Menu

Gildas Tonanmi AKPOLI

COLMAR

En résumé

Projet profesionnel:
• Ingénieur infrastructures génie civil
• Coordinateur études-travaux
• Ingénieur qualités
• Conducteur de travaux
• Ingénieur recherche développement et innovation


Mes compétences :
Work experience: R&D (Peikko Slovakia), Railways (
Civil engineering: ArchiCAD, AutoCAD, Cast3M, Draf
Civil engineering: Structures designing according
Microsoft office and Open Office: Word, Excel, Pow
Construction site
Microsoft Office
Formwork
Autocad
ArchiCAD
geotechnical testing
Transformers
Team Management
Project monitoring
Microsoft Word
Microsoft Project
Microsoft PowerPoint
Microsoft Excel
Industrial Buildings
HGVs
Earthworks
Draftsight
Civil Engineering

Entreprises

  • PEIKKO Slovaquie - R&D internship

    2014 - 2014 New anchorage concept development within PEIKKO Group.
    Bibliographic researches on anchorages according to EC2 (part 8.4), CEN TS 1992-4-2 and the FIB bulletins (1,2,3,43 and 58)
    Determination of the geometric dimensions and the design resistances in the cases of tension and shear loading.
  • FREYSSINET FRANCE - Site foreman

    2013 - 2013 LGV-SEA Tours-Bordeaux : PRO 2919 in Saint-André-de-Cubzac, La Dordogne viaduct
    • Writing implementation procedures (shifting, lifting and lowering of heavy loads) - Writing of PPSPS and PAQ
    • Team management (installation of jacks and threading strands)
    Construction of new travelers building at the railway station of Nanterre University
    • Writing implementation procedures (shifting, lifting and lowering of heavy loads) - Writing of PPSPS and PAQ
    • Team management (Carrying out of high resistance steel and prestressing bar and resin seal)
    • Realization of plans
    Shifting of the bridge in Rosapark (Paris 19th ): Team management (installation of threading strands)
    Bridge on the road TLN104: attending to the shifting operation
  • CAZAL TP - Site foreman

    2012 - 2012 Ensuring compliance of the transformers pits of the EDF power plant in Carbonne:
    • Writing implementation procedures for pit patching and pit frame installation
    • Realization of plans
    • Monitoring construction sites (construction sites set up, assisting with electric fishing, installation of earthen cofferdam, pumping systems, sediment cores)
    Construction of a 2,000 m3 reservoir in Montredon (tender stage):
    • Writing technical papers, prevention plan and implementation planning for construction phases
    • Consulting with suppliers for public tenders (concrete, formwork , geotechnical testing , public roads and other networks)
  • Eiffage Travaux Publics - Site foreman

    Vélizy-Villacoublay 2011 - 2011 Construction of noise barriers on the RN88 road near Albi
    • Monitoring construction sites (constructions site set up, iron framework installation; formwork and concreting of reinforced concrete barriers)
    Surfaces rehabilitation work in industrial buildings (COMAU and TRIFYL in Castres)
    • Monitoring construction sites (constructions site set up, iron framework installation; concreting of industrial buildings surfaces, disbursement of slabs)
    Rehabilitation work of superstructure (central median and downstream plank) of the Cantepeau Bridge
    • Monitoring construction sites (constructions site set up, concreting of central median of a bridge)
  • Engineering Consulting and Construction Office (Bénin) - Internship in an engineering office

    2010 - 2010 Calculation of the supporting structure of a building type R+2 for private use: descent of the load on structural elements (beams, columns, slab, sill, footing) and reinforced concrete calculations according to BAEL 91, amended 99 (RDM6, AutoCAD).
  • Benin's Construction network - Internship as site manager

    2009 - 2009 • Construction project for the École Nationale des Instituteurs de Porto-Novo (National School for Teachers in Porto-Novo): inspection of iron framework and formwork plans (columns, beams, slabs, walls). Quantification of land volumes and number of trips for trucks in case of embankment. Geotechnical Testing follow-up done by the supervising office.
  • Benin's Ministry of Public Works and Transportation - Internship in project management

    2008 - 2008 Microsoft Project: Planning August-September 2008 : Management of Technical Studies
    * Introduction to 3D design software ArchiCAD 9 and AutoCAD.
    Robot: designing and calculation of bearing structure. * Project monitoring (implementation of different pavement layers) in the rehabilitation construction site of link between the Airport- Place du souvenir-Air Afrique head office (about 6km in length).