Civil Engineer with over 13 years in oil/gas, other field industry and infrastructure experience in: Project management, QC management according to British standards, Tunisian standards, European standards and API. Knowledge and practice of the following standard:
- ISO9001 version 2008
- ISO14001 version 2004
- OHSAS 18001 version 2007
- HSE standards

Entreprises

  • ABB - Civil/Structure QA/QC Inspector

    Cergy 2015 - maintenant
  • Bureau Veritas Dubai - QA/QC civil/structural Inspector

    2012 - 2015 Client: LUKOIL Middle East Limited
    Projects: West Qurna Field (2nd Phase) (Construction of Facility Production and Tuba Tank Farm Extension)
    Location: Basra, Iraq

    - Monitors the day to day activities of the Contractor
    - Works with the Civil Lead to ensure that there is proper Facilities and Civil Inspector coverage in the field
    - Ensure that all civil work is performed in accordance with the scope of work, the Specifications, the approved plans and procedures and the Approved for Construction drawings.
    - Monitor that all facility / civil quality inspection activities are in accordance with the Project Quality Plan and Company and Contractor QA / QC procedures.
    - Keep the Site Quality Coordinator and the Construction Superintendent updated of the status of facility / civil related quality issues.
    - Ensure that assigned facilities and civil works and surveillance are performed in accordance with the Inspection & Test Plans.
    - Perform QC of all daily facility / civil works reports and inspection records.
  • British Gas Tunisia - Civil Engineer

    2009 - 2012 - Site inspection (Structural and civil)
    - Work down
    - Punch list clarification
    - Ensure all works are doing in accordance with drawings and specifications
  • PIONEER Natural Resources Tunisia LTD - Civil works supervisor

    2008 - 2009 ? Confirm foundation is constructed in accordance engineering design and drawings.
    ? Confirm that all concrete strength tests are performed according to the requirements of ACI318
    ? Confirm that proper concrete sampling techniques are used
    ? Confirm that concrete materials conform to the requirements of ACI318
  • Snamprogetti s.p.a - Quality control Civil and coating Works

    2007 - 2007 - Confirm all civil and coating works are do it in accordance with drawings and specifications.
    - Control all the documents prepared by subcontractor’s QC in according with our QCP.
  • SOTECA - Chef de projet

    2005 - 2007 - Installation et réparation des stations de pompage des eaux (génie civil et hydromécanique)
    - Préparation des dossiers d’appel d’offres
  • SETRAV - Chef de projet

    2005 - 2005 - Construction des sites de pylône pour le compte de TUNISIANA
  • SOLTECH - Responsable du département environnement

    2003 - 2005 - Etude et conception des stations de traitement des eaux usées industrielles et buanderies
    - Installation des stations de traitement des eaux usées
  • Entreprise Châabane & Compagnies - Stage d’initiation à la vie professionnelle

    2002 - 2003 - Travaux de génie civil pour la construction d’un périmètre irrigué
    - Travaux de génie civil pour la construction de la station de traitement des déchets solides domestiques et assimilés de Sfax

Formations

  • ESIER (Béja)

    Béja 1999 - 2002 Hydraulique et Aménagement

Réseau

Annuaire des membres :