TECHNIP FRANCE MAJOR
- ASSIGNMENTS AS ESTIMATING ENGINEER
2012 - maintenant
Browse Floating Liquefaction Natural Gas- Shell/Woodside. Australia. FEED phase. AACE Class 2 Cost Estimate. Participation in the Open Book Estimate. Responsible of the Bulk, procurement and construction cost, working in a JV with Samsung. Participation in the Cash Flow, Contract Conversion Strategy and Escalation model development and application. Responsible of Browse FEED service Proposal, participation in the Browse EPC service proposal.
Browse Floating Liquefaction Natural Gas- Shell/Woodside - Pre FEED phase. Participation in the AACE Class 3, Cost Estimate. Participation in the overall Cost Estimate (Engineering, Procurement and Construction Cost based on Prelude project). Responsible of Browse pre-FEED service Proposal.
Shell 2020, Participation in the development of the framework agreement for FLNG Projects.
CIGMA Project - PDVSA. Venezuela. Responsible of the Home Office Service Proposal.
Aromatics Extraction U-0200 Revamp Project- GALP. Portugal. AACE Class 3, Cost Estimate. Responsible of the transportation Cost.
Stracel UPM's - TOTAL- Basic Engineering - Biomass to liquid, compare technical and economical 3 licensors. France, Strasbourg. AACE Class 3, Cost Estimate. Responsible of the Equipment Cost Estimate.
-
TECHNIP IBERIA MAJOR
- ASSIGNMENTS AS PLANNER & COST CONTROLLER
2010 - 2012
COST CONTROLLER, AND ESTIMATOR WERE:
Lead Estimator
* INEOS - Lavéra Refinery -Upgrade of three fuel oil 140 t/h boilers to reduce emissions (France). Responsible of AACE Class 3, Cost Estimate.
* ASESA - Increase quality of asphalt - Tarragona (Spain). Responsible of AACE Class 5, Cost Estimate
* KEMIRA IBERICA- New coagulants plant for paper and residual waters. AACE Class 3, Cost Estimate
* UBE -Upgrade of a cyclohexanone plant form 50.000 t/year to 100.000 t/year. Castellón (Spain). AACE Class 4, Cost Estimate
Lead Planning and Cost Controller. INEOS - Upgrade of LNG storage capacity from 390.000 m3 to 840,000 m3, Construction of three 150.000 m3 LNG tanks. -.
-
TECHNIP IBERIA MAJOR
- Contract Administrator & Planning and Cost Controller
2006 - 2010
Planning and Cost Controller Responsible, ( Gas Plant.- Managing a team of 3 valuation technicians, working with a Team of 30 people as a Construction Supervision - Main Projects:
* Upgrade ENAGAS LNG Facilities Plant from 390.000 m3 to 840,000 m3, Process and Storages Capacity.
* Construction of three Tanks 150.000 m3 LNG tanks. ;
* More than 15 Minor projects with more than 30 sub-contractors for facilities to increase the storage capacity of the plant.
Main Roles:
Contract administrator
Construction contract administrator, including clause modifications, amendments in negotiations, claim, contract follow-up and closure, verification of contractual payments.
Anticipate contract claims in terms of labor, materials, equipment and technical challenges.
Projects cost control
Projects cost-control, valuation approvals, assessment of changed orders and new unit prices.
Construction cost estimations before and during the project.
Cost estimation of additional jobs.
Responsible for evaluating the adequacy and effectiveness of processes, procedures and cost- control measures.
Manage and develop the cost -control team.
Preliminary invoice approval.
Lead Planning
Planning and follow-up of client's general plan for plant upgrade.
Detailed planning and follow-up of all minor projects.
Analyze and coordinate subcontractor's schedules following client leads.
Evaluate change-effect on project cost and schedule.
Monthly, closing and proposed changes forecast.
Analyze and report productivity and trends.
Monthly internal and external reports, including planning and cost information.
File actual schedule historical data for estimating similar projects in the future
-
OTEPI Consultores, S.A.
- Project Controller
2004 - 2005
Responsible for development and control of the production departments; reporting directly to the EPC director.
Management Control: Backlog, staff plan, income and costs, budget, cash-flow, forecasting, performance index and assistance to the EPC director in the preparation of execution reports for the production areas.
-
Burgmann Ibérica
- Mechanical Engineer
2003 - 2004
Design and selection of sealing systems for rotating equipment for chemical, textile and feeding plants. Field work and client support. Coordination and preparation of technical proposals.
-
Petróleos de Venezuela S.A
- Training Engineer
2002 - 2003
Working in the gas production area for the East Division under the Integrated Training Program: PIA-PDVSA-CIED. Theoretical and practical formation on exploration and production process, productivity principles, physical characterization of the well, hydrocarbon properties, production engineering, security, hygiene and environment.
-
Burgmann Venezuela
- Project Engineer
2001 - 2002
Design and selection of sealing systems for oil refinery plants including: ``Complejo de Refinación CRP Cardon'' and ``Amuay Refinary''. Field work and client support. Coordination and preparation of technical proposals. Active participation in development and planning stages for the engineering department. Process documentation for ISO 9000 certification.