Menu

Ghazi MIHIEDINE

BEKAA

En résumé

Technical Solution post tension Consultant concrete structure,Bridges Expert ,PTslab Building Floor, Cement Silos Construction
Freyssinet Certificate (Pond et Chausse

Mes compétences :
Philosophy
Retaining Walls
then monitoring
progress monitoring
Transformers
Quality Control
PADS
Excavations
Equipments maintenance
structure Supervision
procedure implementation supervision
overall design
Supervision Preparation
Star Standard Hotel > 5 Star Hotel
Site Manager Supervision
Site Engineer Supervision
SFF design
Roofing
Assembly Plants

Entreprises

  • Khatib&Alami - Site engineer pre stress concrete stracture

    2009 - maintenant supervision and controled all project
  • Khatib &Alami KSA - Site engineer -consultant

    2009 - 2012 supervision all project
  • chef de chantier freyssinet - Bridges Expert

    2009 - maintenant
  • Systra,Canarail ,Khatib&Alami - Consultant

    2009 - maintenant Saudi Arabia Saudi Arabian Railway(SAR)/ Ministry Of Bridges Technician Implement Supervise of all type bridges, e.g. camel crossing, UR, OR bridges, and OW Bridges.
    Finance/(PIF) Supervision Preparation and submission of technical progress reports
    I S C Co. Consultant Develop & leadership at 4 Contracting Co. teams-CTW100-CTW200-CTW300-CTW400- 2400KM/L,
    I S C Review comments and approval of shop drawings.
    Louis Berger,Systra,Canarail ,Khatib&Alami Supervision and monitoring post-tensioning activities of pre- stressed girders as per SFF design and AASHTO manual.
    Inspection of overall design in Co-ordination between multiple disciplines.
    Monitoring the progress of the project and timely completion.
  • The Contract - Consultant

    2008 - 2009
  • Freyssinet International Butec - Supervisor

    2008 - maintenant Lebanon- Freyssinet International Butec joint venture Civil post tension Supervision of pre-stressed box girders
    Increment launching Box girders
    Bridge
  • Bechtel co. - Uksel Turkish Contractor

    2007 - 2008
  • Bechtel - Contractor

    San Francisco 2007 - 2008 Qatar Bechtel company Contractor: Site Engineer Supervision of pre-stress silos.
    Freyssinet New Doha International Uksel Turkish company 12 box girders Supervision of site works such as, Sleep form, foundation, retaining walls, columns, buildings.
    Menard airport Supervision of steel reinforcement of structural RCC structural elements.
    Supervision and monitoring of concrete pouring, and management of concreting program.
    Preparation of weekly and monthly progress reports for onward submission to the Structural
    Engineer and Construction Manager.
  • F.C.B Cement - Site engineer

    2007 - maintenant Cement factory Contractor : SIAC Egypt 5 Silos
    Freyssinet
    Menard
  • Qatar New Doha Airport (Hamad Airport ) - Site civil engineer

    2007 - 2007 F.C.B Consultant French company

    Qatar New Doha Airport (Hamad Airport ) DOHA
    Site civil engineer (Freyssinet sub contractor )
    11 viaducts Bridges
  • Freyssinet - Consultant & Contractor

    2007 - 2008 Contractor : SIAC Egypt
    Project: Qatar - Ummbab Cement Factory 4 blending silos 1 clinker silos
    Designation: Site Engineer

    * Supervision of pre-stress silos. ;
    * Supervision of site works such as, Sleep form, foundation, retaining walls, columns, buildings.
    * Supervision of steel reinforcement of structural RCC structural elements.
    * Supervision and monitoring of pouring of concrete, and management of concreting program.
    * Preparation of weekly and monthly progress reports for onward submission to the Structural Engineer and Construction Manager.

    In Lebanon
  • Freyssinet International - Pond et chausse

    1999 - 2006 Lebanon Rmayleh PROJECT Freyssinet International PT slab Vlla Lebanese villages project Site Manager Supervision of overall project.
    Wings wall in natural stone building, Lebanese garden design, Plantation of old landscaping trees
    Sanitary sewer line and construction of manholes.
    Concrete pads for electric transformers, metering switchgear. Electric & telephone duct bank.
    Mandrill test for all types of duct bank.
    Installation and interlocking of curb stones on walkway & side walk paving
    Carrying out asphalt wearing course of rigid pavement (Stone roads) and road marking in primary & secondary roadways.
    Streamlining of Storm drainage system vide installation of reinforced concrete pipes & UPVC pipe as per Royal Commission specification, including catch basins.
    Fire water system: Installation of UPVC class-V pipes, post indicator valve, fire hydrant, butterfly valves and concrete chambers.
  • Freyssinet Company - Site Manager

    1999 - 2006 Project: Ajial village,60,000m2-Owner:Mr Nabil Loutfi.
    Designation: Site Manager
    Supervision of overall project.
    * Excavation for prepare a Genie Civil lots ,Embankment a Degradation terrassment for agricultural land .
    * Wings wall in natural stone building, Lebanese garden design ,Plantation a big tree in long age in high view.
    * Conversion of potable water irrigation line to treated sewage water irrigation system.
    * Sanitary sewer line and construction of manholes. ;
    * Hydro pressure tests, chlorination, bacteriological tests for potable water. ;
    * Ex filtration test for new sanitary sewer manhole. ;
    * Concrete pads for electric transformers, metering switchgear. Electric & telephone duct bank. Mandrill test for all types of duct bank.
    * Installation and interlocking of curb stones on walkway & side walk paving
    * Carrying out asphalt wearing course of rigid pavement (Stone roads) and road marking in primary & secondary roadways.
    * Streamlining of Storm drainage system vide installation of reinforced concrete pipes & UPVC pipe as per Royal Commission specification,
    including catch basins.
    * Fire water system: Installation of UPVC class-V pipes, post indicator valve, fire hydrant, butterfly valves and concrete chambers.
  • FREYSSINET FINANCE - Site Manager

    1999 - 2006
  • Freyssinet Company - Consultant & Contractor

    1997 - 1999 Project: Hazmiieh - Adlieh Bridges A 22 Viaduc Box Girders
    Designation: Civil Supervisor
    * Supervision of pre-stress box girders ;
    * Supervision of site works such as, foundation, retaining walls, columns, buildings
    * Supervision of steel reinforcement of structural RCC structural elements
    * Supervision and monitoring of pouring of concrete, and management of concreting program
    * Preparation of weekly and monthly progress reports for onward submission to the Structural Engineer and Construction Manager.
    * Preparation of safety schemes at work site and coordinating with safety manager for ensuring safety procedure to avoid fatal accidents.
  • Freyssinet - Civil supervisor

    1997 - 1999 Lebanon Freyssinet Civil supervisor Supervision of pre-stress box girder,Threading, stressing,grouting
    Hazmieh Adlieh International 25 number Supervision of site works such as, foundation, retaining walls, columns, buildings
    Bridges Viaducts Supervision of steel reinforcement of structural RCC structural elements
    B.E.T.H.E Supervision and monitoring of pouring of concrete, and management of concreting program
    contractor Preparation of weekly and monthly progress reports for onward submission to the Structural
    ACE Consultant Engineer and Construction Manager.
    Preparation of safety schemes at work site and coordinating with safety manager for ensuring safety procedure to avoid fatal accidents.
  • Khatib&Alami - Consultant & Contractorey

    1997 - 1999
  • PT Slab - Technical Consultant

    1996 - maintenant Employment Managment
    Over 20 years experience ,Civil Structural Engineer,Recomondation a Certificate from Freyssinet
    a)Leader Ship Engineer And Construction Manager ,
    - Managerial abilities of Developing & leader staff all acts professionally and with due diligence to staff guard the interests of the constructions as preliminary. Company program
    -Review and comment in the Design shop drawings before starting the Implementation phase
    -Adapted and controlled all materials and equipment’s storage in the project line.
    - Studies and evaluation of the project requirement and scope
    - Review comment and approval of shop drawing, preparing technical report
    -Inspection of overall design in Co-ordination between multiple disciplines.
    -Making arrangement s for meeting and ensuring that proceeding are recorded and communicated.
    - A daily visiting and supervising site by site and learn the team about the technical definition at
    All materials fixing
    -Supervising structures Reinforcement steel before purring Concrete
    - The Concrete Qualities in any purring structure form, Type for form work, scaffolding installation
    b) I Followed all these details for Seven years in the Implementation Supervision Consultant co,ISC
    Saudi Arabia South North Railway leading team engineering for five Contractors- S A R
    More than 3000 km/L
    -CTW100 Hafer Al Batten - Bin Laden group
    - CTW200 Hail City –Al Sewayket Contractor
    - CTW300 Quorayatt City – Al Rachid group
    -CTW400 Majjmaa City – Al Omayer Contractor
    -The Chinese Railway Office group


  • Dar al Handasa - Contractor

    1996 - 1997
  • Ecole Nationale Des Ponts Et Chaussées - Bridges Expert

    Champs-sur-Marne 1996 - maintenant * Supervision of all type bridges, i.e. camel crossing, UR, OR bridges, and OW Bridges.
    * Preparation of weekly and monthly progress reports for onward submission to the Structural Engineer and Construction Manager.
    * Acts professionally and with due diligence to safe guard the interests of the company.
    * Managerial abilities of Developing & leading a team of Engineers.
    * Study and evaluation of the project requirements and scope.
    * Review comments and approval of shop drawings. preparing technical reports.
    * Inspection of overall design in Co-ordination between multiple disciplines.
    * Making arrangements for meetings and ensuring that proceedings are recorded and communicated.
    * Monitoring the progress of the project and timely completion.
    * Supervision and monitoring post-tensioning activities of pre- stressed girders as per SFF design and AASHTO manual.

    Projects:CTW100 (Quorayat), CTW200 (Hail), CTW300 (Hafer el Baten), CTW400 (Majmah).
    Supervision of fabrication of long Pre-Stressed concrete girders in the girder yard and then monitoring the transportation and launching of
    girders.

    In Qatar
    A))Project: New Doha International Airport 12 Box Girders
    Consultant :Bechtel company
    Contractor :Uksel Turkish company
  • Freyssinet Company - Civil Supervisor

    1996 - 1997 Consultant : Dar Al Handasa
    Contractor :C.C.C
    Project: Sibline Cement Factory /Silos
    Designation: Civil Supervisor
    * Supervision of pre-stress silos
    * Sleep Form concrete structure ;
    * Preparation of safety schemes at work site and coordinating with safety manager for ensuring safety procedure to avoid fatal accidents. ;
    * Preparation of preliminary documentation regarding work execution and progress monitoring in conformity to the project schedule.
    Preparation of Quality Control documents and coordinating with Quality Control Manager for ensuring the works to be carried as per
    designed drawings and contractual specifications.

    Certified: From Freyssinet- International .CIE . France
  • Freyssinet International - CHEF DE CHANTIER

    1996 - maintenant Computer Skills:
    * Normal

    Language:
    * English: Fluent Level .
    * French: Fluent Level .
    * Arabic :Excellent.

    Hobbies & other interests :
    * Fishing - Hunting- Racing.

    In Saudi Arabia
    Client: Saudi Arabian Railway(SAR)/Ministry Of Finance/(PIF)
    Project: North South Railway Project(NSR)

    Railway Project Management Company(RPMC)
  • Freyssinet International Company - Consultant

    1996 - maintenant Contractor : Butec& freyssinet joint venture
    Designation: Civil Supervisor
    * Supervision of pre stressed box girders
  • Freyssinet international - Site engineer

    1996 - 2008 prestressing operator
    post-tensioning system(freyssinet
    bearing installation
    freyssibar system
    site engineer,with freyssinet menard (QATAR)
    Site engineer,with freyssinet inter (Mdayrej,Lebanon)
    Khtib&Alami consultant engineer,present in Saudi railway
  • Lebanon Sibbline Ciment - Civil supervisor

    1996 - 1996 Lebanon Sibbline Ciment factory Freyssinet International Civil supervisor Supervision of pre-stress silos
    Sleep Form concrete structure.
    Preparation of preliminary documentation regarding work execution and progress monitoring in conformity to the project schedule.
    Preparation of Quality Control documents and coordinating with Quality Control Manager for ensuring the works to be carried as per designed drawings and contractual specifications.

Formations

  • Le Pont (Casablanca)

    Casablanca 1996 - 2008 Diploma

    Freyssinet International CIE a professional certificate
  • Ecole Les Soeurs Des Saints Coeurs (Baalbeck)

    Baalbeck 1987 - maintenant philosophie francaise

    3eme anne secondaire le terminal Libanaise
  • Les Soeurs De Saint Coeur-LEBANON (Zahlee-Bekaa)

    Zahlee-Bekaa 1986 - maintenant philosophie francaise
  • Ecole Des Soeurs (Beirut)

    Beirut 1984 - 1987 Baccalaureate Degree

    des saints Coeur's Baccalaureate Diploma-part two
    Lebanese (Philosophy Branch)

Réseau

Annuaire des membres :