Menu

Jean-Claude NASRI

TOULOUSE

En résumé

Skills & Knowledge


• …more than40 years work of different status and jobs
• … 15 years piping experience in construction site, refining/petrochemical, gas,
• …work on the different piping class material carbon steel, stainless steel, alloys steel(P11,P5)
• …Hastelloy ,Inconel, Titan, FRP,GRP (JACKETED PIPE)
• …Strong experience of pipe fitter, team leader prefabrication and erection at site, lifting, and coupling according usual safety rules
• Expatt local work…To teach and educated pipe fitter after preliminary evaluation of QC Iso
• …Revamping production Unit –exchanger, columns, reactors ,Heaters, Vessels, Tank, and mechanical rotating pumps
• prepare design from engineering iso to QC iso for cut out and fitting in order as per site condition
• Strong analytical, interpretive and multi-tasking skills with the ability to work independently and effectively with a team professionals.
• …strong organization and able to manage multi-disciplinary punch- list ,test, reinstatement
• …Preparation method progress follow-up team motivation
• …Material requisition to procurement
• …To close Systems as per PIDs – easiness with documentation equipment and instrumentation
• …All activities carried out with an importance to work safely and environmental control
• …Check and control method statement

professional experiences

08/2011 /now Piping SUPERINTENDENT Project KONIAMBO
NEW CALEDONIA / Extration mines / TECHNIP/


PONTICELLI /SAIPEM JOINT VENTURE OML58 0BAGI NIGERIA
19/09/2010 as now
Piping superintendent
All activities concerning piping in site flow station in according production responsible ( simops statut)


CTJV (CHIYODA & TECHNIP JOINT VENTURE-PROJECT QCS TRAIN 6 & 7 Ras Laffan QATAR
01/2009-06/2010
Lead piping supervisor


• …..Transfers from Gama prefabrication scope (done 660.000 dia inch) to site utility Area
• …..Daily resolutions of all construction related problems
• …..finalized test pack systems, supervise 130 workers, supervisors, foreman, fitter helper welder(from subcontract)
• …..ensure Daily meeting, Interfaced with representatives from others construction department
• …..Operational management, organized availability of resources and materials from design hand over
• ….Organize and Supervise connecting flare tie in QCS 6&7 to Qatar gas 3 as per respect of Safety & Planning ,for acceptance and closure by company at the right time
• Prepare piping and pipe support. material requisitions coordinate to procurement department for purchase or such materials in site
• Make close fire water underground and ground service water, drinking water of connection water storage tank , and Nitrogen
• ---Supervise and organize work of desalinated water FRP Pipe from tank to west area include connection pumps
• …..ensure all work was mechanically completed in accordance with drawing specification and procedures working closely with commissioning group –check/approve PTW


CTJV (CHIYODA & TECHNIP JOINT VENTURE-PROJECT QCS TRAIN 6 & 7 Ras Laffan QATAR
01/2007-01/2009
Lead piping supervisor/Prefabrication Responsible

• …..In charge of 3 piping workshops 9000 m2,yard 21hec capacity maximum 90.000 dia inch by month,1 piping support design fabrication 1800 m2 capacity 60 tones by month ,effective 1500 persons engineer ,supervisor ,Forman fitter welder ,helper 400 persons in the night shift
• …..result as 07/2008/ 550.000 dia-inch (SW) forecast 700.800dia-inch, 780 tones of support forecast 900 tones.
• …..Daily charges ensure safety Tools box in order ,operated by supervisor
• …..Daily meeting together construction support ,include QC department
• …..Check spool generator subcontractor for clarify problem design or material
• …..Coordinating With engineering department CTJV for queries raised in site
• …. Coordinating phase of project prefab with site area responsible ,anticipate problem of
Design
• Follow Daily progress FAB to manager construction

Mes compétences :
Génie mécanique
Management
Mécanique
Organisation
TUYAUTERIE
Project Management
human resources
disciplinary maintenance
comunication skills
Welding
Team Player
Steam Turbines
Siemens Hardware
Rotating Equipment
Procurement
Pipe Support
Mechanical experience
Construction site
Carbon steel

Entreprises

  • HATCH

    maintenant
  • OGAS Solutions - Superintendent / Generaliste

    2012 - 2015 Ameliorations Treminal Petrolier TOTAL / Revamping Terminal Storage
  • Ogas Solutions - General Superintendent

    2012 - 2015
  • TECHNIP - Piping Superintendent

    Paris 2011 - 2012 /TECHNIP/HATCH- project Koniambo Mining Construction Power Plan. ;
  • Technip / Hatch JVC - Superintendent Tuyauteries /meca

    2011 - 2012 En charge construction Erection Tuyauterie Power Station project Koniambo Mining Nouvelle-Caledonie
  • TECHNIP - Superintendent

    Paris 2010 - 2011 Piping / Mechanical - ALPHA for TOTAL ( NIGERIA) OML 58 Revamping reffining plan ;
  • Alpha maintenance -  Conducteur de travaux

    Rouen 2010 - 2011 Revamping raffinerie /OML 58 TOTAL- Nigeria
  • TECHNIP - Lead Supervisor

    Paris 2007 - 2010 / MPH for TECHNIP/ CHIOYDA - JVC ( QATAR-Raslafan) Construction Plan LNG (Liquefied gas) in charge Piping workshop préfabrication for process train 4 and 6 ( 9000m2 capacity 90000 dia inch welded by months 1 workshop piping support 1800 m2 capacity 60 T by month, éffective people 1500 persons 400 in night Shift (welder- Pipe fiter-team leader) yard storage 21.000 M2 ;
  • MPH/ Technip - Lead Supervisor/ prefabrication Tuyauterie

    2007 - 2010 En charge atelier Prefabrication Tuyauterie (90.000 dia inch soudure mois ) Support 60 T par mois
    Piping Prefab 90000 dia inch welded by months and 60 ton support
    Constuction Plan LNG for Qatar Gas /Ras Laffan (QATAR)
  • MPH - Superviseur Tuyauteries/Hydrotest/check list

    2005 - 2007 Contruction Projet DRC TOTAL Gonfreville -L'Orcher
  • TECHNIP - Charge construction

    Paris 2005 - 2007 Piping Superviseur MPH for TECHNIP Project DRC -TOTAL ( GONFREVILLE L'ORCHE ) In charge construction site ,cheking Punch list for closing by subcontrator.Test pack review for Hydrotest on acceptance client ;
  • SITUB Reffining - Pipe fitter

    2000 - 2000
  • Gasch GMBH - Team leader Tuyauteries Industrielles

    1999 - 2005 Divers Projets Construction neuves / Revamping / Arrêt programées
    Technip,BASF,TYSSEN Grup,SIEMENS,
  • TECHNIP - Team leader

    Paris 1999 - 2005 Piping for differents project TECHNIP,TYSSEN-KRUPP,SIEMENS,PONTICELLI VEBA-OIL ( located in French,Belgium,Germany,Nederland,Luxemburg) ;
  • SITUB Reffining - Pipe fitter

    1995 - 1998 for SITUB Reffining plan constructions LEUNA 2000 ( ELF) Germany ;
  • Venus - Agent Commercial

    1988 - 1995 Business Agent several project selling shelters for pools ;
  • VENUS - AGENT COMMERCIAL

    1987 - 1989 Vente abris de piscine,animation foires et salons FRANCE +
    SUISSE
  • POLICE NATIONALE - T!!!!!

    Paris 1982 - 1985 GIPN
  • Ministere de l interieur - APJ

    1976 - 1987 to much !!!!!!!!!!!!
  • Security Police officers - APJ

    1975 - 1988
  • French Navy - QM1 /Meca

    1972 - 1974 mechanical embarked service engines with 1 year last nuclear test outsite from Mururoa French Polynesie.

Formations

  • MARINE NATIONALE CIN ST MANDRIER (Toulon)

    Toulon 1970 - 1973 BEP
  • Lycée Lavoisier (Caussade)

    Caussade 1967 - 1969 Genie mecanique

    ajusteur

Réseau

Annuaire des membres :