manage all the civil activities
contract supervision and administration
Team Management
Supermarkets
On Field Construction Management
HQSE coordination
Earthworks
Construction site

Entreprises

  • HATCH

    maintenant
  • Koniambo Nickel - TECHNIP-HATCH JV

    maintenant
  • Hatch - Projet Koniambo - (Vavouto Nouvelle Caledonie)

    maintenant
  • VALOREM ENERGIES - Earthworks and Civil Superintendent

    2015 - maintenant VALOREM ENERGIES. August 2015 to the date (5 months). La Luzette wind farm & Montjean Theil Rabier wind farm-
    In charge to manage all the civil and earthworks activities on wind farm projects. These include high specifications footings, drainages and acceses roads . In charge to lead all the contractors in accordance with the schedule and customer procedures. In charge to check on a daily basis contractor's work quality and safety. Maintain good relationshionship with locals autorities and farmers.
  • Pan African Minerals - Earthworks and Civil Superintendent

    2014 - 2015 Pan African Minerals. September 2014 to March 2015 ( 6 months). Tambao mine project -
    In Charge to manage all the civil activities on 3 By-passes construction (34 km), to complete the access road to the mine. These include severals culverts, bridges and drainages to be build according high specifications and a tight schedule. Completed daily and monthly status reports, interface between the contractors and the others stakeholders. In charge to improve contractors safety policy (zero accident).

    Site Manager - Vestas Wind Turbines. May 2014 to September (4 months). Parc des Perrières Project - France
    In charge to manage all the mechanical and electrical activities on a 12 wind turbines construction site. Checked with the different stakeholders the use of proper material in accordance with technical work description, drawings and codes and rules. In charged to verified that contractors work in a safe manner and according project safety plan and procedures. Checked subcontractor's progress and lead them in the way to complete the goals according the schedule.
  • SNC-Lavalin - Civil Superintendent

    MONTREAL OUEST 2012 - 2013 (1 year 9 months). MEA/DAOUI Project - Morocco
    Monitored and checked civil and structural steel contractor's works for DAOUI site. Checked with the different stakeholders the use of proper material in accordance with technical work description, drawings and codes and rules. In charged to verified that contractors work in a safe manner and according project safety plan and procedures. Assisted weekly safety walks to verify the area housekeeping and safety. Assisted that work permits are obtained before start job on site and ensure compliance to permit conditions. Reported and maintained close liaison with other discipline supervisors working in the area and construction manager in order to prevent all clashes or work in the area. Checked Contractor's progress of work and transmit relevant data to Project Control Coordinator using tools as the daily report, quantity table and primavera schedules. Verify and discuss with Construction Manager and Engineering modifications required. Reviewed engineering design packages for constructability issues. Recorded modifications and extra works for further approval by Construction Manager, before the execution of the work itself. Ensured in advance that no hold up of Contractor work can occur due to lack of needed engineering documents and materials, or work area accessibility. This to avoid Contractor claims (jointly with Project Control and Field Engineer). Checked calculations of quantities based on field surveying and drawings for accounting unit rate costs. Prepared and issued to Contractor, and file Construction and Final Punch Lists, and follow up the completion of relevant outstanding works. Checked acceptance forms for performed work and state that work is in accordance with drawings/requisitions or reject the work with a precise description why.Collected and file all the relevant QC Forms, according to the Acceptance Procedure.
  • HATCH - CSA SUPERINTENDENT

    2011 - 2012 Koniambo Project - New Caledonia:
    In charge of all the civil work for the Utilities&common, Maintained project safety awareness and enforce company safety policy. Monitored contractor Quality Control Program. Facilitated coordination of contractor’s work with all others third parties. Reviewed and respond to contractors technical queries and coordinate with Engineering Department on technical issues. Supervised quantity reporting. Reviewed contractor’s monthly invoices. Prepared daily reports on each contractor. Evaluated construction material testing results. Participated in construction progress meetings. Participated in final inspection and prepare punch lists. Reviewed engineering design packages for constructability issues.
  • Hatch - CSA Superintendent

    2010 - 2012 In charge of civil works for the Utilities& common Area (Piperacks, Electricals Substations, tanks...). Monitored and checked civil and structural steel contractor's works for Area 500. Checked with the different stakeholders the use of proper material which must be in accordance with technical work description, drawings and applicable codes and rules. Checked that contractors work in a safe manner and according project safety plan and procedures. Assisted weekly safety walks to verify the area housekeeping and safety. Assisted that work permits are obtained before start and ensure compliance to permit conditions. Reported and maintained close liaison with other discipline supervisors working in the area and construction manager in order to prevent all clashes or work in the area.Checked Contractor's progress of work and transmit relevant data to Project Control Coordinator using tools as the daily report, quantity table and primavera schedules. Verify and discuss with Construction Manager and Engineering modifications required. Reviewed engineering design packages for constructability issues. Recorded modifications and extra works for further approval by Construction Manager, before the execution of the work itself. Ensured in advance that no hold up of Contractor work can occur due to lack of needed engineering documents and materials, or work area accessibility. This to avoid Contractor claims (jointly with Project Control and Field Engineer). Checked calculations of quantities based on field surveying and drawings for accounting unit rate costs. Prepared and issued to Contractor, and file Construction and Final Punch Lists, and follow up the completion of relevant outstanding works. Checked acceptance forms for performed work and state that work is in accordance with drawings/requisitions or reject the work with a precise description why.Collected and file all the relevant QC Forms, according to the Acceptance Procedure.
  • Work Supervison -IPE - Project manager

    2009 - 2010 for little projects as supermarkets in a local company, contract supervision and administration. Responsibilities include preparation of contract, extra work definition, basic estimation, negotiations, daily coordination, planning and technical issue with contractors.
  • SNC LAVALIN - CIVIL SUPERVISOR

    Ivry-sur-Seine 2007 - 2008 Cobre Las Cruces Project - Sevilla, Spain:
    Ensured compliance with project safety processes, objectives, procedures and construction in accordance with approved plans. Monitored compliance with the contract schedule. Completed daily reports of the contractor’s operation on site. Completed monthly status reports, interface between the contractors and the others stakeholders.
  • VEOLIA ENVIRONNEMENT - SAFETY SUPERVISOR

    Paris 2006 - 2007 Prociner Plant - Bordeaux, France:
    Safety coordinator at a plant construction site, Civil & Structural Jobs Supervision, HQSE coordination, daily field work coordination and planning, field inspection to ensure the work complies with project specifications. Heavy involvement in on-site technical issues and safety (zero accident). Ensured compliance with project safety processes, objectives, procedures and construction in accordance with approved plans. Monitored compliance with the contract schedule. Completed daily reports of the contractor’s operation on site. Completed monthly status reports, interface between the contractors and the others stakeholders.
  • Team Leader - Management

    2005 - 2006 on site of a workers team. Main activities: leadership, daily report, worksite organization, pouring of large quantities of concrete, safety of workers.