissioning.
  • TICAM LTD. - Head of Construction & Project Development

    2006 - 2009  Head of Construction & Project Development: Oversaw Technical Department to include offshore and onshore operations in Camaroon, Africa. Provided work review for technical dossiers, provided project scoping and bid processing, reviewed drawings, and organized and assessed production. Engaged in follow-up maintenance team contract for platforms and FPSO (EBOME, MOUDI).
  • TICAM LTD. - Head of Construction & Project Development

    2006 - 2009  Head of Construction & Project Development: Oversaw Technical Department to include offshore and onshore operations in Camaroon, Africa. Provided work review for technical dossiers, provided project scoping and bid processing, reviewed drawings, and organized and assessed production. Engaged in follow-up maintenance team contract for platforms and FPSO (EBOME, MOUDI).
  • Static Equipment Works - Head of Maintenance Department & Leader

    2003 - 2005  Head of Maintenance Department & Leader of Static Equipment Works: Optimized construction of new tanks for national refinery company in Cameroon. Supervised facility shutdown, provided bid review, scheduled vessel clean-up, implemented new equipment, ensured maintenance of static equipment, and facilitated revamping work.
    TOTAL (R-N)  2002  Shut-Down Project Manager: Supervised facilities shut-down at oil refinery in Normandy, France to include oversight of staff of 280. Established, controlled, and reviewed procedures for reactors, exchangers, columns, pipes, storage tanks, air-cooled exchangers, compressors, and pumps. Provided general shut-down of oil units.
  • Static Equipment Works - Head of Maintenance Department & Leader

    2003 - 2005  Head of Maintenance Department & Leader of Static Equipment Works: Optimized construction of new tanks for national refinery company in Cameroon. Supervised facility shutdown, provided bid review, scheduled vessel clean-up, implemented new equipment, ensured maintenance of static equipment, and facilitated revamping work.
    TOTAL (R-N)  2002  Shut-Down Project Manager: Supervised facilities shut-down at oil refinery in Normandy, France to include oversight of staff of 280. Established, controlled, and reviewed procedures for reactors, exchangers, columns, pipes, storage tanks, air-cooled exchangers, compressors, and pumps. Provided general shut-down of oil units.
  • SONARA - Site Project Leader

    2001 - 2003  Site Project Leader: Organized and drove project focused on piping and structure for oil and water storage tanks in Camaroon, Africa. Performed follow-up for 2002 shut-down to include staff of 200.
    TOTAL(SARA)  2000 Shut-Down Project Manager: Provided facilities shutdown in oil refinery in Martinique, France to include oversight of staff of 180. Ensured general shut-down of oil units. Established, oversaw, and evaluated procedures for reactors, exchangers, columns, pipes, storage tanks, air-cooled exchangers, compressors, and pumps.
  • SONARA - Site Project Leader

    2001 - 2003  Site Project Leader: Organized and drove project focused on piping and structure for oil and water storage tanks in Camaroon, Africa. Performed follow-up for 2002 shut-down to include staff of 200.
    TOTAL(SARA)  2000 Shut-Down Project Manager: Provided facilities shutdown in oil refinery in Martinique, France to include oversight of staff of 180. Ensured general shut-down of oil units. Established, oversaw, and evaluated procedures for reactors, exchangers, columns, pipes, storage tanks, air-cooled exchangers, compressors, and pumps.
  • SONARA - Superintendent

    1992 - 2001  Site Construction Leader: Facilitated upgrade of tanks and piping to include oversight of staff of 150 in Camaroon, Africa. Ensured hook-up and revamping, and reviewed work.
  • SONARA - Superintendent

    1992 - 2001  Site Construction Leader: Facilitated upgrade of tanks and piping to include oversight of staff of 150 in Camaroon, Africa. Ensured hook-up and revamping, and reviewed work.
  • Bouygues Offshore - Contremaitre construction

    1981 - 1992  Responsible of Piping & Structures:: Supervised several constructions in the Yard. Such as CP; Piles, 04 legs Jackets 04; 06 legs jackets and 08 legs Jackets; many Decks; walkways and gangways; Tripods; Torches; Modules. Pig tracks with facilities.
  • Bouygues Offshore - Contremaitre construction

    1981 - 1992  Responsible of Piping & Structures:: Supervised several constructions in the Yard. Such as CP; Piles, 04 legs Jackets 04; 06 legs jackets and 08 legs Jackets; many Decks; walkways and gangways; Tripods; Torches; Modules. Pig tracks with facilities.

Formations

  • Lincoln College Of Technology (Arlington)

    Arlington 2010 - 2011 6G
  • Lincoln College Of Technology (Arlington)

    Arlington 2010 - 2011 6G
  • America Welding Society (Dallas)

    Dallas 2008 - maintenant PROFESSIONAL MEMBERSHIP
  • America Welding Society (Dallas)

    Dallas 2008 - maintenant PROFESSIONAL MEMBERSHIP
  • Global Advance Business Institute (Dallas)

    Dallas 2006 - 2007 M.B.A. Project management
  • Global Advance Business Institute (Dallas)

    Dallas 2006 - 2007 M.B.A. Project management
  • National Center Of Continuing Professional Education (Douala)

    Douala 1987 - 1989 DUT Piping
  • National Center Of Continuing Professional Education (Douala)

    Douala 1987 - 1989 DUT Piping

Réseau

Annuaire des membres :