Société tunisienne de l'électricité et du gaz
- Planning Manager
Tunis
2013 - maintenant
Power Plant combined Cycle of Sousse (Phase C) : 420 MW
The main tasks are as follows :
• Lead and develop an effective and productive team, manage work performance and manage the interference between all project units,
• Communicate and work with sections Heads to meet deadlines and respect of standards and planning.
• Evaluate progress and hold data for quantity survey and invoicing.
• Ensure reporting frameworks are established and maintained to assist decision making, manage variations and delays efficiently and effectively.
• Ensure that the project is executed within the specified constraints of scope, time and cost.
• Deliver project to achieve objectives, manage costs, quality, timeliness and ongoing accountability of the project. Provide status reports and project planning.
• Build and maintain productive internal and external relationships to facilitate the delivery of the project through creating and maintaining strong relationships with senior key stakeholders.
• Ensure the project is compliant according to OHS&E.
• Evaluate and control all necessary resources for project execution like personnel, equipment, materials and documentation.
- Project Budget : 380 000 000 $
-
World Food Programme (UN)
- Construction and Facilities Manager
2010 - 2013
Overall construction works and facilities management (Storage areas/warehouses, office buildings, Maintenance workshops, bunkers, guesthouses, auxiliary premises …), including all project phases until closing (initiating, design, calculation notes, planning, tendering, awarding, contracting, supervision and QC/QA controlling, reporting, claims management, quantity survey, billing approval, acceptance, …), also, conducting engineering site assessments of WFP facilities, developing master plans for renovation and construction projects, identifying issues and develop remedial plans, by utilizing appropriate international and local code and construction specifications and following specific security measures as defined by Management Services at HQ.
-
RAISSY Company (Saudi Arabia)
- Project Manager
2010 - 2010
Assigned as Project Manager for:
- O/H HV line loop-in loop-out in SHORAN Substation in MEDINA/KSA (foundations, supply and erection of two Towers, SA, SCE and Anchors, stringing of conductors and OPGW, splicing, jumpering, …), achieved at 100%.
(Project Budget: 3 000 000 $)
- Pipe Racks and Reinforcement of Steel Structure in MARAI Plant / KSA, achieved at 100%.
(Project Budget: 1 800 000 $)
- Water Pipe, Pump Stations, Reservoir Stations, Line valve Stations between AL-TAYEF and AL-BAHA / KSA with National Water Company; I have achieved the planning process (Statement Of Work, Work Breakdown Structure, Responsibility Matrix, Gantt, Resource Plan, Budget, Procurement Plan, Risk Plan, Quality Plan, …). The execution was programmed to be started on 01/12/2010.
(Projects Budget: 21 000 000 $).
-
SAUDI ELECTRICITY COMPANY
- Civil Unit Head
1999 - 2010
Responsible of Transmission Substation civil work Unit - Central Operating Area:
- Civil work Maintenance of Substation Buildings, updating procedures and technical specs,
- Construction of warehouses, workshops, offices’ buildings (design, preparation of drawings, specifications, tendering, contract documents, inspection of works, acceptance),
- Fire zoning in 186 Substations 132/380 KV and 240 Substations 13.8/33 KV (preparation of technical specifications, tendering, contract documents, inspection of works, acceptance),
- Improvement of ventilation of transformer and reactors rooms (changing from normal steel & concrete roofs to Louvered Sunshade Roofs),
- Rehabilitation of burned substations (preparation of repairing plan, specs, tendering, preparation of contract documents),
- Participation in approval of technical specifications and drawings of New Substations in coordination with Turnkey Project Department & Engineering and Design Department,
- Commissioning of Substations/Extensions before energizing & follow-up of repair of snags,
- Project Coordinator (as Substation Maintenance Department deputy) with relevant departments (turnkey Projects, Engineering & Design, Distribution, Industrial Security) concerning new projects, ...
(Approximate Total Budget for all projects I was assigned as project manager or project coordinator/Civil Works Part: 122 000 000 $)
-
Société tunisienne de l'électricité et du gaz
- Senior Site Engineer & Senior Design Engineer
Tunis
1995 - 1999
* 5 months internship training in the construction of the "combined cycle - Sousse" which consists of two gas turbines (120 MW each) and one steam turbine (127 MW): revision of technical documents and specifications, drawings, and monitoring of civil works under execution (foundations, seawater pumping station, steel structure erecting, waterproofing of basements, chimney concreting, etc.).
* Senior Site Engineer in Project Power Plant RADES II (2x160 MW):
(Project Budget – Civil Part: 25 000 000 $)
Responsible of the inspection of civil and metallic structure works of the power plant RADES II (2x160 MW- steam turbines):
- approval of concrete and steel structure design & drawings,
- Evaluation of tender documents,
- Participation in the committee of Bid Evaluation,
- Direct subordinate staff for spot survey, investigation, collect data relating to works of civil engineering,
- Give relevant instructions in matters concerning the inspection of Civil works: drilling, piling, foundations, steel structure, concrete works, pumping station, dismissal channel, cooling system seawater piping, building offices, auxiliary offices, machinery buildings, pipe racks, tanks, etc.
- Preparation of Work Progress Reports,
- Liaison with contractors regarding program and delays,
- Assessment of liability for delays and penalties based upon contractor’s submission,
- Preparing contractual correspondence with contractors and Follow-up on claims and ensure prompt resolution on pending issues,
- Evaluate potential risks to the Contractors and to the projects and thereafter suggest measures to reduce risks to acceptable levels,
- Review of all contractors billing based on the contracts,
- Coordination with mechanical and electrical survey sections concerning interference of works.
* Senior Design Engineer in Transmission Networks Division:
- Structure design and preparation of tender documents & drawings for Transmission Substations (Transformer foundations, fire walls, cable trenches, Switchgear Rooms, Control Room, Auxiliary Equipment Room, Batteries Rooms, Telecom & SCADA Rooms) in Locations JBEL JLOUD, KORBA, BOUFICHA & KASSERINE,
- Civil design and preparation of tender documents for capacitors in 12 Substations,
- Technical investigation of 13 existing Substations and preparation of technical specifications of repair and tendering,
- Upgrading specs and standards and preparation of Drawing Models for New Substations.
-
AEUD - Engineering consultancy office
- Civil & Structure design Unit Head
1994 - 1994
- Design of quay (DUC D'Albe/Alva duke) in "LA GOULETTE" port in Tunis,
- Design of 2 traditional fishing ports in Tunisia,
- Design and preparation of detailed drawings for floating pontoons and jetty of Marina in Hammamet-South/Tunisia,
- Structure design of SAADI Shopping Center "Panorama" in Tunis/Tunisia,
- Structure design of Headquarters of the National Fund for Social Security building (22-story building),
- Structure design of Dalots (Concrete Water Conduits) on line railway Gabes - Sfax in Tunisia,
- Evaluation and approval of the tender documents and drawings of the bridge structure design over River ElSod in Sidi Bou Ali / Tunisia.
-
MINISTRY OF FISHING AND MARITIME ECONOMY - MAURITANIA
- Consultant (Technical and Financial advisor) with Director of execution of Traditional Fishing Port
1992 - 1994
Technical/Financial advisor to the project Director of the construction of fishing port in Nouadhibou, a project funded by AFESD (Donor) including: dredging "crabs Bay”, jetties, floating pontoons, freezer rooms, ice tower, offices building, workshops, wharf repair dock with lift, fuel and water distribution networks, Fishing nets repairing Areas, parking areas, sand traps, ...
-
BETAP SA - Engineering consultancy office
- Design Engineer
1990 - 1991
Leading the evaluation of technical studies, tender documents and drawings of the project of construction of traditional fishing port in NOUADHIBOU /MAURITANIA, several structure design (Offices buildings, Villas, workshops, Blocs A & B of University “ZITOUNA”), and inspection of works of various building projects and roads.