-
Naurex Westinhouse
- Superviseur électricité instrumen,tation
2018 - maintenant
-
IAMGOLD ESSAKANE SA
- Contremaitre Formateur
2016 - 2017
-
SPIE
- Pulling Supervisor
Cergy
2013 - maintenant
Oil & Gas supervision of the entire site cable Pulling, control, power, instrumentation, and
fire and gas detection. Management of a team of 3 to 8 foreman, 45 to120 cables pullers.
-Folders preparations.
-Forecasting and management of upcoming draws and supply cables and equipment.
-Daily-report of progress.
-State management of daily attendance of staff
-OML58-site to Obité Nigeria.
-Onshore-site.
-
SPIE
- Pulling Supervisor
Cergy
2013 - maintenant
Oil & Gas supervision of the entire site cable Pulling, control, power, instrumentation, and
fire and gas detection. Management of a team of 3 to 8 foreman, 45 to120 cables pullers.
-Folders preparations.
-Forecasting and management of upcoming draws and supply cables and equipment.
-Daily-report of progress.
-State management of daily attendance of staff
-OML58-site to Obité Nigeria.
-Onshore-site.
-
S.P.I.E
- Superviseur
2013 - 2015
-
SPIE
- Team Leader
Cergy
2012 - 2013
Pharmaceutical-industry
-Rehabilitation of the automation unit. "Sodium aluminate" control, measurement, power.
-Replacement of cable trays, draw new cables and connections on new equipment,
replacement of the controller and wiring.
-Synchronization testing and commissioning
SPIE-site Pharma Septemes les Vallons
-
SPIE
- Team Leader
Cergy
2012 - 2013
Pharmaceutical-industry
-Rehabilitation of the automation unit. "Sodium aluminate" control, measurement, power.
-Replacement of cable trays, draw new cables and connections on new equipment,
replacement of the controller and wiring.
-Synchronization testing and commissioning
SPIE-site Pharma Septemes les Vallons
-
Clemessy
- Team Leader
Mulhouse
2011 - 2012
Repair of a hydrocracker site preparation trails devices instrumentation development
prevention plan oven.
-Coaching teams of locksmiths and electricians for removing old raceways refurbishing paths
replacement of all instrumentation and power cables.
-More troubleshooting various interventions.
- Synchronization testing and commissioning.
Ineos Lavera site at Martigues
-
Clemessy
- Team Leader
Mulhouse
2011 - 2012
Repair of a hydrocracker site preparation trails devices instrumentation development
prevention plan oven.
-Coaching teams of locksmiths and electricians for removing old raceways refurbishing paths
replacement of all instrumentation and power cables.
-More troubleshooting various interventions.
- Synchronization testing and commissioning.
Ineos Lavera site at Martigues
-
SPIE
- Supervisor
Cergy
2011 - 2011
Creation of a petrochemical unit
-supervision as a subcontractor locksmith companies, cable pulling
Site-Ineos Lavera in Martigues.
-
SPIE
- Supervisor
Cergy
2011 - 2011
Creation of a petrochemical unit
-supervision as a subcontractor locksmith companies, cable pulling
Site-Ineos Lavera in Martigues.
-
E.T.I/ CMC
- Site Manager
2009 - 2011
Conducting a series of hyperbaric diving underwater work.
-Study and starts the entire project for the electrical part.
-Current high, low-voltage, communications, video surveillance, regulation of gas and fluids.
-Testing and validation with the Office of D.N.V
-Testing and commissioning.
-Project video available on YouTube "SETIA SELAM".
-
E.T.I/ CMC
- Site Manager
2009 - 2011
Conducting a series of hyperbaric diving underwater work.
-Study and starts the entire project for the electrical part.
-Current high, low-voltage, communications, video surveillance, regulation of gas and fluids.
-Testing and validation with the Office of D.N.V
-Testing and commissioning.
-Project video available on YouTube "SETIA SELAM".
-
connectic service industrie
- Construction Manager
2008 - 2009
Connection of high-voltage and junction boxes (30kv) testing and commissioning cells.
-automation of a unit (food) testing and commissioning.
-Automation-generator sets (Caterpillar) for energy production of factory tests and
commissioning.
Various work-paths, on cabling installing equipment, connections, testing and
commissioning.
-
connectic service industrie
- Construction Manager
2008 - 2009
Connection of high-voltage and junction boxes (30kv) testing and commissioning cells.
-automation of a unit (food) testing and commissioning.
-Automation-generator sets (Caterpillar) for energy production of factory tests and
commissioning.
Various work-paths, on cabling installing equipment, connections, testing and
commissioning.
-
SNEF
- Team Leader
2007 - 2008
Team Leader Electrical Construction industry Sollac Fos sur mer.
-Agreement, various interventions.
-Rehabilitation of blast furnace HF1 draws cables installation and connection devices.
-Reconstruction of continuous casting line 3 and 4 cable pulling, installation and equipment
connections, commissioning and testing.
Company Snef sud est.
-
SNEF
- Team Leader
2007 - 2008
Team Leader Electrical Construction industry Sollac Fos sur mer.
-Agreement, various interventions.
-Rehabilitation of blast furnace HF1 draws cables installation and connection devices.
-Reconstruction of continuous casting line 3 and 4 cable pulling, installation and equipment
connections, commissioning and testing.
Company Snef sud est.
-
Eurocopter
- Electrician
2006 - 2006
Automation of high-voltage cells.
-Eurelec compagny
-
Eurocopter
- Electrician
2006 - 2006
Automation of high-voltage cells.
-Eurelec compagny
-
forclum
- Chief engineer electrical
2006 - 2006
Chief engineer electrical construction industry Naphtha chemical
Wash
-New work new unit.
-Supervision of site installation of cable trays, the draw high current low voltage cables, the
introduction of automation and control unit on their connections and electrical equipment
room.
-commissioning and testing.
Company FORCLUM
-
forclum
- Chief engineer electrical
2006 - 2006
Chief engineer electrical construction industry Naphtha chemical
Wash
-New work new unit.
-Supervision of site installation of cable trays, the draw high current low voltage cables, the
introduction of automation and control unit on their connections and electrical equipment
room.
-commissioning and testing.
Company FORCLUM
-
Cofely Ineo - Groupe GDF SUEZ
- Team Leader electrician
2005 - 2006
Team Leader electrician industry ORTEC site at Berre.
Works-new, high-current, low current control measure.
-Supervision teams locksmiths for installing cable trays.
-Supervision of companies pulling cables.
-Installation of devices and connections.
-Commissioning and testing.
Company Ineo
-
Cofely Ineo - Groupe GDF SUEZ
- Team Leader electrician
2005 - 2006
Team Leader electrician industry ORTEC site at Berre.
Works-new, high-current, low current control measure.
-Supervision teams locksmiths for installing cable trays.
-Supervision of companies pulling cables.
-Installation of devices and connections.
-Commissioning and testing.
Company Ineo
-
Cegelec
- Team Leader
Saint-Denis
2000 - 2005
Team Leader electrical construction industry Sollac Fos sur mer.
Works-new automatic repair of machines park preparation charges sector.
-Implementation of PLC cabinets prints cables and connections.
-Replace old control chassis.
-Commissioning and testing.
-Maintenance all types of electrical interventions and repairs petrochemical and steel
Company Cegelec
From 03/99 at 09/99 Electrician industry.
-Wiring workshop machinery for the plastics industry.
-Company Equiptec
-
Cegelec
- Team Leader
Saint-Denis
2000 - 2005
Team Leader electrical construction industry Sollac Fos sur mer.
Works-new automatic repair of machines park preparation charges sector.
-Implementation of PLC cabinets prints cables and connections.
-Replace old control chassis.
-Commissioning and testing.
-Maintenance all types of electrical interventions and repairs petrochemical and steel
Company Cegelec
From 03/99 at 09/99 Electrician industry.
-Wiring workshop machinery for the plastics industry.
-Company Equiptec
-
creation electrique provencale
- Industrial Electrician
1994 - 1999
Computer Network draws high current cables, low voltage and connections.
-setting up servers and connection.
-Test and validation of the network.
-Installation of air conditioning and commissioning.
-Installation of inverters and commissioning.
Company creation Electrique
Provençale.
-
creation electrique provencale
- Industrial Electrician
1994 - 1999
Computer Network draws high current cables, low voltage and connections.
-setting up servers and connection.
-Test and validation of the network.
-Installation of air conditioning and commissioning.
-Installation of inverters and commissioning.
Company creation Electrique
Provençale.
-
autobazar
- Electrician
1992 - 1993
High fidelity installation luxury vehicle
Company AUTO BAZAR
-
autobazar
- Electrician
1992 - 1993
High fidelity installation luxury vehicle
Company AUTO BAZAR
-
Point Air
- Electrician
1986 - 1992
Maintenance and electrical Troubleshooting Boeing 707 and mc Donnell Douglas D.C8.
Company Point Air
-
Point Air
- Electrician
1986 - 1992
Maintenance and electrical Troubleshooting Boeing 707 and mc Donnell Douglas D.C8.
Company Point Air
-
Paratrooper Military Service
- Sergeant
1986 - 1987
-
Paratrooper Military Service
- Sergeant
1986 - 1987