-
General Electric
- Offshore lifting engineering
Paris
2017 - maintenant
-
Technip Paris
- Installation Engineer
Paris
2012 - 2016
Areas of expertise:
- Installation procedure development
- Logistic on mobilisation quay
- Lifting process
- Definition of requirements as per international standards
- Interface with client and supplier
- Technical advisor on installation aids and structure for construction vessel
- Follow up new vessel construction and pipelay system up to vessel delivery
- System integration testing
- Offshore operation in Congo & Angola
Projects:
Moho - Client: Total
Skandi Africa – New Technip Construction Vessel
Block 15 Project – Client: ENI
Prelude Project, FLNG – Client: Shell
-
Technip Oslo
- Logistic Marine Engineer
Paris
2011 - 2012
- Mobilization supervision for two construction vessels: Geoholm & Polar King in Norway north ports.
- Logistic at the mobilization base to supply equipments on construction and transport vessels.
- 3 months offshore as project engineer on the Geoholm, Polar King and North Sea Giant vessels.
Projects:
Goliat Project – Client: ENI
Njord & Visund, Riser Replacement – Client: Statoil
-
SAIPEM-SA
- Structure Engineer
Montigny-le-Bretonneux
2010 - 2011
Usan Project
Barge supply ships deck layout arrangement, lifting phase and rigging arrangement, for the Saipem 3000 construction vessel
Lashing analysis for rigid pipe installation procedure
-
Technip
- Trainee Structure Designer
Paris
2010 - 2010
Standardization of structural design for subsea modules devices
Deck layouts and seafastening activities on main construction vessel for the installation campaign of rigid lines.
-
Florida Institute of Technology & National Aeronautics and Space Administration
- Trainee Structure Designer
TREMBLAY EN FRANCE
2008 - 2009
Design of a refueling connection for the lunar vehicule, including all the lunar environment condition
Close collaboration with the NASA-Kennedy Space Center Publication
Publication of my results in the “International Review of Aerospace Engineering”.