Menu

Jean-Yves VIGNE

COURBEVOIE

En résumé

Senior piping designer, especially experienced in heavy powerful gas & steam turbine plants piping design and design co-ordination.
Conversant with the C.A.D. software Intergraph PDS / PDMS / E3D / Microstation & Smart plant.
Others professional software used: Autocad 2D, Word, Excel, Outlook, Lotus notes, Navis work, Acrobat PDF and various management interfaces.

Mes compétences :
PDMS
E3D
Navisworks
PDS
Smart plant
Microstation
Pipeline Design
Steam Turbines
ventilation design
Nuclear Plant
Power Stations
Gas Turbines
Mechanical draft design
Special Purpose Machinery
Petrochemicals
Assembly Plants
Autocad
3D
2D
Enfin
Lotus Notes/Domino
Microsoft Excel
Microsoft Outlook
Microsoft Word

Entreprises

  • Engie - Piping designer

    COURBEVOIE 2017 - maintenant I am currently working on the new prototype of the nuclear plan ITER designing HVAC (heating ventilation & air conditioning) ducts, pipes & supports.
  • Engie Axima - Dessinateur projeteur

    courbevoie 2017 - maintenant Piping & ventilation design
  • General Electric - Senior piping designer

    Paris 2012 - 2017 I have worked at Kusile power plant in South Africa for 4 years.
    My responsibilities were the following:
    To finalize small bore piping design & changes and create 3D models of equipment, supports and structures when necessary.
    To answer technical queries which basically means to resolve clashes and then create field site instructions to finalize or correct the initial design.
    To compile bill of quantities of the new material requested through the field site instructions.
    Frequently to do visits on site for checking or survey of clashes and red-correx documents.
    Most of these tasks were liaised with the engineering department.

    Then at Medupi power plant in South Africa until May 2017.
    My duties were:
    To close and create field site instructions before commissioning of the plant.
    To red mark the documents to be updated by the engineering for final submission.
    To follow up the progress of the final as-built documents which had to be transmitted to our client.
    To write the bill of material to be ordered to complete erection of the plant.
  • General Electric - Senior piping designer

    Paris 2012 - 2017 Piping design in heavy powerful steam turbine plants
  • Air Liquide - Piping designer

    Paris 2011 - 2011
  • Air liquide - Piping designer

    Paris 2011 - 2011
  • Technip - Piping dsigner

    Paris 2009 - 2010
  • Alstom Power - Piping designer

    Levallois-Perret Cedex 2008 - 2011
  • Technip - Piping designer

    Paris 2006 - 2007
  • Alstom Power - Employé

    Levallois-Perret Cedex 2002 - 2012 Various site experiences

Formations

  • AFPA BELFORT

    Belfort 1985 - 1985 Dessinateur d'études en Mécanique générale

Réseau

Annuaire des membres :