Context:
Groupement Timimoun (GTIM) is preparing the development of the Timimoun gas fields, in South Western Algeria.
Timimoun field has an extension of 13250 km . It is located at Algeria's South West, 120 km to the West from In Salah
gas fields and at 100 km east from the route that links Timimoun to Tiberrhamine and Oufrane palm groves and to Sbaa
and Adrar village. The entire field is located in a desert area. The development will include a 5 MSm /d (raw gas) gas
processing treatment plant located in the CPF (Central Processing Facility). A dew point unit will be included in order to
reach the gas export specifications. This plant will be fed by 14 gas producing wells that will be drilled before plant startup and 23 extra wells that will be drilled later.
Project: MIIE Timimoun Field Development Project
Client: Samsung Engineering Company, Ltd
Location: SPIE OIL & GAS SERVICES Regional Head office, Kuala Lumpur
Tasks:
* Manage and train five Inspection team members ;
* Manage and train Inspection team
* Be Responsible of Inspection issues ;
* Ensure coherence with inspection strategy ;
* Analyse and use project local legislation requirements on condition monitoring, inspections, and tests for MIIE
Project.
* Ensure the compiling asset registers with associated documentation.
* Give detailed inspection scope with individual qualitative and quantitative inspection points.
* Perform the Inspection strategy (Pressure systems, Lifting equipment, Structure, corrosion monitoring, pipelines
and risers)
* Perform the Inspection Plan preparation (Written Schemes of Examination)
* Perform the baseline inspection preparation dossiers (Piping, Pressure Vessels, Lifting, Structure, Corrosion
monitoring)
-
SPIE
- Inspection leader
Cergy
2014 - maintenant
Report of 3D review about maintanability and inspectability criteria
Updating templates about inspection and maintenance plans
Inspection strategy
Inspection philosophies on:
- Pressure systems Equipment
- Corrosion monitoring devices
- Handling equipment
- Structure (Offshore/onshore)
-
Altran France
- Consultant
Vélizy-Villacoublay
2014 - 2014
Mise à jour des templates excel afin d'intégrer les nouveaux équipements dans l'ERP SAP
Travaux d'inspection technique sur les cuvettes de rétention, dalles et caniveaux de l'usine de Mourenx et élaboration des fiches de surveillance
-
Altran
- Ingénieur consultant
Vélizy-Villacoublay
2013 - 2013
Coordination des travaux inspection lors des arrêts d'ARKEMA Lacq dans le cadre du projet Lacq Cluster Chimie 30
-
SPIE OGS ASIA PACIFIC KUALA LUMPUR
- INSPECTION ENGINEER
2013 - 2013
Context:
Total E & P Myanmar operates the Yadana Field located at the Andaman sea 60 km to nearest landfall in Myanmar.
The company has several existing platforms in the area, but to nature of land, the ground has subsides.
MSF platform and jacket. The MSF Platform will house 36 person and serve as the based of the LQ module from the
decommissioned QP Platform into new QP2 Platforms.Brownfield modification of 4 existing platforms.
Tasks:
Inspection and integrity activities located in Spie Oil & Gas Services in Kuala Lumpur Malaysia to perform the Inspection
Integrity Engineering of the new asset.
* Perform the WSE for Piping
* Perform the spading book ;
* Perform the SCE (Safety Critical Elements) identification and assessment into the database.
-
SPIE OGS ASIA PACIFIC KUALA LUMPUR
- INSPECTION TEAM LEADER
2013 - maintenant
Context:
MLS Gas Field upgrade Project for Total E&P Borneo BV consists in the construction of an a new 12-slot well head
platform MLJ3, 4 legs, rated for 15kpsi wells (HP/HT). The platform is normally unmanned located approximately 6km
south of the existing platform MLJ1 and MLJ2 and with a maximum throughput capacity of 6 MMSm3/d. The water depth
is around 63m
A multiphase in-field CRA pipeline (Duplex or Cladded) 18'' x 5.5km from MLJ3 subsea tied-in into the existing MLJ1-OPP
multiphase export pipeline
The replacement of approximately 6km of the existing 18‟‟ x 85 km multiphase pipeline including its riser at MLJ1 by CRA
pipeline (Duplex or Cladded)
The replacement of the riser and the installation of new boat landings on the existing platform MLJ1
The installation of new boat landings on the existing platform MLJ2.
Project: Maharaja Lela South Project (MLS)
Client: Total E&P Borneo B.V
Location: SPIE OIL & GAS SERVICES Regional Head office, Kuala Lumpur.
Tasks:
Verify performances and monitor the Inspection requirements for MLS Project.
* Manage and train five Inspection team members ;
* Be Responsible of Inspection issues ;
* Ensure coherence with inspection strategy ;
* Perform the Legislation analysis report ;
* Perform the Inspection strategy (Pressure systems, Lifting equipment, Structure, corrosion monitoring, pipelines
and risers)
* Perform the RBI study (Preparation, Data collection and Implementation in FAME+ RBI tool)
* Perform the Inspection Plan preparation (Written Schemes of Examination)
* Lead in CMIMS (UNISUP/SALSA) the inspection activities
* Perform the baseline inspection preparation dossiers (Piping, Pressure Vessels, Lifting, Structure, Corrosion
monitoring)
* Perform the Baseline in offshore platform during construction on yard
* Supervice the NDT technician for inspection activities
* Perform the Baseline of the jacket structure
Material used: Pack office, FAME+ RBI software
-
ARKEMA
- INSPECTION ENGINEER
Colombes
2011 - 2013
Context:
-
ARKEMA
- Ingénieur Inspection Technique
Colombes
2010 - 2013
Élaboration des plans d'inspection selon guide DT84
Recensement et traitement de données dû au plan de modernisation
Préparation des arrêts Lacq 2014
Mise à jour du système SAP
-
Responsable de la planification et l'organisation d'un évènement
- Stagiaire
2008 - 2009
Renault & Dassault Systèmes - Boulogne Billancourt (92) 2009
Assistant Technique 3 mois
Mission : Organisation du Concours Régional de modèles réduits de Formule 1
Planification de l’évènement
Prise de contact et diffusion de l’information auprès des médias
Réalisation des dossiers de presse
Membre des jurys
Saisie de données
-
VACHETTE
- Chargé de développement Packaging
2007 - 2007
Étude et proposition du conditionnement de serrures par 200 avec prise en compte des critères de coût, résistance, qualité, stocks et impact environnemental.