QA/QC inspector for TOTAL Moho Nord
- QA/QC inspector
2015 - 2015
Following weldin, pressure test, coating, expediting UFR
-
APAVE Inspection Interservice for TOTAL Moho Nord - Cuxhaven - Germany
- QA/QC Inspector
2015 - 2015
• Monitoring welding on HULL TENDON PIPE
• Dimensional control, coating
• Monitoring welding & assembly cassette (shipping skid dedicate of segment pipe, 80 mts length)
-
APAVE Inspection Interservice for TOTAL - Luanda, ANG
- QC Inspector - CLOV Project
2012 - 2014
Assembly of Xmas Trees
Testing of Xmas Trees
Mechanical completion
MRB compilation
Preparation of equipment for offshore deployment
Tools maintenance
Spare parts stock maintenance
Equipment procedure
-
TISSOT
- Construction Supervisor
Cahors
2011 - 2011
Inspection of the welded structure on the liner of the EPR,
Flamanville nuclear plant (FRANCE).
Recording and reporting of VT, QC departement.
-
TOTAL
- QC Inspector
COURBEVOIE
2011 - maintenant
CLOV Project - SPS package in Norway
FAT manifold - Presure test
Following duplex production test for manifold.
QA/QC prefabrication on manifold
FAT mudmat hatch, PGB, prefab items, cradle.
Shear joint.
Inspection and final inspection before shiping.
Review documentations, MRB (ITP, SMDR, REPORTS, ......)
Review documentations and comments on PRODOM system.
-
ECM-EXPORT for TOTAL
- NDE Supervisor
2009 - 2010
Project: PAZFLOR – Lobito SONAMET Yard, ANGOLA
Supervise NDT activity for 4 packages (Buoy, manifolds, SURF, helideck, boat landing, riser protector, mooring protector, suction piles)
Ensure the quality of work for all contractors
-
ECM-EXPORT for TOTAL
- NDT/Welding coordinator
2008 - 2008
Project: Djeno terminal in Pointe Noire, Congo
• Supervise the pipe rack structure prefabrication in Jarnac (FRANCE)
• Supervise NDT and welding, qualification of welders
• Ensure the welding and HSE quality in the work shop
• Coordination with Total Pointe Noire office for technical queries
• Daily reports (progress, etc.)
-
ECM-EXPORT for ACERGY
- Welding Supervisor
2007 - 2008
Port Gentil, Gabon
Project: Tombua Landana Chevron Project
• Welding qualification of welders on 14” and 18” pipeline
• Supervision of welding production and quality
-
ECM-EXPORT for TOTAL
- NDT Welding Supervisor
2006 - 2007
Project: Girassol Rosa Hook-up - ANGOLA
• Supervision of contractor for all welding activities before and during 45 days of shut-down
• Rewiev of documents ITP (Total Specification GS PW,STR, ASME code)
• Ensure welding quality, progress
• Reply to site queries, NCR, HSE, etc.
• Preparation installation of seven modules (reinforcement structure, guides, Tie-in)
• Supervision of all NDT and Welding activities performed by the Hook-Up Contractor regarding Structural & Piping, including certification file, pre-commissioning (as required), punch list, progress measurement and reporting
-
ECM-EXPORT for TECHNIP
- Welding Supervisor
2005 - 2005
Project: Total Amenam AMP 1, Phase II - NIGERIA
• Installation of compression module
• Supervision of all welding activities on piping and structures before and during shut-down (quality, progress, etc.)
• Responsible for 13 Nigerian welders
• Co-operation with QC department
-
ECM-EXPORT for SAIBOS
- Superintendent
2004 - 2004
Project: Total – Amenam AMP1 revamping - NIGERIA
• Supervision of night shift activity (scaffolders, riggers, fitters, welders, passivation)
• Pre-fabrication and erection additional support GRE pipe fire line
• Responsible for 20 workers
-
ECM-EXPORT for STOLT OFFSHORE
- Welding Supervisor
2004 - 2004
Project: Sanha Offshore Hook-up - CABINDA (ANGOLA)
• Supervision of all welding activities on piping and structures before and during shut-down (quality, progress, etc.)
• Responsible for 11 Indian welders
• Co-operation with QC department
-
DOM EXPAT for SAIBOS
- Welding Supervisor
2003 - 2003
Project: Total Fina Elf – Amenam AMP1 hook-up project offshore - NIGERIA
• Supervision of welding activity
• Supervision of duplex, carbon welding
• Working with Q C department
• Responsible of 40 welders and 4 welder foremen
-
TEREM INTERNATIONAL for CEGELEC
- Welding Instructor
2002 - 2002
Project: Chad-Cameroon pipeline Esso project - N'DJAMENA - TCHAD
• Instruction of welder trainer and Chadian welders
• Instruction in welding structure and piping
• Opening of 2 welding schools in N’djamena
• Request for material
• Supervisor of welding training
• Quality Control, validation of trainees