GE Energy
- Control Technical Assistance
BELFORT CEDEX
2013 - maintenant
Onbehalf GE:installation, comm and precommissioning of gas turbine LM2500°Gen VI Of GE,and performance testing for micronet+ from WOODWARD
hot loop check TCP,MCC,Fire&Gas and all systems before Start-up..
-
GE Energy
- Control Technical Advisor
BELFORT CEDEX
2012 - 2013
installation, commissioning and start-up of gas turbine.
Then, worked as GE representative and provide technical Assistance to The Customer and close the punch items.
-
GE combined cycle plant project ;ALGERIA
- GAS & STEAM turbine Commissioning instrumentations;PLC ;DCS & SCADA
2012 - 2012
Commissioning in project of combined cycle plant of KOUDIET
ED DRAOUCH; ALGERIA (3X400MW GE).
IN MISSION,i'm working under C.E.E.G the company of engineering of electricity and gas;on the project of the 3X400 MW combined cycle power plant installed in koudiet ED-DRAOUCH EL-TAREF in ALGERIA.
-
ABENER; ABENGOA
- TECHNICIAN I&C
2011 - 2012
maintenance of instruments of integrated solar combined cycle
(Tow SIEMENS GT8OO and SIEMENS ST900 and TELVENT solar field)
-
Annaba power plant (SONELGAZ)
- Gas turbine commissioning
2009 - 2010
commissioning of BOP equipments from Generale Electric at ANNABA power Plant; ALGERIA
the project of tow gas turbine 6B type GE and the BOP
(e.g.: CEMS the fume analyzer.).
-
ADRAR power plant (SONELGAZ)
- Start-up of Gas turbine
2007 - 2007
Inspect and calibrate the instrumentations on ALSTOM
GT35c at ADRAR Power stations (in south of ALGERIA).
-
TAMANRASSET power plant (SONELGAZ)
- Start-up of gas turbine
2006 - 2006
Inspections and calibrations of instrumentations
ALSTOM gas turbine type GT35b at TAMANRASSET Power stations (in south of ALGERIA).
-
TAMANRASSET power plant (SONELGAZ)
- Start-up of gas turbine
2004 - 2005
Hands-on Training on ALSTOM gas turbine type GT35a with SIEMENS field service engineer; in ANNABA power station before transfer it to south algeria TAMMANRASSET Power plant and ADRAR.
-
ANNABA power plant (SONELGAZ)
- Technician instrumentations
1999 - 2011
since 1999 check and fixe the instruments of steam turbine power plant of ANNABA
2004–Complete check of Steam Turbine 75MW ANSALDO;
Installation of new indications loop for pressure,flow and level,
with ABB transmitters.
2002–Complete check of Steam Turbine 55MW TPE russian;
Installation of new indications loop for pressure,flow and level,
with ABB transmitters,
installation of alarm system controlled by PLC SIEMENS(step 7) with Siemens technician.