Montigny-le-Bretonneux2011 - maintenantSONANGOL – CANUKU WELL ABANDONMENT PROJECT (ANGOLA)
Well Decommissioning Project consisting in Plugging and Abandonment of 8 Subsea wells in Angola for Sonangol.
- Preparation of installation procedures, well decommissioning procedures, installation drawings.
- Define the materials or services to be purchased within the allocated resource budget e.g. installation aids, sea-fastening, cantilever platform, lifting rigging.
- Approval of the X-Tree lifting analysis, sea-fastening analysis, structural analysis.
- Mobilization, follow-up of the Installation / Operation on board S3000 and DSV Iremis Da Vinci (7months Offshore Campaign).
- Offshore management of the sub-contractors job and approval of the quality reports
- Preparation, issuance to Client and approval of the end of well reports, as-built documentation.
Montigny-le-Bretonneux2011 - 2011EXXON –CRITICAL CRUDE (NIGERIA) - SCNL YARD / SB230
- Preparation of 24” pipeline installation procedures.
- Coordinate between Pipelay barge and shore team the shore pulling of 3 x pipelines
- Manage the fabrication and resolve show stopper for delivery of spools and riser guards (15 items), in accordance with schedule.
- Daily organization and management of the offshore Fleet from SCNL base, including 3 Construction Vessels + associated Tugs, Supply Vessels, 2 Off Cargo Barges + Tug and Security vessels.
- Logistic Management for delivery of project equipment offshore.
- Planning of the Fleet, Fuel, Water and Offshore Equipment delivery.
Saipem
- Offshore Field Engineer
Montigny-le-Bretonneux2007 - 2010I spent 3 years offshore in rotation 8/4 weeks on board Saipem Fleet for the Installation of offshore structures in West Africa, E.A.U, Mediterranean and Adriatic Sea for Deep-water and Shallow-water projects.
2010: F.E on-board Saipem S3000, FDS
- TOTAL - GEP PROJECT ( ANGOLA) - S3000
Installation of a 16" gas pipeline
- TOTAL - LIBONDO (CONGO) - FDS
1 x Jacket Weight :1500 mT
Riser Bundle 92m length, Subsea Power Cable
2 x spools 6", 2 spools 6"
2009: F.E on-board Saipem S3000, MSV Bourbon Trieste, S355
- TOTAL - AKPO (NIGERIA) - MSV BT
Installation of 3 x Jumpers, 3 x HFLs / 6 x EFLs and Riser Monitoring System
As built surveys of Pipelines, Umbilicals, Drilling Centers
- EXXON - ADRIATIC LNG (ADRIATIC SEA) - S355
Riser 30" rotation and set up, Spool 30" fabrication, installation and trenching, Fiber Optic Cable pulling, 30 x mattresses, Precom of 30" Pipeline + 30" Spool + 30" Riser
2008: F.E on-board Saipem S3000, S355
- SONANGOL - FPSO GIMBOA DRY DOCK (DUBAI)
12 x Fairleads, Turndown Sheaves Chain Stoppers, Pigtail Initiation Test and Chain Installation/sea fastening
- S3000 DRY DOCK (SOUTH AFRICA)
AHC system installation - Follow up and report of S3000 refurbishment.
- ENI AWA PALOUKOU (CONGO) - S3000
1 Jacket 1500 mT, 1 Deck 1700 mT, 12 Conductor Pipes,
1 Spool + 22 Mattresses
Total
- Master Offshore - Training Period
COURBEVOIE2007 - 2007• Set up and validation of a FPSO (Floating, Production, Storage, Offloading) topsides equipment weight estimates model
• Conception engineering department : analyse of the production and construction parameters, set up of the model and optimization of the weight estimates, work within an international team