Menu

Mohamed KACI

ALGIERS

En résumé

My background includes over 13 years in project planning and scheduling in different fields as: Oil & Gas Offshore, Onshore,Shutdown, Drilling, Power, Energy, Uranium mining, Sea Water desalination, pump stations, Railways, infrastructure & Civil Construction.

In addition to the above, I can also offer an assistance and support to the project manager and coordination between different disciplines of the project.
I have a complete mastery of a planning and scheduling softwares : P6, P3, Ms project, and I recently completed a level course of project management.

Mes compétences :
PRIMAVERA
PLANNING
PLANIFICATION

Entreprises

  • TOTAL E&P NIGERIA LIMITED - Senior Shutdown Planner

    2013 - maintenant Onshore & Offshore Shutduwn Planning preparation (OML55, OML99, OFON.........)
    Location: Port Harcourt Nigeria
  • TOTAL (TEPA) ANGOLA - Sr Lead Planning Engineer (Integration planning Manager)

    2011 - 2012 Position: Integration Planning Manager
    Department: Bloc 17 Division (DB17/ADP) Planning & Development Dpt
    In charge of planning, integration & coordination of 3 FPSO (Girassol, Dalia, Pazlor) schedules (Subsea, SURF, Revamping, exploitation, production & new projects .....)
    + Drilling planner


     Location : Luanda (ANGOLA)
     Project Type: DEEP OFFSHORE
     Functions & responsibilities:

     In charge of Preparation and follow up of Bloc 17 Drilling sequence (by rig (6Rigs), by asset, long term sequence, …..) and manage interfaces between all divisions, mitigate shortfalls,
     In charge of Drilling sequence for the future Well of CLOV field
     Planning preparation & follow up for SURF, SPS installation (Xtree, jumpers, manifold, umbilical, flowline……)
     Planning coordination with Field support Vessel team.
     Planning coordination with Different brownfield projects (GirRI(PBF)
     Preparation of weekly coordination meeting & report
     Preparation of 5 weeks & 18 months integrated planning (Bloc17)
     Manage 18 month coordination meeting (monthly basis)
     Coordination and clash analysis between all discipline (Drilling, Geosciences, Geophysics, Exploitation, production, revamping & new project, Subsea, other blocs……….)
     Propose and approve different recovery plan
     Manage & monitor a planning Team (08 Planners).
  • Total TEPC Congo - Lead planning Engineer

    2010 - 2010 Assignment: Technical, revamping & new project Division

    In charge of planning, scheduling of a new project, maintenance project, revamping project of the overall oilfield platforms of TOTAL Congo (~ 30 platforms divided in 3 areas (North, south & Nkossa), 2 FPU (NKOSSA & ALIMA), 1 terminal site (Djeno).

    Project Location : Pointe Noire (Rép. CONGO)
    Project Type: Oil field OFFSHORE
    Functions & responsibilities:

    * Planning Preparation and follow up of a new platform (libondo) (deck-jacket platform) Eng, proc, hook up, integration & commissioning.
    * Planning preparation & follow up for the platforms revamping
    * Planning preparation & follow up for the wells revamping (eruptive, PCI, GL & WI)
    * Planning preparation & follow up for revamping of the existing FPU (NKOSSA & ALIMA)
    * Planning preparation & follow up of a different Platform Shutdowns for: (E&I revamping, Risers change & subsea cables, mechanical revampings……….. (Planning, POB, Logistic…)
    * planning preparation and follow up for a construction of new reservoir (tank) (terminal djeno)
    * POB (PAX) Management on the platforms and different flottels.
    * Coordination between platform site managers & project teams
    * Preparation, integration & follow up of periodic overall schedules (4weeks, 3months & 18months)
    * Preparation of a weekly and monthly division reports
    * Preparation of a periodic Budget & Cost forecast
    * Planning coordination & conflict identification with other divisions ( drilling and completion, geosciences, Maintenance, Logistic, …)
  • AREVA (Namibia) - Lead Planning Engineer

    2008 - 2010 Project assignment:
    Project : NAMIBIA TREKKOPJE Uranium Mine Project
    Construction of 2 uranium treatment plants (capacity of 3000t/y)+2 Heap Leach Pad; including the construction of all the facilities (Utilities) to supply water and power to the mine: Sea water Desalination plant with UF & RO Units (70000M3/d), 4 booster pump stations, 50km water pipeline, 2 reservoirs (50000m3), 4 Substations & 100km HT line (220&132Kv).

    Project Location : TREKKOPJE –SWAKOPMUND (NAMIBIA)
    Project Type: ENERGY(Uranium Ore treatment plant) & Water Desalination
    Project Cost: 1 B€
    Functions & responsibilities:

    * Preparation of planning Management & Progress measurement Procedures
    Preparation of EPC schedules & contractor planning monitoring.
    * Involved in negotiations with all contractors.
    * Contractor monitoring
    * Project reporting
    * coordination between different disciplines (Engineering, Construction, procurement)
    * preparation of risk register
    * Interface with cost controller: Preparation of monthly cost, invoicing, cost at completion, EVC Method.
    * Assistance for Construction Managers ( Utilities & Mine)
    * Preparation of monthly coordination meeting with the whole Contractors.
  • ABENER-ABENGOA - Lead Planning Engineer

    2008 - 2008 Project : Integrated Solar combined cycle plant (150 MW)Hassi R’Mel Algeria
    The Hassi R’Mel ISCC power plant is a solar-combined cycle hybrid installation that will Produce 150 MW, based on the synergies between a 25 MW solar collectors field and a 130MW classical 2x1 Combined Cycle Power Plant (CCPP).

    Client: SONATRACH/SONELGAZ/ABENGOA Solar
    Project Type: ENERGY/Power
    Project cost : 270 M€
    Functions & responsibilities:
    * Preparation of planning Management & Progress measurement Procedures
    * Preparation of EPC Plannings
    * Management of planning team (3 planners)
    * Preparation of work progress (Daily, weekly & monthly), different curves. (using EVM Methods)
    * Schedule monitoring for all discipline
    * coordination between different disciplines (Engineering, Construction, procurement)
  • ALSTOM Transport - Planning Manager

    2006 - 2008 Project : ALGIERS TRAMWAY
    Client : EMA/SYSTRA/RATPdev
    Work Location: Paris (St-Ouen) & Alger.
    Project Cost :350M€
    Project Type : RAILWAY& INFRASTRUCTURE
    Functions & responsibilities:
    * Preparation of schedules (Engineering, Construction, procurement, commissioning, Milestone, critical path, Resources, Training, WBS)
    * Preparation of Construction Railway schedules.
    * Preparation of Planning Management & Progress measurement Procedures
    * Management of planning team (6 planners)
    * Preparation of work progress (Daily, weekly & monthly), different curves (using EVM Methods).
    * Schedule monitoring for all discipline.
    * Propose different recovery plan
    * Preparation of projects activities reports (Daily, weekly & monthly), internal & client
    * Preparation of monthly cost, invoicing, forecast, Turnover
    * coordination between different disciplines (Engineering, Construction, procurement)
  • BROWN &ROOT-CONDOR (B&R-C) - Senior Planner

    2004 - 2006 Project : RUNITEL 1
    National Unified Telecommunications & information network of gendarmerie
    Client : National Military Department.
    Project cost: 200M€
    Project Type : INFRASTRUCTURE & TELECOMMUNICATION
    Functions & responsibilities:
    * Preparation of schedules (Different levels Schedule for Engineering, procurement & Construction)
    * Preparation of work progress (Daily, weekly & monthly), schedule monitoring for all discipline(using EVM, EVC Methods)
    * Preparation of projects activities reports (Daily, weekly & monthly), internal & client
    * Preparation of monthly cost, invoicing, forecast.
    * Preparation of risk registers.
    * Preparation of project variance notice (Change order)
    * Coordination between different discipline (Engineering, procurement & Construction)
    * Implementation of KBR procedures
  • JGC Corporation - Planning Engineer

    2002 - 2004 Projects:
    * BOOSTING Hassi R’mel Algeria :Construction of three gas compression stations (SBS, SBC & SBN). (18 Turbo compressors)
    * GAS TREATMENT PLANT of DJEBEL BISSA Hassi R’Mel Algeria: Construction of Gas treatment unit (1 train LNG plant)
    * CONDENSATE VALORIZATION PROJECT CIS Hassi Messaoud Algeria:
    Construction of condensate additional storage & export facility including 28 km pipeline.

    Functions & responsibilities:
    * Preparation of schedules (Master schedule and schedules for all construction sections)
    * Preparation of work progress (Daily, weekly & monthly) & schedule monitoring.
    * Preparation of monthly invoicing
    * Preparation of projects activities reports (weekly & monthly).
    * Coordination between different construction sections.
    * Propose Different Recovery Plan
    * Assistance for Construction & Site Managers
    * Preparation of billing quantities for all construction sections.
    * Good Exploitation of P&Id, PFD, Isometric & Piping Dwg………..
    * Implementation of JGC procedures
  • GENISIDER - Planning Engineer

    2000 - 2002 * Project : Algiers Subway.
    * Project Type : INFRASTRUCTURE
    * Functions & responsibilities:
    Assigned at planning & method section (Planner)
    Preparation of schedules & work progress.

Formations

  • Ecole National Des Travaux Publics (Alger)

    Alger 1992 - 1997 ouvrages d'arts

Réseau

Annuaire des membres :