Menu

Mohammed EZZINE

ALGER

En résumé

Production Engineer with 21 years experience in oil & gas industry, our concerne is to digitize our asset to be conforme to international standards to reduce OPEX and increase NPV.
started as gas wells operations supervisor and production engineer including Production planning and monitoring using Petroleum software such as PIPESIM, GAP, HYSYS.

Mes compétences :
Réservoir Engineering
Monitoring
Field Operations
Facilities
Data Management
Real Time Field Management
Amélioration des performances
Gestion de la production
Production monitoring
Well Services
Onshore Oil & Gas
Waste management
Workshop Training
Well testing
Well Servicing
Waste water
Strong Logs evaluation skills
Software Training
SCADA
Risk assessment
Production Wells
Petroleum
PIPESIM
Oil processing
Oil Field
Microsoft Word
Microsoft PowerPoint
Microsoft Office
Microsoft Excel
Gas separation Analysis
Coiled Tubing
Audit
Asset Allocation

Entreprises

  • Production Department - Production Team Leader

    2005 - maintenant Responsibilities include:
    Participate in the preparation of Production Department budget;
    Predict budget to ensure continuity of operational installations and high skilled personal recruitment;
    Well testing in Surface using separator, VX technology and downhole testing using PLT for Build-up test.
    Coaching, mentoring and motivating Teams from field and office;
    Leading and Managing data for SCADA deltaV system;
    Data filtering and Well modeling for Wells in South Gas Field and Oil rim;
    Gaslift Optimization of south HRM field using PIPESIM software;
    System Applications and support for Production and Software Data feeding;
    Data Gathering and Analysis for sensors calibration and instruments;
    Data Preparation and filtering to launch Field instrumentation tender;
    Production monitoring: more than 400 Gas wells, 200 Gas cycling injection wells and 80 oil wells producer in Hassi-R'mel Field (Trias Sandstone Reservoir). about 07 oil wells in Tight sandstone Reservoir in the south of Hassi-R'mel;
    Gaslift Optimization in vertical and horizontal Oil producers, production around 10 MBOPD - Onshore operations;
    Prepare new well design with Gas Lift. As well as Flowline authorization sheet to indentify optimum Flowline and waste water injection line route;
    Investigate potential well problems/opportunities and proposed well service activities to restore and/or improve the daily production as predicted schedule;
    Contribute in Real Time monitoring Field Project to optimizing asset resources;
    Gas-Lift optimization using overall Smart field SCADA control; Prosper and Pipesim
    Contribution to the development of several projects in production Enhancement. (BaSo4 inhibition, Deep valve Gas-lift,...); flow assurance
    Leading Team in Avocet software for implementation and configuration of Production Calculation and troubleshooting, including Decision point;
    E&P data management to fit annual Prediction and Company Goal; OFM
    Providing solutions to Production Engineers in site and office;
    Assuring Safety meeting and operations programs with third-party;
    Participates in technical studies concerning water/gas injection and artificial lift projects, oil and gas operations, CTH facilities optimization or modification;
    Maintain production at its Maximum Efficient Rate;
    Providing support to a production area of oil and gas production wells and Gas-lift wells;
    Production troubleshooting through Optimizing Gas-lift and surface water injection;
    Preparing and editing relevant engineering reports for the management;
    Production back allocation from Oil Storage area facilities to overall wells to achieve the production prediction;
    Editing and controlling the daily production reports using Avocet software;
    Identifies opportunities to improve efficiency and reduce costs.
    Appointed as COACH, to train new Engineers and Technicians related topics. Up to date, about 20 new engineers being trained and 50 Technicians and Engineers for the final cycle studies.
  • sonatrach - Sr. petroleum engineer

    2000 - 2005 Responsibilities include:
    Production monitoring: 400 Gas condensate producer wells in Trias Sandstone Reservoir and 60 Oil wells from Oil rim Trias and Lower serial Trias Sand Stone Reservoir. Production around 8000 mmscf/d of wet Gas (Gas Field.) and 20 MBOPD (Oil Rim.) - Onshore operations.
    Supervise stimulation jobs about 50 matrix acidification job to improve Gas wells productivities well HR11 (Qgbefore= 01mmscm/d to 03 mmscm/d after acidification);
    Well testing data Interpretation, Build up before and after acidification jobs;
    Evaluate well results with the Reservoir engineer, geologist and other services;
    The gain resulting after 3 months from the acidification campaign is about 30%.
    Investigate potential well problems and proposed well service activities (Wells operations) to maintain production level as prediction plan.
    Production monitoring of 200 gas recycling wells, 60 Oil gaslifted wells. Gaslift Optimization and troubleshooting, to optimize production and balance between injectors and producers
    Coordinate and lead all related work in Field Development South part of Oil rim.
    Follow up completion program for new well drilled in Oil and Gas reservoirs. Logs review (CBL, VSP, GR, Neutron) and perforation selections (under balance or over balance, TCP, etc.).
    Involved in Gas Lift project from implementation to commissioning, trouble shooting and optimization (using PIPESIM software) of 60 Oil Wells in North Field.
    Involved in Digital Field Pilot in Oil Field on North part Asset (48 wells). Define scope, review workflows and identify/suggest reporting system on wells parameters monitoring and network optimization using SCADA system.
    Works on improving network performance using PIPESIM 2012 software. To solve slot commingling problems, identify production restriction in the flow line and bottle neck. Provide recommendation to solve the problem with expected oil gain about 15% in (Series Inferieure) Oil field in the south part.
  • Sonatrach - Production Engineer

    1995 - maintenant Améliorer et maintenir la production au niveau des prévisions et les objectifs de l'entreprise tout en respectant l'environnement
  • Sonatrach - Jn Petroleum Engineer

    1995 - 2000 Responsibilities include:
    Total production around 20,000 BOPD and 8000 MMSCFD - Onshore operations.
    Gas and Oil wells Operations supervisor including;
    Coiled tubing operations (N2 quick off , Tubing and perforations clean up);
    Fresh water injection within annulus and well head to dissolve salts (halite);
    Electric operations: PLT, RST, Perforation, Temperature survey;
    Stimulation Matrix Acidizing using combination Acids for multilayered reservoir;
    Paraffin dissolving using reformat squeeze in situ for South paraffin's wells;
    Control the quality of the services provided by the Services Companies and their invoices and operations procedures to be conducted in respect of environment;
    Assure the daily operations procedures to be executed in safety manner;
    Supervise Workover operations : Completions, Perforations, Logging, Stimulation;
    Assure all Well maintenance: Surface equipments; Chocks, valves, Shutdown Test.
    Lead PE team to update reservoir performance and NODAL modelling in Oilfield (80 oil wells) to be integrated in network modelling (PIPESIM software).
    Exposed in Gas Lift as artificial lift method; hands on in designing, installing, optimizing and monitoring.
    Reservoir review of ( Série Inférieure) and Layer A in Trias sandstone Reservoir in the south of Hassi-R'mel Gas field for potential gas production to secure buyer demand of gas Contract (Condensate, LGP, Natural Gas);
    Member of multidisciplinary review group charged with evaluation of new lead and prospect in the area (new Blocs development).
    As well service coordinator/supervisor, investigate potential well problems and proposed well service activities to maintain and improve production.
    Investigate potential well problems and proposed well service activities to maintain and improve production.
    Together with senior engineer, prepare, follow up and monitor work over program for changing tubing 13%Cr in Gas wells.

Formations

  • INHC (Boumerdes)

    Boumerdes 1987 - 1992 Petroleum Engineering

    Hydraulic Fracturation Analysis in Hassi-Messaoud Oil Field
  • INHC (Boumerdes)

    Boumerdes 1987 - 1992 Production des Hydrocarbures

    Maintenant l'Université de mohamed Bougara

Réseau

Annuaire des membres :