Mes compétences :
Calibration
processing maintenance
Quality Control
past experience
mechanical maintenance
continuity testing
VMS
PLC Training
P&ID
Good Communication skills
Fire & Gas
Damages
Entreprises
Petrofac International U.A.E LLC
- Instrument Engineer
2012 - maintenant
Petrofac International U.A.E LLC
- Instrument Engineer
2012 - maintenantFor In-Salah-Gas, Southern Field Development Project,
Project:
* In Salah Gas Southern Fields Development Project. Job includes a new central production and gas gathering facility at In Salah comprising two dehydration trains, with the capacity to produce approximately 16.8 million cum of gas per day, associated permanent camps, and a 300km of pipelines for gas collection from the in-field wells and export to the existing Krechba facility. Insalah Gas is an association between Sonatrach, BP and Statoil.
* Project Value: USD 1.17Bn.
Task:
Preparation and done of pre-shutdown and shutdown activities.
Instruments Calibration.
Instrument & Electrical Supports Erection.
Cables tray installation.
Instruments installation.
Tubing installation.
Junction boxes installation.
Main and branch cable pulling.
Instrumentation Panels Installation (Marshaling, Flow, F&G Cabinets, DCS...ect).
Electrical instrumentation wiring installation.
LV cables IR test.
Instrument functional loop check.
Instrument final functional loop check.
Telecommunication systems Installation (PAGA & CCTV and Telephone System...ect).
Fiber Optic Cables Splicing.
Fiber Optic Cable Test.
Fire & gas Detection system Installation and tested (DFI, DGC, DAM, DHC, VESDA...ECT).
Lighting Installation (Lighting Fixture, Flood Lighting, and Lighting Pole Installation).
DODSAL
- QC Inspector
2011 - 2012within an Indian company DODSAL subcontractor KBR for New Train GNL2K Project
for Instrumentation and Telecom
Project:
* New LNG Project of 4.5MMTPA under KBR (Kellogg Brown & Root International Inc.) for Sonatrach- Algeria. This MEI Construction Job involves 134000 inch dia Field piping and 14900 MT of Equipment to be executed in duration of 28 months.
Project Value: USD 251 Mn.
* Task:
Preparation of inspection test plan (ITP) and quality control plan (QCP).
Inspection of Instrumentation activities:
* Instruments calibration (transmitter, control valve, switches, gages...). ;
* Electrical instrumentation wiring installation. ;
* Junction box installation and LV cables IR test. ;
* Cable termination inspection as per drawing detail. ;
* Instrument air installation.
* Instrument installation record.
* Instrument functional loop check.
* Instrument final functional loop check.
Coordination with construction/ KBR for inspection activities.
Reporting of electrical/instrument damages found in site to manager for further action.
Preparation of inspection result.
Preparation of electrical/instrumentation packages.
COJAAL
- Electronic Engineer
2009 - 2011within Japanese company COJAAL (TUNNEL SECTION). ;
Private company EEIB
- Instrumentation Engineer
2008 - 2009: within private company EEIB (Subcontractor) with Belgium company FABRICOM- GTI in
Project:
* Maintenance of Gas Compressor Station (Renovation) - HASSI DELAA- Laghouat - Algeria. ;
* Task:
Assembly and disassembly of Instruments.
Instruments Calibration.
Electrical instrumentation wiring installation.
Junction box installation and LV cables IR test.
Instrument functional loop check.
Instrument final functional loop check.
* Since the 27/08/2007 until the 30/08/2008: Manager of (ZAHRA-SOFTWARE) for Maintenance and Sale Computer Equipments, Office automation, booksellers and stationer's.
Formations
STS Institute (Annaba)
Annaba2010 - 2010PLC Training (Step7 & HMI / Wincc)