Guiguen YANN

LAEM CHABANG

En résumé

PROFILE:
A Senior Quality and Engineering Manager with a wide range of experience in the Oil and Gas industry. Able to work on own initiative and as part of a team. Proven leadership skills involving managing, developing and motivating teams to achieve their objectives. First-class analytical, design and problem solving skills. Dedicated to maintaining and improving high quality standards.

MAJOR ACHIEVEMENTS:
SUCCESSFUL COMPLETION OF QATARGAS DEBOTTLENECKING PROJECT
Handed Over successfully QATARGAS Debottlenecking Project ahead of schedule and moreover, with 5 Million Manhours LTA free. All personnel on the Project attended the QATARGAS Induction, H2S and B.A Training which emphasizes the importance of QATARGAS Incident and Injury Free culture.

TECHNIP’S ‘’JACQUES FRANQUELIN’’ AWARD 2000
I was awarded for the creation and implementation of a Site Quality Management System during MIDOR Refinery project. This system is now used as TECHNIP GROUP tool for the follow up and Hand Over of major projects.

Mes compétences :
Management
Quality
Quality management
Quality Management System

Entreprises

  • INPEX - Module Yard Representative

    2014 - maintenant ICHTHYS Onshore LNG Facilities - CUEL Yard - Thailand
  • INPEX - QA/QC Lead

    2012 - 2014 ICHTHYS Onshore LNG Facilities - CUEL Yard - Thailand
  • Total UK - System Integration Test Engineer

    COURBEVOIE 2012 - 2012 Laggan Tormore Project
    Based in Tonsberg GGT Yard.
  • Total UK - Subsea Structures and Manifolds QC Engineer

    COURBEVOIE 2011 - 2011 Laggan Tormore Project
    Based in Tonsberg GGT Yard.
  • Total E&P Angola - QA/QC Coordinator

    COURBEVOIE 2010 - 2010 Gas Export Pipeline Project - Block 17
  • Yemen LNG - Total SA - Site QA/QC Suptd

    2006 - 2010 Aug.2006 - Date: TOTAL
    Aug.2006 - Feb.2010: SITE QA/QC SUPERINTENDENT
    YEMEN LNG PROJECT (TOTAL) – BAL HAF – YEMEN (K.B.R.-TECHNIP Joint Venture)
    The Project facilities is consisting of two LNG process trains of the same capacity, two cryogenic storage tanks, with all associated utilities and includes gas transmission and transfer pipelines that are running from the Marib region to feed facilities located in Balhaf, which is situated on the southern coast of Yemen.
    The Project’s natural gas liquefaction plant has a design capacity of 6.9 million tons per annum (MTPA) and a guaranteed 6.7 (MTPA) and will use natural gas extracted from the developed fields of Alif, Al-Raja and Asa’ad Al Kamil.

    Dec.1992 - July 2006: TECHNIP
    Aug.2005 - July 2006: FIELD QUALITY ENGINEER (UTILITY / OFFSITE / OFFPLOT)
    QATARGAS II (EXXONMOBIL) LNG ONSHORE FACILITIES PROJECT – QATAR – (CHIYODA-TECHNIP Joint Venture)
    The overall work scope of the Project is to provide engineering, procurement and construction work and services in respect of LNG Onshore Facilities at Qatar Liquefied Gas Company Limited (II) for the LNG ONSHORE PROJECT.
    2002 - June 2005: FIELD ENGINEERING MANAGER & QA/QC MANAGER
    QATARGAS (EXXONMOBIL) LNG DEBOTTLENECKING PROJECT – QATAR (CHIYODA-TECHNIP Joint Venture)
    The overall work scope of the Project was to design, procure, fabricate, install, construct and commission the modifications required for Debottlenecking QATARGAS LNG PLANT.

    2001 - 2002: FIELD ENGINEERING MANAGER & QA/QC MANAGER
    PETRO CARLING 2000 PROJECT (ATOFINA) - FRANCE
    The overall work scope of the Project was to design, procure, fabricate, install, construct and commission the modifications required to increase the capacity of the Steam Cracker Line No. 1. from 240.000 T/Year to 320.000 T/Year.

    1998 - 2001: QA/QC MANAGER
    MIDOR PROJECT (MIDDLE EAST OIL REFINERY) - EGYPT
    The main scope of work awarded to TECHNIP, was basically the Engineering/Procurement and Construction/Commissioning to Start-up of the “In-fence” Refinery. Additionally, a reimbursable portion was awarded to TECHNIP for Two years Spare Parts, Chemicals and Catalysts, Laboratory & Warehouse equipment. (28.500.000 Man-hours).

    1997 - 1998: FIELD ENGINEER
    SHAYBAH DOWSTREAM PROCESSING FACILITIES PROJECT (ARAMCO) – K.S.A.

    1996: ASSISTANT PROCESS ENGINEER
    Duties & Responsibilities:
    Realized and up dated process and utilities P.I.D.s (Process & Instrumentation Diagrams) for TOTAL La Mede (Revamping of the Gas Plant) and TABRIZ (Petrochemical Plant).

    1995: FIELD ENGINEER
    ONSHORE GAS DEVELOPMENT PROJECT (O.G.D. 545) – (ADNOC) – U.A.E.

    1993 - 1994: ASSISTANT PROCESS ENGINEER
    TECHNIP PARIS LA DEFENSE – FRANCE
    Duties & Responsibilities:
    Conception and up-dating of Process and Utilities P.I.D.s for ONSHORE GAS DEVELOPMENT PROJECT (O.G.D. 545) – UNITED ARAB EMIRATES.
    Conception of Visbreaker Unit, Off-site and Interconnecting P.I.D.s for LEUNA REFINERY PROJECT 2000 – GERMANY.
    Conception and up-dating of Process and Utilities P.I.D.s for the Topping Unit of BUKHARA REFINERY PROJECT (F.E.E.D.) – OUZBEKISTAN.