Have experience in pre-commissioning, commissioning and construction of oil and gas industries .solving technical issues and capability to deliver result .installation, calibration, inspection of all field instruments, excellent organization and administrative skill. Have flexible and positive approach to work, good cooperation with people

Mes compétences :
insulation testing
installation
Transformers
Shutdown instrumentation task scheduling
Quality Assurance
Microsoft Windows 9x
Installation and Commissioning
Fire & Gas
Development of the maintenance and intervention pr
Circuit Breakers
Calibration

Entreprises

  • Petrofac International Ltd. - QC Electrical instrument Engineer

    Jersey 2014 - maintenant * central processing facility JV GAS
    Inamenastiguentourine
  • Petrofac International Ltd. - Instrument supervisor

    Jersey 2011 - 2013 Project: central processing facility El-merk, lot1&7 Responsibilities:
    * Installation of Cable Trays/ Ladders, Instrument Stanchions and JBs & Panels frames.
    * Installation of instruments such as control valves, ESD valves, Transmitters, RTD's, Thermocouples, Indicators and gauges, marshaling cabinets, Control panels and patch panel & JBs etc.
    * Preparing As built drawings and Reviewing Dossiers prior walk down for Mechanical Completions.
    * Supervising and conducting Insulation Resistance and continuity Test of Cables on Drums as well as cables post installation.
    * Complete and report PMS to planning department. ;
    * To check the RFI of the Contractor as per the ITP of the Client. ;
    * Monitor the Construction Activities.
    * Review the Drawing and Documents etc. ;
    * Solving technical issues, raising RFIs, clearing punch lists, and closing ITRs.
    * Preparing schedule for ahead and distributing to Sub contractors on the basis of milestones / priority for completing the works in different areas.
    * Reviewing Layout drawings, Hook-up drawings, Interconnection diagrams and Instrument Installation drawing as per Specification and project requirements
    * Loop check [ESD.FGP.CMS] WITH DSC.
  • Petrofac International Ltd. - Instrument supervisor

    Jersey 2009 - 2010 Responsibilities:

    * Installation of all types of instruments and F&G detectors, junction boxes.
    * Inspection of Lighting circuit, installation Cathode protection, cable trays installation, cable pulling, installation of electrical earthing.
    * continuity and insulation testing of instrument ;
    * Complete PMS and report to planning department. ;
    * Prepare ITR's and clear punch list.
    * Check the RFI as per the ITP.
    * Prepare schedule of all activities. ;
    * Installation and Commissioning of fire and gas system.
  • Italy Company - Electrical& instrument engineer

    2009 - 2009
  • Algeria Company - Management

    2007 - 2009 * Maintanace of all motor and electrical equipment ,

Formations

  • University De Jijel (Jijel)

    Jijel 2001 - 2007 Electrical Engineer

    Electrical Engineer (Electrical control), 2007, [05years degree], University of Jijel, Algeria