- Discipline/ Coordinator Engineer for AUTOMATION SPECIAL SYSTEMS for Vaccines Building
Marly-le-Roi
2013 - maintenant
Automation & ELV work coordination for package SPECIAL SYSTEMS below with potential contractors :
o Management plan schedule
o Change Order Form management
o Construction (Walkdown & Mecanical Completion + TurnOver)
o Qualifaction IQ/OQ, commissionning & Start-Up
Contractor IMTECH:
• DATA NETWORK connection
• COPTICAL FIBER connection
• START UP COMM ROOM TR-B & TR-C
• CLOCK SYSTEM
• INTERCOM + WIFI Access Point
• TIME RECORDER
• LOOSE EQUIPMENTS
• TSAS : INTERLOCKING
• GAS EXTINCTION
Contractor BiiON:
• AMS : Alarm Monitoring System
• MPMS: Media Preparation Monitoring System
• PEMS Particle & Environmental Monitoring System
Contractor SIEMENS
• GAS DETECTION
• FIRE DETECTION
• BMS: Building Management System
Contractor TYCO :
• ACS : Access Control System
• CCTV: Closed-Circuit Television
Contractor Fabricom GDF SUEZ + Internal GSK:
• PDM : Process Data Management (Autoclaves /Washing Machine / UltraSonic Bain)
-
TRACTEBEL ENGINEERING GDF SUEZ– to STORENGY GDF SUEZ FRANCE
- Automation Engineer Starup Oil & Gas
2012 - 2013
« Pre-commissioning, commissioning and start-up row compressor station
gas of Saint-Illiers, FRANCE
Loop test of compressor station gas
- Loop test (with power) of I/O Analogs and AON (all or nothing) of gas Storage,
- Valves BIFFI and BERNARD functional tests,
- Gas detection & fire central MSA Gallet start-up,
- Station gas with security emergency shutdown device (ESD) start-up (APS HIMA),
- Transmitters start-up (Level, Temperature & Pressure).
- ModBus validation between machines and automatic compression
- functional testing of HVAC systems.
Compressor Functional Test,
- Dilution Sequence, Clean Up run, Filter Inspection,
- Start-up sequences, Validation Full Speed, Full-Load,
- 72 hours Running test.
Production manuals, wiring diagram training and updating,
- Security acknowledges operator manual procedures (Compressor, Station, Gas detection & fire central).
-
Industeel Belgium, ARCELOR MITTAL
- Management of Computer-Aided Maintenance Management and operation mode making up,
2011 - 2012
Automatism and Electronics,
- Automization (Rising barrier, Auto portal, Control station, etc.),
- Server maintenance and software,
- Access Control (Turnstile, KF 4000, movement detection, etc.),
- Automatic industrial shutter inspection,
- Intercom and lift maintenance.
Electricity and Ligthing,
- Hall and exterior ligthing maintenance,
- Outside hall electric interventions.
Industrial security,
- Extinguisher Tour and Important Elements For Security (IEFS),
- Fire detection follow-up,
- Move the tarpaulins and small posters security,
- Roof tour / Gutter / Ball / The life line.
Chemical & automatic control instruments,
- Chemical room test and pumps,
- Maintenance of sheet exchangers in the compressor room.
-
Fabricom - GDF-Suez
- Automation Engineer / SCADA
2011 - 2011
- Design and development of applications of industrial supervision Coke Arcelor Mittal Ougrée (Liège) :
Study, analysis and software development supervision (HMI),
- Bug follow-up and Wonderware supplier disfunction,
- Qualification test Realization of Factory Acceptance Test (FAT),
automation SCADA intouch Wonderware 10.1 / Intouch CE
- SCADA validation + Touch Screen Advantech,
- SCADA list reserve achievement,
SCHNEIDER PLC analysis and configuration,
- Premium PLC hardware configuration,
- Safety PLC hardware configuration and programming,
- Programming safety Ethernet communication exchange between APS and API SCHNEIDER (I/O Scanning).
-
IBA Technology Group, Brussels Belgium
- Automation Engineer
2010 - 2010
Develops PLC and markets leading edge technologies, pharmaceuticals and tailor-made solutions for healthcare with a focus on cancer diagnosis and therapy.
-
Dégremont SUEZ - FRANCE/ MATIS Benelux, QATAR
- Automation Engineer Supervisor/coordinator
2009 - 2010
The design-build contract and operate wastewater treatment and reuse plant of Doha West QATAR to Ashghal, PWA.
Sub-Contracter: Cimac - Schneider Electric
- Checking the validity of the functional analysis with P&ID,
- Realization of qualification tests of Factory Acceptance Testing (FAT) automation GE Fanuc & SIEMENS / SCADA Cimplicity,
- Realization of qualification tests of Site Acceptance Test (SAT) of PLC's, SCADA and the equipment for communication network, Switch D-Link, Serial to Fiber Optic Converter & Ethernet To Fiber Optic Converter,
- Mapping test of Data Exchange OPC Server, GENIbus & Modbus.
- Pre-commissioning and commissioning of station.
Used tools:
PLC's : SIEMENS (SIMATIC S7-300) & GE Fanuc (RX3I)
Supervision : Cimplicity 7.0
-
Fabricom GDF SUEZ Energy Services / ALTEN BENELUX
- Automation Engineer, Disturbed Control System (DCS)
2007 - 2009
Automatism:
- Harvest of the PLCs data,
- PLCs configuration,
- Honeywell Experion PKS system configuration,
- Test bench automatism of I/O Analogs and AON (all or nothing).
Supervision:
- Handling of the software of supervision ,
- Networks obligations alarms parameters.
Network :
- Converter Westermo configuration,
- Switch CISCO and router HP configuration.
Functional analysis:
- Technical exploitation manual editorial,
- Implementing new features and functionalities if necessary.
Others:
- Cold check loop (Without power)
- Loop test (with power)
- Counters Instromet MODEL 999-P configuration
- Pre-commissioning, commissioning and start-up gas
- Start-up of fire detectors Tyco « Fire & Integrated Solution,
- Security emergency shutdown device (ESD)
Used tools:
* PLC’s: HONEYWELL, Télémécanique TSX Micro & HMI Display
* Network: Converter Westermo, Switch CISCO 2950, Router hp 2626
* Instrumentation: Pocket HART 375, Instromet Counters 999-P
-
NEU Automation Institut technique Neu. ITN, Marcq-en-Baroeul - FRANCE
- Automation Engineer
2007 - 2007
Project 1: Renovation and Installation of a system of remote control supervision of the SIDEN régie du Syndicat Interdépartemental de Distribution d’Eau du Nord de FRANCE
- Configuration & supervision application development,
- Configuration & automation programming,
- Functional Analysis Writing,
- Test bench automatism of I/O Analogs and AON (all or nothing).
Project 2: Supervision and lighting management automation of Equipment Centralized Technical GTC of lighting management of Auchan shopping centre in Amiens, FRANCE
Project 3: Installation of lighting management of College ANNE Franck of Dunkerque
- Specification analysis and functional analysis survey,
- Cabinet and module electrical cabling,
- PLC configuration and programming,
- Synoptic creation and view animations,
- Drafting of user's manual,
- Test bench automatism of I/O Analogues and AON.
Used tools:
PLC’s : SOFREL, PERAX et SCHNEIDER
Supervision : TopKapi Vision32 and TAC VISTA
-
Arcelor MITTAL , «Tube Sans Soudure», Annaba- ALGERIE
- Automation Engineer
2006 - 2006
Project: Supervision development control fault diagnosis in (Weldless Tube)
Automatism:
• Automatism controls modification
• Test bench automatism of I/O Analogs and AON (all or nothing).
Supervision:
• Variables importation,
• Synoptic creation and views animations,
• Drafting of user's manual.
TECHNICAL ENVIRONMENT
- PLCs: SIEMENS
- Supervision: InTouch