* Following rotary drilling: collect, packing, description of cuttings during the
drilling and stopping drilling within the anhydrite sequence.
* Following diamond drilling: collect, packing, description of core during the
drilling and stopping drilling within Tachyhydrite formation / Cocobeach formation
(chela formation).
*Geothenical core logging
*Core processing ;
*Supervise sismic line
*Make correlation between geophysical data and geological data
*Geotechnical core logging of the overburden and of the Evaporate sequence
*Metallurgical sampling
*Point load test
*Borehole reports
*Regional hydrological surveying
Préparation of sampling Schedule.
Core sample planning so that Ore zones, (their hangingwall and footwall are
participate to rig up, prepare sampling place to shakers, packages, wet and dry
sample, making calcimetry, fluorescence in resources zone, established master
log, checking pit level, baground arrival gases, by hydrocarbon exploration,
hydrocarbon surface gas detectors record
Formations
Université Marien NGOUABI, Faculté Des Sciences Et Techniques, Département De Géologie (Brazzaville)
Brazzaville2006 - 2008master es sciences de la terre