  • Marine Intervention Team - SIMOPS Supervisor

    2013 - 2016
  • TOTAL ANGOLA FPSO GIRASSOL - SIMOPS Supervisor

    2012 - 2016 charge of all technical aspects of the Girassol Full Field Shut Down and Revamping Project, preparation of procedures for revamping of various parts of plant. Leak testing procedures, following register of lines to be replaced.
    * Préparateur Travaux, in charge of writting procedures and ``Mise a Disposition'' to be able to perform works in safe condition and with minimum production losses. ;
  • TOTAL ANGOLA - SIMOPS Coordinator

    2010 - 2012 TOTAL ANGOLA GAS EXPORT Project (Angola)

    on Pipeline project, supervision of Tie in operations, SIMOPS drilling/injection, gassing up of phase 2 pipeline to deliver gas to ANLNG plant. Technical and operational Interface with SONANGOL, SOMG, ANLNG involved in GEP.
    * Start Up Leader for TOTAL ANGOLA Gas Export Project, responsible of start up of a new gas injection platform on SONANGOL Block2. In charge of pre start up activities, leak tests, following of commissioning control of starting procedures and start up operations. ;
  • TOTAL KHARIR - Start Up Leader

    2010 - 2010 * Start Up Leader for TOTAL KHARIR Yemen , responsible of start up of a new gas compression and oil boosting extension on existing installation. In charge of pre start up activities, leak tests, following of commissioning and control of starting procedures. ;
  • YEMEN LNG - Start Up Shift Superintendent

    2009 - 2010 * Start Up Shift Superintendant Train 2 for YEMEN LNG, in charge of pre-start up and start up activities on warm and cold end of train 2 capacity 420 T/h LNG production. Witnessing of cold and warm end N2/He leak test. Start up of warm end and fine tuning. ;
  • TOTAL INDONESIE - Start Up Leader

    2008 - 2009 TOTAL TUNU 11S Project (
    for TOTAL Tunu 11 South, responsible of start up of 3 new platforms (Manifold, Utilities and Gas Compression). 2 Turbo compressors Nuovo Pignone 305 MMSCFD each at 34 barg. Start up, tuning of plant, Operational tests, Site acceptance tests for rotating equipments and Plant Performance tests. Leading a team (20 people) of production and maintenance supervisors and operators. Involved in writing and approval of Operguide® procedures for new installation. ;
  • TOTAL IRAN - Production Superintendent & Plant Production Supervisor

    2004 - 2007 TOTAL DOROOD 3 Project (Iran)

    for TOTAL Dorood 3 project (Oil production 80.000 BOPD, water injection 250.000 BPD and gas injection 130 MMSCFD). Start up operations and performance tests. Training of Iranian personnel.
    * Start Up leader on Gas compression equipment (Sour gas HP compressor at 410barg) for TOTAL Dorood 3 project (Iran) Involved in commissioning and run tests. ;
  • TOTAL SOUTH PARS - Field production Supervisor

    2000 - 2003 * Field production Supervisor on Kish Island and Assaluyeh Site
    Involved in commissioning and start up operations of SPD3 and SPD4 with commissioning team and Iranian training team.
    OTP's of all platform equipments including Yokogawa DCS, testing satellite communication between offshore and onshore with Silvertec vendors.
    Testing of all automatic and shut down sequences
  • TOTAL SIRRI - Production Shift Supervisor

    1999 - 2000 * Start-Up Leader on production plant for TOTAL SIRRI - ETPM
    100 000 BOPD production with water treatment (electrochlorination, filtration, deaeration tower) and water injection (2 turbo pumps EGT WEIR).
    Start-up of new installations, following of OTP's and punch list items.

    * Production Shift Supervisor on production plant for TOTAL SIRRI
    100 000 BOPD production, with water treatment and injection
  • GEOSERVICES - Production Shift Supervisor

    Roissy en France 1981 - 1998 10 000 BOPD for ASTRA (Venezuela)